22
≥
40
*
Position:
1
Fire damper
2
Solid ceiling construction
3
Mortar or gypsum
4
Stone wool with wired mat on
one side, density 66 kg/m³
5
Duct
≥
40
*
variable***
**
Stuffing box, fire protection mastic, cement lime plate and insulation materials can be
replaced by another approved fire sealing system for damper installation with equivalent
material properties.
***
Depends on the distance of the flap from the construction, when the maximum distance
from the construct is not limited and according to EN 15882-2 must use the required
number of hinges according to EN 13366-1:2014.
≥
100
variable***
≥
100
* min. 110 - Concrete/ min. 125 - Aerated concrete
Used materials - example:**
4
DN 100 ÷ DN 800 - System ISOVER_ULTIMATE PROTECT, th. 100 mm - EIS 60
DN 100 ÷ DN 315 - System ISOVER_ULTIMATE PROTECT, th. 120 mm (2x60 mm) - EIS 90
DN 350 ÷ DN 800 - System ISOVER_ULTIMATE PROTECT, th. 160 mm (100+60 mm) - EIS 90