Makim Makine Teknolojileri A.Ş. All rights reserved .
11
Kullanım Kılavuzu
6.T300 HG120 HIDDENGATE MOUNTING INSTRUCTIONS
6.1- MOUNTING
1.
Mounting place should be decided as not to prevent the hiddengate working.
2.
You should check the smoothness of the floor to be mounted on, and if it is not straight, it
must be straightened.
3.
Mark the holes to be mounted on the floor. Be careful to locate the units on a line.
Otherwise, the hiddengate sensors will not detect eachother mutually and this will prevent
the units operating.
4.
Drill the marked holes with Ø10 twist bit and clean the dust inside the holes with help of
air.(PICTURE 4)
5.
Locate the fixing plugs in the holes by joeing. If the floor is not solid, joe the fixing plugs
after pouring chemical grout and wait 20 min. for the grout to freze. ( Suggested Chemical
Grout is Hilti HIT HY 150)
6.
Previously prepared power and data cables are passed through the cable passing points on
the hiddengate platform.
7.
Hiddengate platform is put on the steel plugs and fixed to the floor with shims and nuts.
8.
Below you can see the pictures about mounting of the plug and hiddengate to the floor.
M12. STEEL DOWEL
M12SHIM
M10NUT
M10SHIM
8PCS
8PCS
8PCS
8PCS
CABLE CONNECTION PASSING POINTS:
CONNECTION HOLES TO THE FLOOR WITH M12 STEEL
DOWEL
T300 HG120 SINGLE UNIT MATERIAL LIST