DVRTSB Bay Window Fireplace

10003848 

Requirements for the Commonwealth of 
Massachusetts

All gas fitting and installation of this heater shall only be 
done by a licensed gas fitter or licensed plumber.
For all side wall horizontally vented gas fueled 
equipment installed in every dwelling, building or 
structure used in whole or in part for residential 
purposes, including those owned or operated by the 
Commonwealth and where the side wall exhaust 
vent termination is less than seven (7) feet above 
finished grade in the area of the venting, including 
but not limited to decks and porches, the following 
requirements shall be satisfied:

Installation of Carbon Monoxide Detectors

At the time of installation of the side wall horizontal 
vented gas fueled equipment, the installing plumber 
or gas fitter shall observe that a hard wired carbon 
monoxide detector with an alarm is installed on each 
additional level of the dwelling, building or structure 
served by the side wall horizontal vented gas fueled 
equipment. It shall be the responsibility of the property 
owner to secure the services of qualified licensed 
professionals for the installation of hard wired carbon 
monoxide detectors.
In the event that the side wall horizontally vented gas 
fueled equipment is installed in a crawl space or an 
attic, the hard wired carbon monoxide detector with 
alarm and battery back-up may be installed on the next 
adjacent floor level.
In the event that the requirements of this subdivision 
can not be met at the time of completion of installation, 
the owner shall have a period of thirty (30) days 
to comply with the above requirements; provided, 
however, that during said thirty (30) day period, a 
battery operated carbon monoxide detector with an 
alarm shall be installed.

Approved Carbon Monoxide Detectors

Each carbon monoxide detector as required in 
accordance with the above provisions shall comply with 
NFPA 720 and ANSI/UL 2034 listed and IAS certified.

Signage

A metal or plastic identification plate shall be 
permanently mounted to the exterior of the building at 
a minimum height of eight (8) feet above grade directly 
in line with the exhaust vent terminal for the horizontally 
vented gas fueled heating appliance or equipment. The 
sign shall read, in print size no less than one-half (1/2) 
inch in size, 

“GAS VENT DIRECTLY BELOW, KEEP 

CLEAR OF ALL OBSTRUCTIONS”.

Inspection

The state or local gas inspector of the side wall 
horizontally vented gas fueled equipment shall not 
approve the installation unless, upon inspection, the 
inspector observes carbon monoxide detectors and 
signage installed in accordance with the provisions of 
248 CMR 5.08(2)(a)1 through 4.

Exemptions

The following equipment is exempt from 248 CMR 
5.08(2)(a)1 through 4:

• 

The equipment listed in Chapter 10 entitled 
“Equipment Not Required To Be Vented” in the most 
current edition of NFPA 54 as adopted by the Board; 
and

• 

Product Approved side wall horizontally vented gas 
fueled equipment installed in a room or structure 
separate from the dwelling, building or structure 
used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS

Gas Equipment Venting System Provided

When the manufacturer of Product Approved side 
wall horizontally vented gas equipment provides a 
venting system design or venting system components 
with the equipment, the instructions provided by the 
manufacturer for installation of the equipment and the 
venting system shall include:

• 

Detailed instructions for the installation of the venting 
system design or the venting system components; 
and

• 

A complete parts list for the venting system design or 
venting system.

Gas Equipment Venting System NOT Provided

When the manufacturer of a Product Approved side 
wall horizontally vented gas fueled equipment does 
not provide the parts for venting the flue gases, but 
identifies “special venting systems”, the following 
requirements shall be satisfied by the manufacturer:

• 

The referenced “special venting system” instructions 
shall be included with the appliance or equipment 
installation instructions; and

• 

The “special venting systems” shall be Product 
Approved by the Board, and the instructions for 
that system shall include a parts list and detailed 
installation instructions.

A copy of all installation instructions for all Product 
Approved side wall horizontally vented gas fueled 
equipment, all venting instructions, all parts lists 
for venting instructions, and/or all venting design 
instructions shall remain with the appliance or 
equipment at the completion of the installation.

Installation & Operating Instructions

Содержание DVRTSB

Страница 1: ...bor s phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the fire department DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND OR LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE Bay Window Rear Top Convertible Direct Vent Fireplaces Model DVRTSB INSTALLER CONSUMER SAFETY INFORMATION PLEASE READ THIS MANUAL BEFORE INSTALLING AND USING APPLIANCE FOR...

Страница 2: ...stallation 15 Below Grade Installation 18 Vertical Through the Roof Applications Installation 19 Vertical Through the Roof Installation 19 Twist Lock Vent Components 21 Operating Instructions Glass Information 22 Louvre Removal 22 Glass Frame Removal 22 Glass Cleaning 23 Ceramic Refractory Installation 23 Installation of Logs 23 Lava Rocks Ember Material 24 Flame Temperature Adjustment 24 Flame Ch...

Страница 3: ...burning or oil fired appliances and the products of combustion of such fuels contain chemicals known to the State of California to cause cancer birth defects and other reproductive harm California Health Safety Code Sec 25249 6 WARNING Check with your electronics manufacturer before installing a television or other electronic de vice above this fireplace must be installed on a metal or wood panel ex...

Страница 4: ... gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS Inspection The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless upon inspection the inspector observes carbon monoxide detectors and signage installe...

Страница 5: ...Box Inlet 3848 Fig 2 Fireplace specifications and framing dimensions Ref DVRTSB Top Vent A 35 888 mm B 34 873 mm C 32 831 mm D 34 885 mm E 2 56 mm F 2 51 mm G 17 444 mm H 24 610 mm I 5 139 mm J 2 61 mm Framing Dimensions K 24 610 mm minus one finishing material thickness to be even with face of unit L Not to be framed until unit is set in place due to 3 79 mm allowance for flue collar M 35 888 mm min...

Страница 6: ...alled as Rear Vent 3848 Gas Line Inlet EB1 Box Inlet Fig 3 Fireplace specifications and framing dimensions Ref DVRTSB Rear Vent A 35 888 mm B 34 873 mm C 32 831 mm D 34 885 mm E 2 56 mm F 2 51 mm G 17 444 mm H 24 610 mm I 5 139 mm J 2 61 mm Framing Dimensions K 24 609 mm minus one finishing material thickness to be even with face of unit L 35 895 mm M 35 888 mm minus twice the finishing material thic...

Страница 7: ...distance between the mantel leg if fitted and the fireplace For the correct mounting height and widths refer to Figure and the Mantel Chart below Noncombustible mantels and legs may be installed at any height and width around the appliance When using paint or lacquer to finish the mantel such paint or lacquer must be heat resistant to prevent discoloration Clearance to Combustibles Mantel Chart Mante...

Страница 8: ...s at elevations above 4 500 feet 1 370m Gas Line Installation When purging the gas lines the front glass must be removed The gas pipeline can be brought in through the side and back of the fireplace as well as the bottom Knockouts are provided on the bottom behind the valve to allow for the gas pipe installation and testing of any gas connec tion It is most convenient to bring the gas line in from ...

Страница 9: ...he socket assembly 6 Connect the black wire of the power supply line to the brass screw polarized of the socket assembly 7 Refit the socket assembly back into the electrical box and replace the cover plate 8 The EB 1 electrical junction box is now ready to supply power to the FK12 or FK24 fan kits if fitted EB 1 Electrical Box 1 Thread the wiring through the holes on the end panels of the appliance ...

Страница 10: ...e intake box and remove the cover and gasket Fig 11 5 Remove four 4 screws securing the flue pipe to back of the intake box and remove pipe and gasket Fig 11 6 Secure the plate and gasket removed in Step 4 over the flue opening in the back of the intake box Ensure the gasket is in place and undamaged 7 Install the flue pipe and gasket removed in Step 5 over the flue opening in the top of the intake bo...

Страница 11: ...ding Horizontal venting must be installed on a level plane without any incline or decline There must not be any obstruction such as bushes gar den sheds fences decks or utility buildings within 24 from the front of the termination hood Location of Vent Termination It is imperative the vent termination be located observ ing the minimum clearances as shown on this page Check with local codes or in a...

Страница 12: ...m 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 other appliances appliances 10 000 Btuh 3kW and 23cm for appliances 10 000 100 000 Btuh 30kW 36 91cm Btuh 3kW and 50 000 Btuh for appliances 100 000 Btuh 30kW 15kW 12 30cm for appliances 50 000 Btuh 15kW K Cl...

Страница 13: ...r this is not mandatory with twist lock pipe NOTE For ease of assembly use a lubricant Vaseline or similar substance on male end of twist lock pipe prior to assembly Outside Corner Inside Corner Termination Clearances Termination clearances for buildings with combustible and noncombustible exteriors G Combustible 6 152 mm Noncombustible 2 51 mm F Combustible 6 152 mm Noncombustible 2 51 mm G Balco...

Страница 14: ...zontal distance between the rear of the appliance and the outside face of the rear wall is 20 508mm Fig 16 The minimum clearances between any combustible material and the vent pipe sections are Top 2 51 mm Sides 1 25 mm Bottom 1 25 mm When the vent termination is installed in an accessible location a Screen Guard Kit item 7V1B60 should be installed Accessible means the termination is likely to be ...

Страница 15: ...lp to deter mine the various dimensions allowable Minimum clearance between vent pipes and combustible materials is one 1 25mm on top bottom and sides unless otherwise noted When the vent termination exits through foundations less than 20 508 mm below siding outcrop the vent pipe must flush up with the siding It is always best to locate the fireplace in such a way that minimizes the number of offset...

