Makita BTW152 Скачать руководство пользователя страница 4

P  

4

/1

0

R

epair

[3] DISASSEMBLY/ASSEMBLY
[3]-1. Hammer Case Section

DISASSEMBLING

2) Remove Hammer case complete from Bearing box complete using 1R223, 1R224 and another Hex socket 32-50. 
    Hammer case section can now be disassembled as illustrated to right in Fig. 4.
Fig. 4

1R223

1R224

Hex socket 32-50

Hex socket 32-50

Bearing box 
complete

Hammer case
complete

Hammer section

Internal gear 51
O Ring 40

Put another Hex socket 32-50 (134848-9)
over Hammer case complete with this
hexagonal portion fitting into the socket. 

Hammer case

complete

Turn Hex socket 32-50 clockwise
using 1R223 and 1R224.

Содержание BTW152

Страница 1: ...Battery BL1430 Fast charger DC18RA Charger DC18SD Charger DC24SC Catalog value torque at 6 seconds after seating when fastening M16 high tensile bolt Weight according to EPTA Procedure 01 2003 with Ba...

Страница 2: ...s 134848 9 Socket 32 50 2 pcs Disassembling Hammer case complete Apply Makita grease N No 2 and FA No 2 to the portions designated with black and gray triangles to protect parts and product from unusu...

Страница 3: ...cover Separate Hammer case section together with Motor section from Housing L then pull off Motor section from Hammer case section Fix Hex socket 32 50 134848 9 firmly in vise then set Hammer section...

Страница 4: ...ection can now be disassembled as illustrated to right in Fig 4 Fig 4 1R223 1R224 Hex socket 32 50 Hex socket 32 50 Bearing box complete Hammer case complete Hammer section Internal gear 51 O Ring 40...

Страница 5: ...o 40 N m Bearing box complete Internal gear 51 Hammer case complete Aligning the 4 locking grooves on the inside surface of Hammer case complete with the four locking projections of Internal gear 51 s...

Страница 6: ...of the torsion spring 2 Disconnect Carbon brush from the commutator by pulling it in the direction designated with the arrow 3 Pull off Armature and Yoke unit from Brush holder complete Yoke unit Arma...

Страница 7: ...ake sure that Brush holder comp Yoke unit Hammer case comp are placed on Housing L as illustrated in Fig 11 6 Connect Carbon brushes to Armature s commutator then assemble Housing R to Housing L When...

Страница 8: ...Steel ball insertion Steel ball 5 6 2pcs Fig 12 2 Hold Hammer section as illustrated in Fig R and release it from the Gear extractor Note Do not hold gear extractor as illustrated in Fig F when relea...

Страница 9: ...MBLING Assemble F R change lever to Switch and Housing as illustrated in Fig 17 Fig 17 Housing L F R change lever Switch pin of Switch prong portion of F R change lever Fit the pin of Switch into the...

Страница 10: ...e vertical Fix the lead wires connected to each connector with these lead wire holders Put Light circuit in place so that the orange lead wire faces toward the Terminal side Lead wire orange 20 degree...

Отзывы: