![Malaguti F10 2008 Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/malaguti/f10-2008/f10-2008_workshop-manual_697659023.webp)
NO
OK
Tester (
Ω
)
NO
OK
N
R/VR
B
1
F. 14
R E C H A R G I N G S Y S T E M
. Charging coil resistance
Detach connector of flywheel.
Connect
Tester (Ω)
as follows:
Terminal (+) of Tester
White
cable
(1)
.
Terminal (-) of Tester
Engine grounding
()
.
Charging coil resistance:
1 ÷ 1.2 Ω at 20°C
.
•
•
•
•
•
Replace stator.
NO
. Recharging system connections
Check connections of recharging system.
See “Wiring Diagram” (P. 8).
•
•
Resume connections of recharging system.
Replace voltage regulator (
code n°: 02601100
)
.
Содержание F10 2008
Страница 1: ......