![Manitowoc 16000WA Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/manitowoc/16000wa/16000wa_operators-manual_701142049.webp)
Reference
Only
Manitowoc
Published 03-18-13, Control # 116-09
4-19
16000 WIND ATTACHMENT OPERATOR’S MANUAL
SET-UP AND INSTALLATION
4
Prepare Boom Cap
Raise Wire Rope Guide
See Figure 4-11 for following procedure.
1.
Attach one leg of lifting sling (2, View A) to the lifting hole
in wire rope guide (3).
2.
Hoist just enough to support the wire rope guide and
remove pins (4, View A).
3.
Raise the wire rope guide to the working position (View
C) and pin struts (5) to the lugs on the boom cap.
j.
Disconnect the lifting sling.
Remove Mast Straps and Links from Storage
See Figure 4-11, View A for following procedure.
1.
Attach a nylon lifting sling to the top end of strap (6)
using a “choker” hitch.
2.
Hoist just enough to support strap (6) and links (7).
3.
Remove pins (8 and 9).
4.
Lift the strap and links clear of the boom cap.
5.
Reinstall pins (8 and 9, View C).
6.
Lay the straps and link on the ground and disconnect the
lifting sling.
7.
Repeat the above steps for the other strap and links.
8.
Connect straps (6) and links (7) to the boom straps:
See Figure 4-12 for following procedure.
a.
Attach a nylon lifting sling to the pin at the top end of
links (7, View A).
b.
Lift strap (6) and links (7) into position at the butt end
of insert (10, View A).
c.
Remove pins (11, View B), rotate links (12) to the
working position (View A), and install pins (11).
d.
Pin links (13, View A) to strap (6) with pin (14).
Pin (14) is stored in a pocket on the vertical lacing of
the insert.
e.
Lower strap (6) and links (7) to the folded position
(View A).
9.
Disconnect the lifting sling.
Remove Strap Brackets from Storage
1.
Remove strap brackets (15, Figure 4-11
View A) from
storage.
2.
Store two pins (16, Figure 4-11
,
View C).
3.
Install strap brackets (15, Figure 4-13) under the top end
of the straps on the transition insert.
Legend for Figure 4-11, 4-12, and 4-13
Item
Description
1
Boom Cap
2
Lifting Sling (4-leg chain slings)
3
Wire Rope Guide
4
Pin with Cotter Pins (2)
5
Strut (2)
6
Strap (2)
7
Links with Connecting Pin (4)
8
Pin with Hair-Pin Cotters (2)
9
Pin with Safety Pin (2)
10
Insert
11
Pin with Cotter Pins (2)
12
Links (4)
13
Links (4)
14
Pin, with Collar, Retaining Pin, and Cotter Pins (2)
15
Strap Bracket (2)
16
Pins with Cotter Pins (4)
FIGURE 4-12
7
6
13
14
10
12
11
10
13
12
11
View B
SHIPPING
View A
WORKING
FIGURE 4-13
15
16
Boom Strap at End
of Transition Insert
Existing Pins at End of
Transition Insert
Содержание 16000WA
Страница 1: ...R e f e r e n c e O n l y Operator Manual Manitowoc 16000WA ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 4: ...R e f e r e n c e O n l y The original language of this publication is English ...
Страница 8: ...R e f e r e n c e O n l y ...
Страница 10: ...R e f e r e n c e O n l y ...
Страница 20: ...R e f e r e n c e O n l y ...
Страница 24: ...R e f e r e n c e O n l y ...
Страница 26: ...R e f e r e n c e O n l y ...
Страница 88: ...R e f e r e n c e O n l y C B A E D F D E F Upper Point 1 Part Upper Point 2 Part Lower Point FIGURE 4 37 ...
Страница 92: ...R e f e r e n c e O n l y ...
Страница 94: ...R e f e r e n c e O n l y ...
Страница 96: ...R e f e r e n c e O n l y ...
Страница 106: ...R e f e r e n c e O n l y ...
Страница 109: ...R e f e r e n c e O n l y ...
Страница 110: ...R e f e r e n c e O n l y ...