background image

11

SHR Series  Woodburning Fireplaces

20001384

The 

inside dimension

 of the frame 

must be 

the same 

as the hole size selected from Figure 11 in order to 
provide the required 2 inches of air space between the 
outside diameter of the chimney and the edges of the 
framed ceiling hole.

Positioning, Safety Strips, 

Securing the Fireplace

Slide fireplace into position.
Lift the fireplace front slightly and slide the metal safety 
strips under front bottom edge about 1

¹⁄₂

 inches, allow-

ing the remainder to extend in front of firebox. Overlap 
strips at least 1/2 inch to provide a positive joint. (Flat 
safety strips are packed with fireplace.) (Fig. 16) 
Safety strips are used to ensure that any combustible 
materials in front of the fireplace are protected even 
though a noncombustible hearth extension is required.
If fireplace is to be elevated above the floor, a “Z” 
shaped metal safety strip must be fabricated and used 
to protect combustible surfaces in front of the fireplace.  
This “Z” shaped safety strip is not provided but must 
be fabricated of metal with each horizontal leg at least 
1

¹⁄₂

 inches wide and equal in length to the metal strips 

provided with the fireplace.

NOTE:  

Safety strips are not required over noncombus-

tible floors where all supports at the base of the fire-
place are noncombustible.
Four (4) nailing flanges are supplied with the fireplace 
(found on the fireplace hearth). To level the box and 
secure it firmly in place, remove the nailing flanges from 
the hearth and install at the sides of the fireplace as 
shown in Figure 17.

FP557a

SHR

5/11/99   djt

����

"

FP557a

Fig. 16

  Safety strip installation.

Metal Safety Strips

(1, 2 or 3 pieces)

"Z" Safety 

Strip

(not supplied)

Hearth Ext.

Plat-

form

Fire-

place

1/2" Min. 

Overlap

FP549

9/29/97

BR/BC

FP549

Fig. 17

  Fasten fireplace in position.

Nail Side-

nailing 

Flanges

Installing Outside Air Kit

An outside air damper assembly is installed in all SHR 
Series Fireplaces. If desired, or if local codes mandate 
the use of an air kit, then an AK-MST is required to 
complete the installation (from air damper assembly 
to the outdoors). If the outside air kit is to be used, the 
AK-MST 

MUST

 be installed 

BEFORE

 the fireplace is 

enclosed. Refer to the AK-MST instructions for field 
installation. The outside air control lever is located in 
the center, just above the left side brick. To 'open', push 
control lever up and back. To 'close', pull lever forward 
and down. (Fig. 18)

FP551b

SHR

5/11/99   djt

New Framing 

Members

Existing 

Ceiling 

Joists

Chimney 

Hole

17

¹⁄₂

"

(445 mm)

FP551b

Fig. 15

 Typical frame for ceiling chimney hole

17

¹⁄₂

"

(445 mm)

Содержание SHR36

Страница 1: ...HR Series Woodburning Fireplace For Models SHR36 SHR42A SHR48 SHR52 Underwriter s Laboratories Report No MH6018 DO NOT DISCARD THIS MANUAL Retain for future use 20001384 4 08 Rev 21 Homeowner s Instal...

Страница 2: ...o ration in combination or assembly with a CFM Corporation replace system notwithstanding any independent testing laboratory or other third party approval of such component parts or accessory Any such...

Страница 3: ...Gas Line Access Gas Line Access 1365mm FP546A Fig 2 SHR42A Series speci cations and framing SHR42A Series Woodburning Fireplace 36 914mm 46 1175mm 44 1118mm 610mm 189mm 13 Dia 340mm Rough Opening Widt...

Страница 4: ...Access Gas Line Access 1518mm SHR48 Series Woodburning Fireplace Fig 3 SHR48 Series speci cations and framing FP545A 9 235mm 52 1321mm 62 1584mm 52 1334mm 838mm 189mm 13 Dia Rough Opening Width 63 Rou...

Страница 5: ...att Insulation cut out around restop Firestop Ceiling Level Draftstop Ledge Bracket Surround Damper Control Gas Line Knockout both sides Screen Grate Firebox Metal Safety Strips 1 2 or 3 Outside Air C...

Страница 6: ...h to the chimney exit SHR36 SHR42A SHR48 SHR52 Max 90 90 90 90 Min 0 Elbows 14 6 14 6 16 0 16 0 2 Elbows 15 6 15 6 19 0 19 0 4 Elbows 21 0 21 0 24 0 24 0 B Do not use more than 4 elbows per chim ney A...

Страница 7: ...2 A chimney cannot be offset more than 30 degrees from a vertical plane 3 A chimney may run straight up or it may be neces sary to offset it to avoid obstructions 4 The maximum length of an angled run...

Страница 8: ...how the chimney system should be run contact your Majes tic Fireplaces dealer for assistance Insulating Fireplace Enclosure for Cold Climates If you live in a cold climate it is not required but high...

Страница 9: ...corner be hind the end of the left rebrick Push both panels back as far as possible into the left side and corner 4 Swing the right side of the back rebrick into place Attach the left brick in place u...

Страница 10: ...hed by using CFM Corporation elbows Use the 30 Offset Elbow table on Page 6 to determine proper offset and parts required Each offset requires two 2 elbows The second elbow is equipped with support st...

Страница 11: ...ety strips are not required over noncombus tible oors where all supports at the base of the re place are noncombustible Four 4 nailing anges are supplied with the replace found on the replace hearth T...

Страница 12: ...Spacer in the Ceiling Hole A restop spacer is used to keep pipe spaced properly and required for safety Nail the restop spacer at each corner to the framing members of the ceiling hole Note A restop...

Страница 13: ...te Run Continue attaching pipe sections to complete system to next level always being careful that the pipe is rmly snap locked in place before proceeding to next pipe section Chimney Supports If chim...

Страница 14: ...hase installation CAUTION Treatment of restop spacers and construc tion of chase may vary with type of building These instructions are not a substitute for local building codes You must check your loc...

Страница 15: ...in 1 12 305mm Max 12 305mm min 1 6 159mm Min 3 4 FP531 Fig 24 Mantel clearance Header Must be sealed with non combustible material Surround Face Finished Wall Ledge Bracket Finished Wall Ledge Bracket...

Страница 16: ...front 12 20 01 djt CAUTION Do Not Place Finishing Ma terial Beyond These Edges or Cover Air Inlets Screen Rail Hearth FP1168 Fig 28 Finishing front of replace MA81 rev 8 5 97 rev 4 18 01 1 Ref MA81 F...

Страница 17: ...alue of the al ternate material employed is greater than or equal to R 1 09 Thermal resistance R or thermal conductivity K may be obtained from manufacturer of the material Factors are related by the...

Страница 18: ...will vary depending on thickness of noncombustible surround facing 4 Shaded area starts 1 2 away from edge of unit A B C D E F G H J SHR36 20 12 35 42 18 14 8 16 52 508 mm 305 mm 457 mm 356 mm 203 mm...

Страница 19: ...Corporation replaces Be sure to have the appliance installed in accordance with building codes Gas connection may enter from either left or right side of the replace Locate appropriate gas line in the...

Страница 20: ...0006021 20001431 20005569 4 Screen Rod two per replace 7554181 7554199 20001428 20005790 5 Screen two per replace 7554295 20001723 20001723 20005278 6 Screen Pull two per replace 5584139 5584139 55841...

Страница 21: ...accessories for this appliance are available from your local Majestic Fireplaces distributor Should you need additional information beyond what your distributor can furnish contact CFM Corporation 269...

Страница 22: ...CFM Corporation Type 11CF Chimney Systems Used to terminate chimney at top of chase Adapter kit included Flashing not included Used to build 11CF chimney systems Used to develop 30 offset chimney sys...

Страница 23: ...nstalled in the continental United States the state of Alaska and Canada only if and so long as the Fireplace is installed or serviced by a quali ed installer preferably NFI or WETT Canada certi ed an...

Страница 24: ...CFM Corporation 2695 Meadowvale Blvd Mississauga Ontario Canada L5N 8A3 800 668 5323 www cfmcorp com CFM Corporation...

Отзывы: