![Manitowoc GROVE GMK5150L Скачать руководство пользователя страница 767](http://html.mh-extra.com/html/manitowoc/grove-gmk5150l/grove-gmk5150l_operating-manual_701194767.webp)
Rigging work
12.3 Rigging work after driving with a dolly
Operating manual
3 302 709 en
12 - 19
GMK5150L
1
2
.0
1.
201
8
12.3
Rigging work after driving with a dolly
If the main boom is resting on a dolly whilst the truck crane is being driven,
you must perform the following before working with the crane:
– Switch off the boom floating position;
– Switch off the slewing gear freewheel;
– Switch off boom pre-tensioning, if necessary;
12.3.1
Switching off the boom floating position
You must switch off the boom floating position before you raise the main
boom off the dolly.
•
Remove the padlock (
2
).
•
Switch over valve
I
– lever (
1
) horizontal and
pointing outward.
•
Secure the lever (
1
) with the padlock (
2
).
•
Switch the valve
IV
over – lever (
3
) points
forwards.
The boom floating position is now switched off.
G
Risk of accidents from the main boom dropping down
Always secure the lever with the padlock after switching off the boom
floating position.
This prevents the raised main boom falling down when the lever is
actuated.
Содержание GROVE GMK5150L
Страница 1: ...Operating manual 3 302 709 en 12 01 2018 ...
Страница 6: ...12 01 2018 2 3 302 706 en Additional page GMK Blank page ...
Страница 8: ...31 08 2018 2 3 302 808 en Additional pages GMK Blank page ...
Страница 12: ...22 11 2018 4 3 302 834 en us Correction sheet GMK5150 GMK5150L Blank page ...
Страница 14: ...28 11 2018 2 3 302 839 en Additional pages GMK Blank page ...
Страница 16: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 18: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 20: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 24: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 30: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 32: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 36: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 42: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 45: ...Operating manual 3 302 709 en GMK5150L 12 01 2018 15 15 Index ...
Страница 46: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 48: ...Overview 1 1 Accidents 1 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 50: ...Overview 1 4 Terms used 1 4 3 302 709 en Operating manual GMK5150L 12 01 2018 1 4 Terms used ...
Страница 52: ...Overview 1 4 Terms used 1 6 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 82: ...Overview 1 10 Identification 1 36 3 302 709 en Operating manual GMK5150L 12 01 2018 1 10 Identification ...
Страница 416: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 4 Operating manual GMK5150L ...
Страница 420: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 8 Operating manual GMK5150L Side panel ...
Страница 436: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 24 Operating manual GMK5150L ...
Страница 448: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 36 Operating manual GMK5150L Blank page ...
Страница 486: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 74 Operating manual GMK5150L Blank page ...
Страница 494: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 82 Operating manual GMK5150L Blank page ...
Страница 496: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 84 Operating manual GMK5150L Blank page ...
Страница 610: ...Crane operation 11 1 Before operating the crane 11 20 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 612: ...Crane operation 11 2 Standard slewing range type 11 22 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 680: ...Crane operation 11 5 Crane operation with main boom 11 90 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 738: ...Crane operation 11 7 Working range limiter 11 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 778: ...Rigging work 12 5 Starting the engine for rigging 12 30 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 802: ...Rigging work 12 8 Outrigger operation 12 54 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 818: ...Rigging work 12 8 Outrigger operation 12 70 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 896: ...Rigging work 12 10 Rigging work on the main boom 12 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 906: ...Rigging work 12 11 Other rigging work 12 158 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1020: ...Index 15 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1039: ......
Страница 1040: ......