R
epair
[4] DISASSEMBLY/ASSEMBLY
[4]-7. Tank complete (Chemical tank) (cont.)
P 1
0
/2
6
(4) Remove Cushion by unscrewing five M5x12 Pan head screws. (
Fig. 27
)
(5) Unscrew two M6x30 Pan head screws to disconnect Tank complete from Tank holder.
Be careful not to lose Flat washer 6 and Compression spring 20. (
Fig. 28
)
(6) Remove Tank complete from Frame complete by unscrewing four M6x30 Pan head screws. (
Fig. 27
)
(7) Remove Tube 10-300 from Joint 1 by removing Hose clamp 14. (
Fig. 29
)
(8) Remove Tube 10-500 from Joint 1 and Upper mixing body by removing
Hose clamp 14. (
Figs. 30, 31
)
(9) Separate Upper mixing body from Lower mixing body by unscrewing
two M5x12 Pan head screws. (
Fig. 31
)
(10) Remove Washer 10 and Check valve from Lower mixing body.
Be careful not to lose Washer 10. (
Fig. 31
)
(11) Remove Joint 1 from Tank complete. (
Fig. 29
)
(12) Remove Grommet from Tank complete. (
Fig. 29
)
DISASSEMBLING
Fig. 27
Fig. 28
Fig. 30
Fig. 31
M6x30
Pan head screw
(2 pcs)
Tank complete
M6x30
Pan head screw
(4 pcs)
Fig. 29
Hose clamp 14
Grommet
Joint 1
Tube 10-300
Joint 1
Hose clamp 14
Tube 10-500
Hose clamp 14
Upper mixing body
Upper mixing body
M5x12
Pan head screw
(2 pcs)
Washer 10
Check valve
ASSEMBLING
Assemble by reversing the disassembly procedure.
Flat washer 6 (2 pcs)
Cushion
M5x12
Pan head screw
(5 pcs)