
11
STEP 7: Drilling Mounting Holes in the Deck
Place the t-top you have assembled in the area you traced in Step 2. Make
sure the t-top is in the final position where you want it installed. Check
under your floor for any wires or objects before drilling. Consult your
owner’s manual if you are unsure.
Next, pre-drill the holes you traced in
REVERSE
using a 1/8” drill bit followed by a 3/16” drill bit
. Use medium
speed on the drill and apply medium pressure while drilling pilot holes.
Blow away any dust or loose materials from the area.
Содержание Pro2 T-Top
Страница 1: ...1 Pro2 T Top Installation Guide EXPLODED VIEW OF THE PRO2 T TOP FOR REFERENCE...
Страница 3: ...3...