Installation, Operation and Parts Manual
MJ-TS6600
9
INSTALLATION INSTRUCTIONS
4.1 Preparations before installation
4.1.1 Space requirements
Refer to 3.3 for the dimensions of the lift. There must also be a clearance of at least 1 meter (about 39”) between the lifting platform and
fixed elements (e.g. wall) in all lifting positions. There must be sufficient space at the ends of the lifting platform for driving vehicles on and
off.
To stop vehicles colliding with the ceiling, it is advisable to fit an overhead light barrier in low ceiling buildings.
4.1.2 Foundations and connections
The user must have the following work performed before erecting the lift.
Construction of the foundation following consultation with the manufacturer’s customer service or an authorized service agent.
Routing of the wiring to the installation location. Refer also to the corresponding information on the name plate and in the operation
instructions. Before doing electrical connection, make sure the lift is electrically adapt to the local power supply.
The user must provide fuse protection for the connection. Requirements for power supply cable of the installation site: at least
2.5mm
2
(1/8 sq. inch)wire core for 3Ph power and 4.0mm
2
(3/16 sq. inch)wire core for 1Ph power.
Attention: electrical system connection must be done by licensed technicians.
4.1.3 Tools and equipment needed for installation
Tool name
Specification
Qty
Open spanner
D17-19
2
Adjustable spanner
bigger than D30
1
Cross socket screw driver
PH2
1
Lift device
Capacity more than 1100 lbs.
1
Socket spanner
D6
1