12. CARRYING AND TRANSPORT

A) PLACING THE BOILER ON VEHICLE

  *When the boiler places on vehicle, loading must be with crane.
  * Gates of the wehicle must be opened previously.

  * Make use of the supporting ring while loading boiler with crane.
  * Pass the crane buum hook from the supporting ring. 

  *Make sure that hook pim is in safety.
  *Uphold the crane buum and take the space. 

*Slowly uphold the boiler that  bottom level should be 30-40cm up from the ground.
*Keep away from sudden moves that would cause boiler to shake.

*Move the boiler next  to vehicle in this way.  
*Lift the boiler from 30-40cm higher than the vehicle body and and take it down on vehicle body 

correctly.
*Remove the hook from crane supporting ring.

ATTENTION

 : Boiler must be carried in vertical position, make use of the supporting ring. 

When the boiler lifted up with crane, there shouldn't any living being under the boiler. Boiler 
must be carried with its accessories installed on it.

B)  CARRYING BOILER ON VEHICLE 

When the boiler is carrying with vehicle, it must be tied to vehicle strictly, supporting stuff which 
would prevent slipping, should be put around. Boiler should not carry with fragile, smashable 

and living beings. Top of the vehicle must be covered with canvas after placing boiler. Driver must
keep away from the sudden moves that would cause danger.

C) UNLOADING THE BOILER TO THE PLACE OF USE

Boiler should not be placed in work or residence places, must be placed in a seperate boiler 

room.
When unloading the boiler to boiler room, crane must be used again, points that stated in Clause

A, must be considered.
If the place of use is not appropriate for crane entrance, boiler must be unload in a proper place 

and carry with rollers to the place intended.

Содержание MKK Series

Страница 1: ......

Страница 2: ...FLOOD 9 BOILER INSTALLATION SCHEMA 10 4 2 AIR CONNECTION 10 4 3 CHIMNEY 11 CHIMNEY CONNECTION SCHEMA 12 FEATURES OF THE FUEL 13 5 TECHNICAL FUTURES 14 6 CONTROL PANEL 15 7 FIRST OPERATION AND USE 17...

Страница 3: ...ictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 degrees do not attempt to feed cold water to the...

Страница 4: ...after a certain period The chimney temprature drops enabling a higher efficency The pump cable is extended outside the boilers body for connection The moving grills are designed for easy demounting w...

Страница 5: ...3 SECTIONS OF THE BOILER...

Страница 6: ...periodic cleaning this lid is opened to enable cleaning of the smoke pipes with boiler brush 3 Loading lid The loading of fuel to boiler is done from this lid 4 Disposal lid This is the lid that enabl...

Страница 7: ...supply fresh air to the installation site air ducts is a necessity to avoid the formation of poisonous gases The boiler must be installed in a secure location unaffected by weather conditions This wi...

Страница 8: ...water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra security m...

Страница 9: ...al h 40 lt 25 MKK 25 000 kcal h 50 lt 40 MKK 40 000 kcal h 75 lt 60 MKK 60 000 kcal h 100 lt 80 MKK 80 000 kcal h 200 lt 100 MKK 100 000 kcal h 250 lt 150 MKK 150 000 kcal h 300 lt 200 MKK 200 000 kca...

Страница 10: ...al length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates tar i...

Страница 11: ...ilding if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cement or...

Страница 12: ...ll the smoke pipes of the boiler in short time causing a dramatic decrease on capacity and efficiency of the boiler Please pay special attention to specification of fuel NOTE In order to determine the...

Страница 13: ...5 825 950 1215 1620 1750 2130 w1 180 180 250 250 250 250 250 290 220 220 w2 250 250 250 250 250 250 310 310 310 310 D 130 130 160 160 160 180 250 250 350 350 Circulation Flow Return 1 1 1 1 4 1 1 2 1...

Страница 14: ...6 CONTROL PANEL...

Страница 15: ...s Fan Cycle Increase Button Increases fan speed from 1 to 5 Fan Cycle Decrease Button Decreases fan speed from 1 to 5 Fan Led Indicates that the fan is functioning properly Pump Led Indicates that the...

Страница 16: ...fan must be cancelled until the problem is fixed Gas draught of the chimney must be high A simple way to detect this is to cover the entrance of the chimney with a news paper and see if the paper han...

Страница 17: ...the sytem water temprature reaches to set values on control thermostat At this value the fan will stop and the circulation pump continues to function In this case you can see what temprature is the b...

Страница 18: ...pump might get damaged ATTENTION In case of an electricty cut and when the circulation pump is not functioning the boiler water can reach to a boiling degree since heat transfer will not be done In t...

Страница 19: ...aning lid at the back smoke case and clean inside of the smoke case Make sure that it fits properly during remount Close the cleaning lid and turn off moving grill in order to restart the boiler Chimn...

Страница 20: ...9 ELECTRIC SCHEME...

Страница 21: ...Decrease draught by reinforcement The fan does not stop when it reaches to thermostat value Thermostat is broken Thermostat must be replaced There is tar and soot inside the boiler and chimney Low qua...

Страница 22: ...e use of the supporting ring When the boiler lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VEH...

Страница 23: ......

Отзывы: