background image

14

10.  Damper blade overlaps

9.  To provide needed access space to the control device, all other objects must be situated at least 350

mm from the control parts of the damper. Inspection hole must be accessible.

7.   The  fire  damper  can  be  integrated  into  a  solid  or  gypsum  wall  construction  or  into  solid  ceiling

construction. Damper blade has to be inside of construction (labelled BUILD IN EDGE on the damper

body). The fire damper can also be integrated outside the wall construction. Duct and the damper part

between the wall construction and the damper blade (labelled BUILD IN EDGE on the damper body)

must be protected with fire-fighting insulation.

8.   All fire dampers has to be closed during installation process. The damper body should not be deformed

 

in the course of bricking in. Once the damper is built in, its blade should not grind on the damper body

 

during opening or closing.

c

a

c

a

Built in edge

Built in edge

37

5

28

0

37

5

26

0

50

50

Содержание EIS 120

Страница 1: ......

Страница 2: ...struction 100 40 50 Fire damper FDMB Solid wall construction Stuffing box mineral stone wool min density 140 kg m Fire protection mastic min thickness 1 mm Cement lime plate min thickness 15 mm Duct I...

Страница 3: ...ral stone wool min density 140 kg m Fire protection mastic min thickness 1 mm Cement lime plate min thickness 15 mm Duct Installation opening perimeter has to be reinforced by standard drywall profile...

Страница 4: ...l stone wool min density 140 kg m Fire protection mastic min thickness 1 mm Cement lime plate min thickness 15 mm Duct 40 50 min 110 Concrete min 125 Aerated Concrete Installation in a solid ceiling c...

Страница 5: ...B Solid wall construction Stuffing box mineral stone wool min density 140 kg m Fire protection mastic min thickness 1 mm Cement lime plate min thickness 15 mm Duct Installation in a solid wall constru...

Страница 6: ...amper FDMB Gypsum wall construction Fire protection plate of mineral wool Stuffing box mineral stone wool min density 140 kg m Fire protection mastic min thickness 1 mm Cement lime plate min thickness...

Страница 7: ...mineral stone wool min density 140 kg m Fire protection mastic min thickness 1 mm Cement lime plate min thickness 15 mm Duct Around the perimeter min 110 Concrete min 125 Aerated Concrete Installation...

Страница 8: ...tar or gypsum Gypsum wall construction Solid wall construction Duct Fire protection plate of mineral wool Mineral stone wool Fire protection mastic min thick ness 1 mm Cement lime plate min thickness...

Страница 9: ...50 Fire damper FDMB Solid ceiling construction Mortar or gypsum Gypsum wall construction Solid wall construction Duct Fire protection plate of mineral wool Mineral stone wool Fire protection mastic mi...

Страница 10: ...9 100 100 100 Fire damper FDMB Installation frame Solid wall construction 100 100 100...

Страница 11: ...reinforced by standard drywall profiles 100 100 100 Fire damper FDMB Installation frame Gypsum wall construction Fire protection plate of mineral wool Installation opening perimeter has to be reinforc...

Страница 12: ...11 Fire damper FDMB Installation frame Solid ceiling construction min 110 Concrete min 125 Aerated Concrete 150 150 150 150 150 150...

Страница 13: ...has to be used reinforcement VRM III fixing X 23 AxB 500x400 X 36 AxB 500x400 123 110 B B 60 A A 60 375 B X B 60 A X A 60 60 X 2 60 X 2 B B 60 A A 60 375 B X B 60 A X A 60 60 X 2 60 X 2 X 23 AxB 500x4...

Страница 14: ...ocess 2 The control mechanism has to be protected covered against damage and pollution during installation process 3 Min gap for installation installation opening is 25 mm circular dimension D 50 mm o...

Страница 15: ...abelled BUILD IN EDGE on the damper body The fire damper can also be integrated outside the wall construction Duct and the damper part between the wall construction and the damper blade labelled BUILD...

Страница 16: ...de of fire damper exceeds body of fire damper by the value a and c or e and f There has to be enough space in duct for blade rotation Values a and c or e and f has to be respected when projecting rela...

Страница 17: ...ing into operation these revisions must be done according to requirement set by national regulations 1 2 S3 S1 S2 S5 S4 S6 5 80 BAT Tf Tf LED 1 2 S3 S1 S2 S5 S4 S6 N L1 5 80 BAT Tf Tf LED BAT AC 230V...

Страница 18: ...tion CLOSED If this is not possible then the starting mechanism spring must be checked or the base plate must be replaced The base plate is attached to the damper body with M5 screws 16 Before enterin...

Страница 19: ...urface finish 2 Damper blades are made of fire resistant asbestos free boards made of mineral fibres 3 Damper controls are made of galvanized materials with no other surface finish 4 Springs are galva...

Страница 20: ...19 MAND K a s Dob sk 550 26724 Hostomice Czech Republic Tel 420 311 706 706 E Mail mandik mandik cz www mandik com...

Отзывы: