LEVELUPS SERİSİ 10-20 KVA
OPERATION
AG-SD-83 / Publication Date: 15.09.2014 / Rev. No: 0 / Rev. Date:
4.1.2 First start-up
WARNING: Wait for at least 5 seconds between each step.
1. Turn all circuit breakers OFF.
2. Push the soft start button (SW1) at least for 10 sec.
3. Turn input circuit breaker (CB1) ON. If there is an external bypass input, put the external
bypass switch (CB5) to position closed circuit (ON)
Содержание LEVELUPS Series
Страница 1: ...USER MANUAL LEVELUPS SERIES 10 20 KVA...
Страница 2: ......
Страница 43: ...LEVELUPS SER S 10 20 KVA OPERATION AG SD 83 Publication Date 15 09 2014 Rev No 0 Rev Date...
Страница 62: ......