Страница 16: ... 45 elbow installed in the horizontal run the length of the horizontal run MUST be reduced by 18 45cm This does not apply if the 45 elbows are installed in the vertical part of the vent system The maximum number of elbow degrees in a system is 270 Fig 22 7 6 2286mm A B A B 17 Max 5 2m 90 FP1382 Fig 21 Maximum vent run with elbows 1 2 3 4 1 2 3 4 270o 1 2 3 4 FP1383 Fig 22 Maximum number of elbows ...

Страница 17: ... level plane STEP 6 Use appropriate length of pipe sections telescopic or fixed and install The section which goes through the wall is packaged with the starter kit and can be cut to suit if necessary Sealing vent pipe and firestop gaps with high tem perature sealant will restrict cold air being drawn in around fireplace X X FP1385 Fig 26 Horizontal length requirement STEP 4 Apply a bead of silicone ...

Страница 18: ...the soil If the foundation is recessed use recess brackets not supplied for securing lower portion of the snorkel Fasten brackets to wall first then secure to snorkel with self drilling 8 x 1 2 sheetmetal screws It will be necessary to extend vent pipes out as far as protruding wall face Fig 28 Zero Clearance Sleeve if Required Firestop 7 Pipe 7DVSKS Snorkel Screws Minimum 4 Clearance Ground Window...

Страница 19: ...flashing Fig 33 9 Install storm collar and seal around the pipe Fig 33 10 Add additional vent lengths for proper height Fig 31 The enlarged ends of the vent section always face downward 11 Apply high temperature sealant to 4 and 7 collars of vertical vent termination and install Vertical Through The Roof Installation The minimum height of the vent above the highest point of penetration through the ...

Страница 20: ...e ceiling level a 7DVAIS Attic Insulation Shield must be installed TWL101a Twist Lock Pipe 2 8 99 djt 3 5 Sheet Metal Screws per Joint Sealant Storm Collar TWL101a Fig 33 Roof flashing FP1029 attic insulation shield firestop spacers 1 28 00 djt Attic Insulation Shield Upper Floor 11 279mm Joist Firestop Spacer Nails 4 FP1029 Fig 34 Attic insulation shield and firestop spacer installation 11 279mm ...

Страница 21: ...stible length Pipe sections for vertical or horizontal venting Model 7TDVP8 4 per box Model 7TDVP12 4 per box Model 7TDVP24 4 per box Model 7TDVP36 Model 7TDVP48 Firestop Spacer Model 7DVFS Attic Insulation Shield Model 7DVAIS Vertical Horizontal Combination Offset Support Model 7DVCS 7TBSG 7 T L DVRTSB Termination Screen Guard Kit 584B Vent components Starter Kit 2 25 99 djt 584C Vent components ...

Страница 22: ...re assemblies Operating Instructions Glass Information Louvre Removal 1 2 Louvre Glass Panel FP1390 Fig 35 Louvre removal Glass Frame Removal Front Glass Frame 1 Shut off the gas supply 2 Allow the fireplace to cool if it has been in operation 3 Remove the top louvre assembly 4 Lower the bottom louvre assembly 5 Release the two clamps along lower edge of the frame by pulling down on clamp handles F...

Страница 23: ...of Logs The logs can be identified by the number cast into their underside The logs must be correctly placed in the order described for the correct operation of the fireplace Refer to Figures 30 40 for log location and alignment 1 Unpack the logs from the shipping carton Handle the logs carefully as they are fragile Handle and dispose of the plastic bags in a safe manner They are not toys and should...

Страница 24: ...stment knob for Honeywell valve LO H I FP390 FLAME ADJUSTMENT KNOB 11 21 96 Turn counterclockwise to increase flame height Turn clockwise to decrease flame height Fig 42 Flame adjustment knob for SIT valve Lava Rock Ember Material Your log set contains two types of Lava Rocks The placement of this material is best done after the logs have been installed Ceramic Ember Rocks Pt 57897 Remove these ro...

Страница 25: ...re to the illustrations below Figs 43 44 If the flame patterns appear abnormal contact a qualified service provider for service and adjustment Flame Characteristics FP1394 pilot flame combo 3 8 1 2 SIT Pilot PSE Pilot FP1394 Fig 43 Correct pilot flame appearance LG300 DVRTSB log flames 7 03 LG300 Fig 44 Correct burner flame appearance ...

Страница 26: ... LIGHTING smell all around the heater area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to light any fireplace Do not touch any electric switch Do not use any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s To Turn Off Gas To Heater Lightin...

Страница 27: ...r wire accross terminals at wall switch if burner comes on replace defective wall switch If okay jumper wires across wall switch wires at valve if burner comes on wires are faulty or connections are bad B Thermopile may not be 1 Be sure wire connections from thermopile at generating sufficient gas valve terminals are tight and thermopile is fully millivoltage inserted into pilot bracket 2 One of th...

Страница 28: ...y Line Hooked Up Shutoff Valve Open Pilot Stays Lit For Air In The Lines Thermopile Needs A Min 325mv Adjust Pilot Flame Height All Wiring Connections Replace Thermopile Thermocouple Needs A Min Of 14mv Pilot Lights Main Burner Valve Is Turned On Wall Switch Is Not Turned On Watch For Grounded Wires Thermopile Needs A Min 325mv Plugged Burner Orifice Defective Valve Turn To Pilot Meter Should Read ...

Страница 29: ...is properly posi tioned and install the new HI LO pressure regulator to valve using the new screws E supplied with the kit Tighten screws securely Reference torque 25 in LB c Install the enclosed identification label F to the valve body where it can be easily seen Honeywell Gas Control Valve Fig 12 The Honeywell valve fitted to this unit is suitable for use with LP or Natural Gas It is converted to ...

Страница 30: ...llivolt gas valve Most of these components may require only an oc casional checkup and cleaning and some may require adjustment If repair is necessary it should be per formed by a qualified technician Logs May Be HOT 1 Turn off pilot light at gas valve side 2 Let fireplace cool if it has been running 3 Remove window frame assembly Refer to Window Frame Assembly Removal section 4 Remove logs 5 Vacuum...

Страница 31: ...2 38 62 39 42 37 63 41 63 36 3848 DVRTSB parts 7 03 CFM Corporation reserves the right to make changes in design materials specifications prices and discontinue colors and products at any time without notice DVRTSB Units B02A01 B02B01 Ref Description DVRTSB 1 Log Set Complete 10003855 1a Log Rear Left B105 1b Log Rear Right B106 1c Log Front Left B107 1d Log Front Right B108 ...

Страница 32: ... Pilot Tube w Fitting SIT not shown 10001296 15a Orifice Pilot PSE Nat not shown 10001822 15b Orifice Pilot PSE Prop not shown 10001823 16a Orifice Pilot Top Convertible Nat not shown 10002268 16b Orifice PIlot Top Convertible Prop not shown 10002269 17 Manifold Tube and Fittings not shown 10002492 18 Flexible Gas Line 18 w Fittings not shown 20002500 19 Thermocouple PSE 10001828 20 Thermocouple SIT T...

Страница 33: ...ory Lining Rear Wall Right 10003888 49 Refractory Lining Floor Left 10003890 50 Refractory Lining Floor Right 10003891 51 Refractory Lining Floor Front 10003892 52 CR Floor Kit w o Rear 10003889 53 Air Inlet Cover Plate Assembly not shown 10002766 54 Air Inlet Plate Gasket not shown 10002449 55 Flue Pipe Plate Assembly not shown 10002509 56 Flue Pipe Plate Gasket not shown 10002237 57 Flue Cover P...

Страница 34: ...onnected in two ways Method A Route the 6 lead fitted to the unit to a conveniently located wall socket Method B The EB I receptacle box Pt ZA1200 may be hard wired into the house supply The fan lead is then plugged into the EB I box Optional Accessories Fan Kits FP1395 EB1 DVRTSB 7 03 Electrical Inlets Holes FK24 Fan Electrical Box EB 1 Fan Speed Control Box FP1395 Fig 48 FK24 fan location Heat Se...

Страница 35: ...on trol FP1025 Fig 49 FK24 fan wiring The fireplace when installed must be electrically connected and grounded in accordance with local codes or in the absence of local codes with the current CSA C22 1 Canadian Electric Code For USA installations follow the local codes and the national electrical code ANSI NFPA No 70 Should this fan require servicing or repair the power supply must be disconnected ...

Страница 36: ...36 DVRTSB Bay Window Fireplace 10003848 ...

Страница 37: ...37 DVRTSB Bay Window Fireplace 10003848 ...

Страница 38: ...38 DVRTSB Bay Window Fireplace 10003848 ...

Страница 39: ...shop Ifuponinspection thedamageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of this warranty is covered for six months or the remainder of the original warranty whichever is longest This warranty is limited to the repair of or replacement of part s found to be defective in mat...

Страница 40: ...ficiency Fan OFF Fan ON AFUE DVRTSB RN 58 4 81 82 64 DVRTSB RP 58 4 82 83 64 DVRTSB RFN 58 4 81 82 64 DVRTSB RFP 58 4 82 83 64 DVRTSB EN 60 4 81 82 64 DVRTSB EP 60 4 82 83 64 2695 Meadowvale Blvd Mississauga Ontario Canada L5N 8A3 800 668 5323 www cfmcorp com CFM Corporation ...

Отзывы: