background image

Page 87

Version 2023-06-15

Fire damper - FDMR

TPM 140/19

Hinge plates

2x

Ø

9

M8 t

o M

16

120

80

5

0

4x

Ø

9

M20

100

150

If in doubt, always consult an anchor specialist
engineer such as Halfen or Hilti.

1

Threaded rod M8 - M20

2

Nut M8 - M20

3

Washer for M8 - M20

4

Coupling Nut M8 - M20

5

Anchor

6

Hinge plate - min. thickness 10 mm

7

Concrete screw tested for fire resistance R30-R90,
max. Tension up to 0.75 KN (length 35 mm)

Load  capacities  of  threaded  rods  F  [N]  at  the

required fire resistance 90 minutes

Size

As [mm²]

Weight G [kg]

for 1 piece

for 1 pair

M8

366

22

44

M10

58

35

70

M12

843

52

104

M14

115

70

140

M16

157

96

192

M18

192

117

234

M20

245

150

300

Without anchor

With anchor

 Examples of anchoring to the ceiling construction

Follow the instructions of fixing specialist or installation company

With hinge plate and anchors

Screw  with  internal

thread and hexagon drive

The dampers must be suspended using threaded rods and
mounting  profiles.  Their  dimensioning  depend  on  the
weight of the damper.

The dampers and the duct must be suspended separately.

Following  air-conditioning  duct  must  be  suspended  or
supported so that all load transfer from the following duct

to  the  damper  flanges  is  absolutely  excluded.  Adjacent
duct must be suspended or supported, as required by the
duct suppliers.

Threaded  rods  longer  than  1,5  m  must  be  protected  by
fire insulation.

Mounting to the ceiling wall

V. SUSPENSION SYSTEMS

Содержание FDMR

Страница 1: ...Dob sk 550 267 24 Hostomice Czech Republic Tel 420 311 706 742 E Mail mandik mandik cz FDMR Fire damper Technical Documentation Installation Commissioning Operation Maintenance and Service Manual TPM...

Страница 2: ...all construction 28 Installation outside solid wall constrution 35 In gypsum wall construction 38 Installation outside gypsum wall constrution 46 Installation in sandwich wall construction 49 Shaft wa...

Страница 3: ...rovided under the following conditions maximum air velocity 12 m s maximum pressure difference 1200 Pa the air circulation in the whole damper section must be secured steady over the entire surface Da...

Страница 4: ...reached Automatic initiation of the manual control is not activated if the temperature does not exceed 70 C In case that other activation temperatures are required thermal fuses with nominal activati...

Страница 5: ...f protection IP 67 Working temperature 25 C 120 C Limit switch G905 300E03W1 This limit switch is possible to connect in two following ways CUT OFF if the arm is moving connect wire 1 2 SWITCH ON if t...

Страница 6: ...he position CLOSED takes maximum 20 sec In case that the power supply is restored again the blade can be in any position the actuator starts to rotate the damper blade back to the position OPEN A ther...

Страница 7: ...5 ms Protection class II III Degree of protection IP 54 Running time motor spring return 60 s 20 s Ambient temperature normal duty safety duty non operating temperature 30 C 55 C The safe position wil...

Страница 8: ...Degree of protection IP 54 Running time motor spring return 60 s 20 s Ambient temperature normal duty safety duty non operating temperature 30 C 55 C The safe position will be attained up to max 75 C...

Страница 9: ...ection IP 54 Running time motor spring return 120 s 16 s Ambient temperature normal duty safety duty non operating temperature 30 C 50 C The safe position will be attained up to max 75 C 40 C 50 C Con...

Страница 10: ...ion device BAT If the thermal fuse Tf1 is interrupted due to temperature outside the duct it is necessary to replace the spring return actuator Thermoelectric activation device BAT is integral part of...

Страница 11: ...N 100 mm to DN 200 mm including The smoke detector is supplied separately Design 41 and 51 Design 41 with actuator BF 24 TN BFL BFN 24 T with smoke detector ORS 142 K and with supply device BKN 230 24...

