Published 05-16-17, Control # 233-03
3-35
999 SERVICE/MAINTENANCE MANUAL
ELECTRIC SYSTEM
3
5.
Drum 2 pedal command is in percent (0% applied, 100%
fully released).
6.
Drum 2 PC output to proportional valve in percent of
pressure (0% to 100%).
7.
Drum 2 measured pressure to clutch/brake piston in psi.
8.
Drum 2 clutch/brake command is (0 disengaged,
1 engaged).
Swing
1.
The handle command is in percent from neutral (+ right
and - left). For certain operating conditions the handle
command can be set to neutral by the controller even if
the handle is not in neutral.
2.
The pump command is in percent from neutral (+ right
and - left).
3.
Measured pump pressure swing right (port A) in psi.
4.
Measured pump pressure swing left (port B) in psi.
Swing Speed/Torque
See Swing Speed/Torque Adjustment in Operator Manual.
Drum Slip
See Free Fall Drum Slip Adjustment in Operator Manual.
Track
1.
The right handle/pedal command is in percent from
neutral (+ forward, - backward). For certain operating
conditions the handle command can be set to neutral by
the controller even if the handle is not in neutral.
2.
The right pump command is in percent from neutral
(+ forward, - backward).
3.
The left handle/pedal command is in percent from
neutral (+ forward, - backward). For certain operating
conditions the handle command can be set to neutral by
the controller even if the handle is not in neutral.
4.
Left pump command in percent from neutral (+ forward,
– backward).
5.
Measured system pressure right track in psi.
6.
Measured system pressure left track in psi.
7.
Parking brake command (1 release, 0 engage).
RIN
Depending on the crane configuration, RIN computers are
mounted in the universal boom top junction box, luffing jib top
junction box, or fixed jib top junction box (
The junction boxes are interconnected in series with
electrical cords that run up the boom to the last attachment
component. The RIN computer in universal boom top
junction box receives inputs from load sensors, limit
switches, angle sensors, and other RIN computers in series.
The RIN computer in universal boom top junction box
transmits output information to crane EPIC computer in
operator’s cab.
The RIN diagnostic screen is to assist in troubleshooting the
boom top, luffing jib or fixed jib electrical system.
The following voltages can be displayed on the first six banks
of the RIN diagnostic screen. These voltage values can be
compared with the voltages shown on the LMI (Rated
Capacity Indicator/Limiter) diagnostic screen.
If the voltages do not match, the EPIC computer and the LMI
are not communicating properly.
1
3
2
4
SWING
1
5
2
6
3
7
4
TRACK
Bank 1
—
Boom Angle
Bank 2
—
Luffing Jib Angle
Bank 3
—
Lower Boom Point
Bank 4
—
Upper Boom Point
Bank 5
—
Lower Luffing Jib Point
Bank 6
—
Upper Luffing Jib Point or Fixed Jib Point
FIGURE 3-14
A1042
Universal Boom Top
Junction Box
Luffing Jib Top
Junction Box
Fixed Jib Top
Junction Box
RIN
1
5
2
6
3
7
4
8
Содержание 999
Страница 1: ...R e f e r e n c e O n l y Service Maintenance Manual Manitowoc 999 ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 4: ...R e f e r e n c e O n l y THE ORIGINAL LANGUAGE OF THIS PUBLICATION IS ENGLISH ...
Страница 173: ...R e f e r e n c e O n l y Manitowoc Published 05 16 17 Control 233 03 4 19 999 SERVICE MAINTENANCE MANUAL BOOM 4 ...
Страница 174: ...R e f e r e n c e O n l y BOOM 999 SERVICE MAINTENANCE MANUAL 4 20 Published 05 16 17 Control 233 03 ...
Страница 297: ...R e f e r e n c e O n l y ...
Страница 298: ...R e f e r e n c e O n l y ...