![Man V8-1200 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/man/v8-1200/v8-1200_installation-instructions-manual_4104710010.webp)
Safety regulations
8
Cleanliness
Today modern components of diesel injection consist of high
‐
precision parts which are exposed to extreme
stresses. The high
‐
precision technology requires the
utmost cleanliness
during all work on the fuel
system.
Even a particle of dirt over
0,2 mm
can lead to the failure of components.
The measures described as follows are therefore
essential
before work begins:
Risk of damage from penetration of dirt!
D
Before working on the clean side of the fuel system clean the engine and the engine
compartment. During cleaning the fuel system must be closed.
D
Carry out visual inspection for any leakage or damage to the fuel system
D
Do not spray the high
‐
pressure cleaner direct onto the electric components, or
alternatively keep them covered
D
Do not carry out any welding or sanding work in the engine compartment during
maintenance / repair
D
Avoid air movements (any swirling of dust when starting engines)
D
The area of the still closed fuel system must be cleaned and dried with the aid of
compressed air
D
Remove detached particles of dirt such as paint chippings and insulation material with a
suitable extractor (industrial type vacuum cleaner)
D
Cover areas of the engine compartment from which dust particles could be detached
with clean foil
D
Wash your hands and put on clean work clothes before starting the disassembly work
When carrying out the work it is
essential
to comply with the following measures:
Содержание V8-1200
Страница 1: ......
Страница 2: ......
Страница 12: ...Planning of engine installation 10 V12 1800 1 2 3 4 5 V8 1200 6 7 8 9 4 10 11...
Страница 78: ...Notes 76...
Страница 79: ...77 Appendix...
Страница 80: ......
Страница 91: ......
Страница 92: ......