56
Important
This appliance should be installed with plenty of space on either side.
Gas connection
Connection to the gas supply, or conversion from one type of gas to another
should only be undertaken by an approved and registered gas installer in strict
accordance with local and national safety and building regulations. Every appli
-
ance should have its own isolating valve and test point.
Check with your local gas supplier about the type of gas and its calorific value,
and compare this information with the type of gas quoted on the hob data plate.
The installer is responsible for ensuring that the appliance functions correctly
when installed.
The gas installation must be made in such a way that the isolating valve is visible
and easily accessible after the appliance has been built in.
A test for possible leakages must be carried out after installation.
Safety regulations demand that a pressure test nipple is installed near a gas
hob to allow an engineer to test the pressure following servicing.
Cut-out
Make the countertop cut-out following the dimensions given in the illustration.
Installation
B
D
E
A
C
Содержание AS 9102B NEW
Страница 2: ......
Страница 5: ...5...
Страница 18: ...18 Description of the appliance Model GHG 732A NEW 1 3 4 2 Controls Left Right Burner Pan support 1 2 3 4...
Страница 50: ...50 Description of the appliance Model MDG 01 1 2 3 1 Control 2 Burner Pan support 3...
Страница 52: ...52 Description of the appliance Model DG 01 1 2 3 Control Burner Pan support 1 2 3...
Страница 79: ......