Страница 12: ...or is supposed to be controlled without any signal from the central it can be switched on by means of a bridge between the terminals 3 and 4 A green LED on BKN 230 24 is on when voltage is present in...

Страница 13: ...thout any signal from the central it can be switched on by means of a bridge between the terminals 3 and 4 A green LED on BKN 230 24 C MP is on when voltage is present in the drive AC 24V If the test...

Страница 14: ...ctor is activated when smoke spreads in air duct system Deactivation of the smoke detector alarm status is provided by interruption of supply voltage for min 2s The smoke detector is not part of the d...

Страница 15: ...th an external smoke detector Design 62 Communication and supply device BKN 230 24MP Nominal voltage AC 230 V 50 60Hz Power consumption 8 W including actuator Dimensioning 10 VA including actuator Pro...

Страница 16: ...the safety relay opens and stays in this state even if the smoke disappears from the scanning chamber The sensor remains in the alarm state until the power supply is briefly reset On the pin 3 an exte...

Страница 17: ...trol and checks of fire dampers with the BF 24 TN ST BFL 24 T ST BFN 24 T ST actuator in conjunction with the BKN 230 24 supply and communication device BKS 24 1B receives information about the situat...

Страница 18: ...of the connected fire dampers It is possible to signalise functions such as the damper position and failure reports or to transmit them further to the system by means of integrated auxiliary switches...

Страница 19: ...SPIRO design with manual control 1 Damper casing 2 Manual control 3 Damper blade 4 Inspection opening cover 5 Sensor sticker 6 Hole for camera 300 50 120 110 400 180 50 D 2 120 300 50 50 130 130 110 4...

Страница 20: ...per blade 4 Inspection opening cover 5 Sensor sticker 6 Hole for camera d mm d1 mm d2 mm n number of holes in the flange 100 130 10 4 125 155 10 8 160 195 10 8 180 215 10 8 200 235 10 8 225 260 10 8 2...

Страница 21: ...39 X D 2 300 50 X 110 400 180 50 D 2 Design SPIRO with spring return actuator 1 Damper casing 2 Spring return actuator 3 Damper blade 4 Inspection opening cover 5 Thermoelectric activation device BAT...

Страница 22: ...5 12 12 500 545 12 16 560 605 12 16 600 650 12 16 630 680 12 16 710 760 12 20 800 860 12 20 d d1 d2 n 400 130 130 110 X D 400 D 110 136 39 X 400 X 110 180 D Design FLANGE with spring return actuator 1...

Страница 23: ...alues are specified in chapter Technical parameters see page 24 Values a and c has to be respected when projecting following air conditioning duct c a c a Fire damper with installation brackets Weight...

Страница 24: ...215 20 BFL M1 225 4 8 5 3 0 0275 25 BFL M1 250 9 5 1 5 3 3 0 0354 25 BFL M2 280 24 5 7 5 9 3 0 0462 25 BFL M2 300 34 6 2 6 4 3 0 0542 25 BFL M2 315 42 6 5 6 7 3 0 0606 25 BFL M2 350 59 8 1 8 2 3 0 075...

Страница 25: ...opening or closing The distance between the fire damper and the construc tion wall ceiling must be 75 mm at the minimum according to EN 1366 2 If two or more dampers are to be installed in one fire se...

Страница 26: ...or fire damper installation Built in edge BUILT IN EDGE label indicates the recommended edge of installation of a fire damper in the fire separating construction wall ceiling The damper must be instal...

Страница 27: ...nstallation frame R1 52 In solid ceiling construction 110 Concrete 125 Aerated concrete Mortar or gypsum EI 90 ho i o S EI 120 ho i o S 53 2 dampers in one opening mortar or gypsum EI 90 ho i o S 54 W...

Страница 28: ...2 Solid wall construction 3 Mortar or gypsum 4 Clamp with threaded rod see pages 87 to 89 5 Duct In solid wall construction mortar or gypsum For connection of following duct see page 90 X X 100 40 1 5...

Страница 29: ...is filled with mortar or gypsum It is possible to install up to 4 dampers symmetrically in one opening Y X 100 X 40 1 50 100 D min D 80 max D 300 2x D 30 120 min 2x D 30 80 max 2x D 120 300 A A Y 40 1...

Страница 30: ...mm HILTI CFS CT coating is overcoated on the support construction and on the damper casing duct 7 Fire resistant mastic HILTI CFS S ACR fill the gap from both sides of the fire separation construction...

Страница 31: ...00 25 300 25 50 D min D 80 max D 220 50 1 FDMR 2 Solid wall construction 3 Mineral wool board min density 140 kg m3 e g PROMAPYR T150 ROCKWOOL HARDROCK STEPROCK HD 4 Fire resistant coating th 1 mm e g...

Страница 32: ...resistant foam HILTI CFS F FX 4 Stucco plaster 5 Clamp with threaded rod see pages 87 to 89 6 Duct For connection of following duct see page 90 Installation is limited to DN 200 mm diameter X 40 130 D...

Страница 33: ...xt to the wall ceiling mortar or gypsum mineral wool For connection of following duct see page 90 Conditions of this installation are also valid for the installation in Solid ceiling construction Pene...

Страница 34: ...on 4 Mortar or gypsum 5 Duct In solid wall construction installation next to the wall ceiling mortar or gypsum For connection of following duct see page 90 Conditions of this installation are also val...

Страница 35: ...uct to the fire damper is absolutely excluded Adjacent duct must be suspended or supported as required by the duct suppliers If the threaded rod is located inside the duct insulation distance between...

Страница 36: ...ickness density fire reaction class tested according to EN 1366 3 For connection of following duct see page 90 Minimum and maximum distance between the wall and fire damper is unlimited When installin...

Страница 37: ...ation construction 12 Clamp with threaded rod see pages 87 to 89 300 25 300 25 50 D min D 80 max D 220 50 400 100 60 180 For connection of following duct see page 90 Minimum and maximum distance betwe...

Страница 38: ...80 max D 300 1 FDMR 2 Gypsum wall construction 3 Mortar or gypsum 4 Clamp with threaded rod see pages 87 to 89 5 Duct In gypsum wall construction In gypsum wall construction mortar or gypsum For conne...

Страница 39: ...x D 300 B B B 100 40 150 100 A A 40 150 30 120 30 120 1 FDMR 2 Gypsum wall construction 3 Mortar or gypsum 4 Clamp with threaded rod see pages 87 to 89 5 Duct In gypsum wall construction 2 dampers in...

Страница 40: ...ystem HILTI 5 Mineral wool board min density 140 kg m HILTI CFS CT B 1S 140 50 6 Fire stop coating th 1 mm HILTI CFS CT coating is overcoated on the support construction and on the damper casing duct...

Страница 41: ...sted according to EN 1366 3 1 FDMR 2 Gypsum wall construciton with wooden supporting construction wooden beams min 60x60 mm 3 Duct 4 Clamp with threaded rod see pages 87 to 89 Weichschott system HILTI...

Страница 42: ...on of following duct see page 90 EIS 90 1 FDMR 2 Gypsum wall construction 3 Mineral wool board min density 140 kg m3 e g PROMAPYR T150 ROCKWOOL HARDROCK STEPROCK HD 4 Fire resistant coating th 1 mm e...

Страница 43: ...For connection of following duct see page 90 Installation is limited to DN 200 mm diameter In gypsum wall construction fire resistant foam with stucco plaster EIS 60 1 FDMR 2 Gypsum wall construction...

Страница 44: ...ns of this installation are also valid for the installation in Solid ceiling construction Penetration is filled with mortar or gypsum mineral wool shape according to the location of the damper Fix the...

Страница 45: ...sum wall construction installation next to the wall ceiling mortar or gypsum For connection of following duct see page 90 Conditions of this installation are also valid for the installation in Solid c...

Страница 46: ...en installing the insulation follow the ISOVER manufacturer s instructions The damper and the duct must be suspended separately The duct must be suspended on both sides of damper acc to national rules...

Страница 47: ...ruction and around the perimeter of penetration and damper casing For connection of following duct see page 90 Minimum and maximum distance between the wall and fire damper is unlimited When installin...

Страница 48: ...ing duct to the fire damper is absolutely excluded Adjacent duct must be suspended or supported as required by the duct suppliers If the threaded rod is located inside the duct insulation distance bet...

Страница 49: ...00 mm sandwich construction is approx 150 mm 2 pcs large washer M8 2 pcs nut M8 The boards must be tightly fixed to the sandwich wall construction 5 Duct 6 Clamp with threaded rod see pages 87 to 89 W...

Страница 50: ...boards are mounted to tight butt joints without need of cementing The second sheathing layer is screwed to the first sheathing layer using screws Rodurit in square net 250 mm Reset of joints of the fi...

Страница 51: ...rew Rigips Ridurit TX 3 5x35 mm 6 Additional fire resistant board tl 20 mm Rigips Glasroc F Ridurit In shaft wall Rigips mortar or gypsum EIS 90 For connection of following duct see page 90 Follow sha...

Страница 52: ...or connection of following duct see page 90 Follow shaft wall manufacturer s instructions All technical specifications and conditions can be found at www rigips cz Installation frame can be installed...

Страница 53: ...ncrete for EIS 90 and EIS 120 min 150 mm Concrete for EIS 120 110 In solid ceiling construction In solid ceiling construction mortar or gypsum For connection of following duct see page 90 EIS 90 EIS 1...

Страница 54: ...in 125 mm Aerated concrete X Y 40 150 40 150 110 110 110 40 150 110 In solid ceiling construction 2 dampers in one opening mortar or gypsum EIS 90 1 FDMR 2 Solid ceiling construction 3 Mortar or gypsu...

Страница 55: ...ding to EN 1366 3 1 FDMR 2 Solid ceiling construciton 3 Duct 4 Clamp with threaded rod see pages 87 to 89 Weichschott system HILTI 5 Mineral wool board min density 140 kg m HILTI CFS CT B 1S 140 50 6...

Страница 56: ...page 90 EIS 90 1 FDMR 2 Solid ceiling construction 3 Mineral wool board min density 140 kg m3 e g PROMAPYR T150 ROCKWOOL HARDROCK STEPROCK HD 4 Fire resistant coating th 1 mm e g PROMASTOP I 5 Fire r...

Страница 57: ...page 90 Minimum and maximum distance between the ceiling and fire damper is unlimited When installing the insulation follow the ISOVER manufacturer s instructions The damper and the duct must be susp...

Страница 58: ...ended on both sides of damper acc to national rules Duct between fire damper and fire separating construction must be suspended by using threaded rods and mounting profiles or another mounting system...

Страница 59: ...psum For connection of following duct see page 90 Minimum and maximum distance between the wall and fire damper is unlimited When installing the insulation follow the ROCKWOOL manufacturer s instructi...

Страница 60: ...ust be suspended or supported so that all load transfer from the following duct to the fire damper is absolutely excluded Adjacent duct must be suspended or supported as required by the duct suppliers...

Страница 61: ...onstruction Outside construction On construction In construction Outside construction On construction In construction Outside construction On construction R1 100 100 110 125 R2 150 150 150 R3 100 100...

Страница 62: ...h an intumescent sealing on the inside and outside This sealing fills the gap between the damper casing and frame and between the frame and construction in the event of a fire Installation frame R1 so...

Страница 63: ...m Installation frame R2 wall th 150 mm In solid wall construction installation frame R1 R2 EIS 90 1 FDMR 2 Installation frame 3 Bracket with fasteners delivered with frame 4 Fill the gaps with glue PR...

Страница 64: ...symmetrically in one opening 2x D 320 2x D 285 3 20 installation opening 100 D D 160 D 145 3 installation open ing 20 100 2x D 320 2x D 285 3 20 installation opening 20 D D 145 3 installation open ing...

Страница 65: ...stallation in Solid ceiling construction Mineral wool is fixed to the wall construction and to the installation frame with fire protective mastic EIS 90 A A D D 155 3 installation open ing 2x D 315 3...

Страница 66: ...g duct see page 90 Installation frame can be installed on the damper or delivered separately Installation procedure of the installation frame for FDMR see manual Installation frame R1 wall th 100 mm I...

Страница 67: ...ber of brackets Number of screws D 400 4 8 400 D 800 8 16 1 FDMR 2 Installation frame 3 Bracket with fasteners delivered with frame 4 Fill the gaps with glue PROMAT K84 5 Duct 6 Clamp with threaded ro...

Страница 68: ...m wall th 100 mm or solid ceiling th 110 mm Installation frame R2 gypsum wall th 150 mm or solid ceiling th 150 mm Conditions of this installation are also valid for the installation in Solid ceiling...

Страница 69: ...e R1 min 150 mm Concrete for EIS 120 Installation frame R2 1 FDMR 2 Installation frame 3 Bracket with fasteners delivered with frame 4 Fill the gaps with glue PROMAT K84 5 Duct 6 Clamp with threaded r...

Страница 70: ...00 D 800 8 16 1 FDMR 2 Installation frame 3 Bracket with fasteners delivered with frame 4 Fill the gaps with glue PROMAT K84 5 Duct 6 Clamp with threaded rod see pages 87 to 89 7 Solid ceiling constru...

Страница 71: ...an intumescent sealing on the inside and outside This sealing fills the gap between the damper casing and frame and between the frame and construction in the event of a fire Installation frame R3 sol...

Страница 72: ...me 3 Bracket with fasteners delivered with frame 4 Fill the gaps with glue PROMAT K84 5 Duct 6 Clamp with threaded rod see pages 87 to 89 7 Solid wall construction In solid wall construction installat...

Страница 73: ...allation frame R4 ceiling th 150 mm In solid ceiling construction installation frame R3 R4 Bracket with fasteners for 1 damper FDMR diameter Number of brackets Number of screws D 400 4 8 400 D 800 8 1...

Страница 74: ...g Installation frame R5 is only for SPIRO design Installation frame is equipped with an intumescent sealing on the inside This sealing fills the gap between the damper casing and frame in the event of...

Страница 75: ...Solid wall construction 7 Holes for fixing the frame with threaded rods or steel anchors frame fixing material not included 100 D 110 X D D 10 3 installation opening X D 120 for dampers D 100 200 mm...

Страница 76: ...A A 20 10 A A 100 10 10 D D 10 3 installation opening X 4 x 12 20 D 110 In solid wall construction installation next to the wall ceiling installation frame R5 X D 120 for dampers D 100 200 mm X D 167...

Страница 77: ...e for FDMR see manual In gypsum wall construction installation frame R5 X D 120 for dampers D 100 200 mm X D 167 for dampers D 225 800 mm 1 FDMR 2 Installation frame apply HILTI CFS S ACR mastic at th...

Страница 78: ...installation frame for FDMR see manual Conditions of this installation are also valid for the installation in Solid ceiling construction In gypsum wall construction installation next to the wall ceili...

Страница 79: ...crete min 125 mm Aerated concrete 110 110 D In solid ceiling construction installation frame R5 X D 120 for dampers D 100 200 mm X D 167 for dampers D 225 800 mm 1 FDMR 2 Installation frame apply HILT...

Страница 80: ...d on the damper or delivered separately Installation procedure of the installation frame for FDMR see manual Outside solid ceiling construction concreting installation frame R5 1 FDMR 2 Installation f...

Страница 81: ...or Installation outside solid wall ceiling construction with insulation from fire resistant boards Installation frame is equipped with an intumescent sealing on the inside This sealing fills the gap b...

Страница 82: ...suppliers Installation frame can be installed on the damper or delivered separately Installation procedure of the installation frame for FDMR see manual Outside solid wall construction insulation from...

Страница 83: ...0 8 mm 7 Clamp with threaded rod see pages 87 to 89 8 Solid ceiling construction 9 Mortar or gypsum Outside solid ceiling construction insulation from fire resistant boards mortar or gypsum installati...

Страница 84: ...to 150 mm Installation frame is equipped with an intumescent sealing on the inside and outside This sealing fills the gap between the damper casing and frame and between the frame and construction in...

Страница 85: ...l system manufacturer EIS 90 Installation directly on the ceiling Connection of the flexible ceiling according to wall specifications UW profile screwed to the connection of the flexible ceiling Gypsu...

Страница 86: ...romaseal AG Detailed instructions for installation R7 frame see manual For connection of following duct see page 90 Installation frame can be installed on the damper or delivered separately Installati...

Страница 87: ...6 192 M18 192 117 234 M20 245 150 300 Without anchor With anchor Examples of anchoring to the ceiling construction Follow the instructions of fixing specialist or installation company With hinge plate...

Страница 88: ...h threaded rod 2 Solid ceiling construction 7 Damper bracket according to order 3 Gypsum wall constuciton 8 Nut M8 with anchor 4 FDMR 9 Hexagon head screw 5 Duct 10 Gypsum grid from U profile Example...

Страница 89: ...from U profile 12 Fixing element steel bracket for fixing the duct to the wall or ceiling optional accessory MAND K a s 13 Mounting holes for rivets 14 Duct insulation 100 400 Quick closing system 2x...

Страница 90: ...ample of duct connection 1 FDMR 2 Duct 3 Extension piece if required 4 Damping pad 5 Bolt assembly M8 bolt M8x20 mm 2 pcs large washer M8 nut M8 6 Electrically conductive connection of the damping pad...

Страница 91: ...560 600 630 710 800 0 531 0 471 0 455 0 393 0 344 0 307 0 273 0 258 0 243 0 111 0 099 Coefficient of local pressure loss VI TECHNICAL DATA Pressure loss Pressure loss calculation Determination of pres...

Страница 92: ...27 5 30 7 32 9 34 6 37 8 40 41 7 43 2 44 4 4 24 2 29 6 32 8 35 38 1 40 4 42 1 45 3 47 5 49 2 50 7 51 9 5 30 35 4 38 6 40 8 44 46 2 47 9 51 1 53 3 55 1 56 5 57 7 6 34 8 40 2 43 3 45 6 48 7 51 52 7 55...

Страница 93: ...damper casing lower sheet of a manual control lock holder 1 lock lever 2 closing spring 8 dia stopper pin manual control pin 5 Inspection opening cover including the stirrup and fasteners if they are...

Страница 94: ...irect weather impact there must not occur any shocks and ambient temperature must not exceed 50 C Dampers must be protected against impact when transported and manipulated During transportation the da...

Страница 95: ...nufacturer documentation All works done on the fire dampers must be done according international and local norms and laws All effective safety standards and directives must be obse rved during damper...

Страница 96: ...control 8 Spring return actuator 9 Thermoelectric activation device BAT 10 Sensor sticker Change of manual control for the actuator or vice versa DN 100 DN 315 DN 350 DN 800 1 Damper 2 Mounting plate...

Страница 97: ...ally by applying the supply voltage It is recommended to provide periodical checks maintenance and service actions on fire equipment by authorized persons The authorized persons can be trained by prod...

Страница 98: ...have been properly trained by the manufacturer The function checks are to be carried out as a part of function checks of the fire dampers at least 1x a year For the function checks the damper blade sh...

Страница 99: ...h communication and supply device BKN 230 24 C MP with actuator BF 24 TN ST BFL BFN 24 T ST and with smoke detector ORS 142 K 61S With communication and supply device BKN 230 24MP and with actuator BF...

Страница 100: ...19 Data label Data label is placed on the damper casing example WEIGHT kg Dob sk 550 267 24 Hostomice Czech Republic MAND K a s DESIGN SERIAL NO DIMENSION TPM XXX XX R CLASSIFICATION MANUAL Cert No 1...

Страница 101: ...m The producer reserves the right for innovations of the product For actual product information see www mandik com MAND K a s Dob sk 550 267 24 Hostomice Czech Republic Tel 420 311 706 742 E Mail mand...

Отзывы: