Installation, Operation and Parts Manual
MJ-C10
17
Step 7: Install hydraulic power unit onto the power side post.
Step 8: Connect the hydraulic hoses
Connect oil hoses according to the following diagram.
It must be taken adequate care that all fittings are securely tightened and no solid substance go into the hydraulic line, otherwise severe
leakage will occur.
1.Hex head flange bolt M8x30
2.Anti‐vibration pad
3.Hex head flange nut M8
4.Hydraulic power unit
1.Oil hose A
2.Hydraulic cylinder
3.Three way connector
4.Oil hose B
5.Oil hose C
6.Composite connector
7.Power unit
1. Steel cable A
2. Steel cable B