background image

Majestic • Ashland ASH36 Installation Manual  • 4059-909 • Rev D • 04/19

34

D. Mantel and Wall Projections

The combustible mantel may have a maximum depth of 12 

in. (305 mm). Positioned 22 in. (559 mm) above the open

-

ing.  Combustible trim pieces that project no more than 1- 

1/2 in. (38 mm) from the face of the fireplace can be placed 

no closer than 6 in. (152 mm) from the top of the opening. 

7 ft (2134 mm)

minimum

base of fireplace

to ceiling

Combustible Wall

2 x 4 stud wall

Standoffs

Measured from top of fireplace opening

12 in./305 mm

1 1/2 in./38 mm

maximum

Mantel

22 in./559 mm

minimum

Combustible 

Decorative Facing

6 in./152 mm

minimum

12 in./305 mm

minimum

Grid represents

1 in. squares

Non-combustible

Decorative Facing

such as:

Steel, iron, brick,

tile, concrete, slate,

glass, plasters.  

DO NOT cover any 

air openings in the face

of the fireplace.

Seal joint with non-combustible

sealant to prevent heat from being

drawn into the wall cavity.

Figure 7.13  Mantel Specifications

18 1/2 in. [470 mm]

19 3/4 in. [500 mm]

4 in.

[102 mm]

50° angle

39° angle

24 in.

[610 mm]

BRICK

FRONT

FLUSH

FRONT

24 in.

[610 mm]

22 3/8 in. [568 mm]

46 7/8 in. (1191 mm)

36 in.

[914 mm]

Note: Grid depicts 1 inch squares.

Figure 7.14  Mantel Leg, Surround or Wall Projection (acceptable 

on both sides of opening)

E. Sidewalls/Surrounds

•  Locate adjacent combustible sidewalls a minimum of 24 

in. (610 mm) from fireplace opening.

•  Mantle  leg,  surround,  stub  wall,  whether  combustible 

or non-combustible, may be constructed as shown in 

Figure 7.14.

WARNING! Risk of Fire! 

•  You must seal around the finishing material to fireplace.

Содержание ASH36

Страница 1: ...al for future reference ASH36 NOTICE DO NOT discard this manual DO NOT store or use gasoline or other flam mable vapors and liquids in the vicinity of this or any other appliance DO NOT overfire Overfiring will void your warranty Comply with all minimum clearances to com bustibles as specified Failure to comply may cause house fire WARNING If the information in these instructions is not followed e...

Страница 2: ... Outside Air Kit 15 4 Chimney and Termination Requirements A Chimney Requirements 16 B Offsets Returns 17 C Termination Requirements 18 5 Chimney Installation A Typical Chimney System 19 B Assemble Chimney Sections 20 C Install Chimney Air Kit 20 D Secure Offset Return 21 E Install Ceiling Firestops 21 F Install Attic Insulation Shield 22 G Roof Penetration 23 H Install Chase Chase Top 23 I Termin...

Страница 3: ...lled Location of Fireplace Installer Dealer Distributor Phone Serial Roof flashing installed Terminations installed Combustible materials not installed in non combustible areas Hearth extension installed per manual requirements Fireplace Setup Section 8 Pg 35 Hearth Home Technologies recommends the following Comments communicated to party responsible 4059 911 Rev A 4 9 18 Verified all clearances m...

Страница 4: ...ressed paper Plant fibers Plastic Plywood OSB Sheet rock drywall Any material that can ignite and burn flame proofed or not plastered or un plastered 1 Product Specific Important Safety Information A Fireplace Certification WARNING This product and the fuels used to operate this product wood and wood pellets and the products of com bustion of such fuels can expose you to chemicals including carbon...

Страница 5: ...er supports chimney not shown Termination cap Chimney penetrates roof preferably without affecting roof rafters Offset Return with hanger straps Framing headed off in ceiling joists Enclosed space above and around fireplace Mantel and surround Decorative facing and trim Hearth extension Factory built fireplace Protective metal hearth strip s Combustible framing header on top of V shaped standoffs ...

Страница 6: ...ion 3 NOTICE A minimum 1 1 2 in air clearance at the back and a minimum 1 1 2 in air clearance to the sides of the fireplace assembly must be maintained Chimney sections at any level require a 2 in minimum air space clearance between the framing and chimney sections B Design and Installation Considerations NOTICE Check building codes prior to installation Installation MUST comply with local region...

Страница 7: ...point of the roof Wind loading possible Multi level Roofs Windward Leeward Recommended Location Above peak Recommended Insulated exterior chase in cooler climates Recommended Location Above peak Inside heated space Location NOT recommended Too close to tree Below adjacent structure Lower roof line Avoid outside wall Marginal Location Wind loading possible Not recommended in basement due to high ne...

Страница 8: ...ve fireplace and components from packaging and inspect for damage Vent system components and doors are shipped in separate packages Report to your dealer any parts damaged in shipment Read all the instructions before starting the installation Follow these instructions carefully during the installation to ensure maximum safety and benefit E Fireplace System Requirements The Heatilator fireplace sys...

Страница 9: ...0 mm 5 in 129 mm 16 1 8 in 408 mm 6 7 8 in 175 mm 11 1 8 in 282 mm Gas Line Knockout 11 in 281 mm diameter 11 in 281 mm 27 1 2 in 699 mm 15 1 2 in 394 mm 31 1 8 in 790 mm 74 TYP 5 in 129 mm 16 1 8 in 408 mm 11 1 8 in 282 mm 6 7 8 in 175 mm 46 7 8 in 1191 mm 36 in 914 mm Gas Line Knockout Outside Air Outside Air 3 Framing and Clearances A Fireplace Dimensions Figure 3 1 Fireplace Dimensions ...

Страница 10: ...must comply with all minimum air space clearances to combustibles as specified in Figure 3 2 DO NOT pack required air spaces with insulation or other materials Framing or finishing material used on the front of or in front of the fireplace closer than the minimums listed must be constructed entirely of non combustible materials i e steel studs concrete board etc Failure to comply may cause fire Fi...

Страница 11: ...Ceiling Insulation Insulation Storm Collar Figure 3 3 Chase Assembly 1 2 3 All outside walls should be insulated Figure 3 4 Chase Constructions 1 Fireplace and chimney enclosed in an exterior chase 2 Chimney offset through exterior wall and enclosed in chase 3 Chase constructed on roof The chase is constructed using framing materials much the same as the walls in your home A variety of siding mate...

Страница 12: ...re 3 5 shows a typical framing using 2 x 4 lumber of the fireplace assuming combustible materials are used All required clearances to combustibles around the fire place must be adhered to See Figure 3 2 Any framing across the top of the fireplace must be above the level of the top standoffs No recess above standoffs The finished cavity depth must be no less than 28 1 2 in 673 mm from the finished ...

Страница 13: ... of the fireplace assembly E Secure and Level the Fireplace This fireplace may be placed on either a combustible or noncombustible continuous flat surface Slide the fireplace into position Be sure to provide the minimum 1 1 2 in air clearance at the sides and 1 1 2 in at the back of the fireplace The fireplace should be positioned so the face of the non combustible material on the fireplace will b...

Страница 14: ... mm under front edge of fireplace Overlap strips in the middle of fireplace opening by 1 in 25 mm minimum Metal strips must extend beyond the front and sides of the fireplace opening by at least 2 in 51 mm Figure 3 6 Protect the front of a platform elevated above the hearth extension with metal strips not included with fireplace per Figure 3 7 See Section 6 for hearth extension instructions WARNIN...

Страница 15: ... inlet hood to prevent blockage from leaves snow ice or other debris Blockages could cause combustion air starvation and unit to overheat Figure 3 8 Outside Air Inlet Locations Figure 3 9 Outside Air Installation Outside air is required to be installed on both sides right side not shown Outlet placed higher than 3 ft below the termination cap Attic space Garage or combustible liquids storage Outle...

Страница 16: ...lace or at any chimney joint A Chimney Requirements Vertical distances are measured from the base of the fireplace as shown in Figure 4 1 4 Chimney and Termination Requirements Table 4 2 Chimney Component Dimensions Table 4 1 Chimney Requirements Minimum overall straight height 18 ft 5 5 m Minimum height with offset return 18 5 ft 5 64 m Maximum height 90 ft 27 43 m Maximum chimney length between ...

Страница 17: ...set and return A B 1 1 4 in 32 mm OVERLAP Figure 4 2 Chimney Offset Return Example Your A dimension from Figure 4 2 is 14 1 2 in 368 mm Using Table 4 3 the dimension closest to but not less than 14 1 2 in 368 mm is 15 3 4 in 400 mm us ing a 30 offset return You determine from the table that you need 36 5 8 in 930 mm Dimension B between the offset and return The chimney components that best fits yo...

Страница 18: ... illustration above B Gas Termination Cap A Perpendicular Wall If using decorative cap cover s this distance may need to be increased Refer to the installation instructions supplied with the decorative cap cover In a staggered installation with both gas and wood terminations the wood termination cap must be higher than the gas termination cap Figure 4 3 Multiple Chimney Locations C Termination Req...

Страница 19: ...ions together firmly to resist movement Ceiling firestops are required where chimney passes through ceiling or floor Support straps for offsets not shown must be secured to adequate framing Termination Cap Storm Collar Offsets returns must be secured with screws outer pipe only Attic shield 5 Chimney Installation Figure 5 1 Typical Chimney System Guidelines for Chimney System Installation NOTICE C...

Страница 20: ...hanger straps provided fasten to studs or joists Vertical straight runs of chimney must be supported every 35 ft 10 7 m B Assemble Chimney Sections Use only those components described in this manual Substitute or damaged chimney components could impair safe operation and cause overheating and fire Attach either a straight chimney section or an offset to the top of the fireplace depending on your i...

Страница 21: ...op of framing Note Use same dimensional lumber for framing ceiling firestop and joists 2 in 51mm clearance 2 in 51mm clearance WARNING Risk of Fire DO NOT seal area between firestop opening and chimney pipe except where they en ter the attic or leave the warm air envelope of the home use 600 F sealant Figure 5 5 Installing the Ceiling Firestop When offsets and returns are joined to straight pipe s...

Страница 22: ...ff any opening around the bottom If you wish to make a custom shield or barrier follow these guidelines Metal is preferred although any material stiff enough to hold back the insulation can be used WARNING Risk of Fire Use of cardboard or other materials that can deflect under humidity or other envi ronmental conditions is not recommended The shield or barrier must be tall enough to extend above t...

Страница 23: ...the flashing plate and the roof to a minimum Caulk the flashing plate and roof junction as well as the vertical seam on the flashing All nail heads must be caulked with a roofing sealant Caulk the overlap seam of any exposed pipe sections that are located above the roof line to prevent leaks H Install Chase Chase Top You MUST use a chase top in a chase installation Chase tops may be field construc...

Страница 24: ...m Minimum Height Do NOT block air holes Caulk gaps between storm collar pipe and storm collar chase top Termination cap pipe and chimney section must be snapped together to maintain an overlap of 1 1 2 in 38 mm Slip storm collar around chimney pipe before termination cap pipe is snapped into the chimney pipe Figure 5 11 Installing a TR11 TR11 TV Round Termination Cap Storm Collar Chimney Pipe Chas...

Страница 25: ... mm 4 3 4 in 121 mm Figure 5 14 Installing a TCT1175 Terra Cotta Cap Storm Collar Chimney Pipe Chase Top Termination Cap not shown Chase Collar 2 in 51 mm Minimum Height Caulk gaps between storm collar pipe and storm collar chase top Do NOT block air holes 3 clip brackets Slip over chase collar and attach with screws provided Assemble storm collar around extended termination cap pipe once cap is i...

Страница 26: ...been tested for HHT fireplace systems and termination caps 3 in 76 mm minimum Min Base Dim Min Base Dim Min Top Dim Min Top Dim Min Opening Width Min Opening Width Radiation Shield 14 1 2 in 368 mm maximum height Figure 6 2 Open Top Shroud Dimensions TR11 11T TR11 11T TV Min Base Dims in 32 x 32 26 x 26 mm 813 x 813 660 x 660 Radiation Shield Required Radiation Shield Not Required Min Top Dims in ...

Страница 27: ...rmination Cap Chase Top Radiation Shield 3 in 76 mm Radiation Shield Height Termination Cap Figure 6 5 Roofed Style Shroud Dimensions 3 Roofed Style Shroud Radiation shield required 2 Mailbox Style Shroud Radiation shield required TR11 11T TR11 11T TV Min Base Dims in 34 x 34 mm 864 x 864 Min Height Above Bottom of Termination Cap in 23 mm 584 Min Opening Width in 28 mm 711 Min Opening Height in 1...

Страница 28: ...p and sides between the fireplace and drywall to prevent cold air leaks Only non combustible materials may be used to cover the metal fireplace front Metal strips are placed 2 in 51 mm under the front of the fireplace and must extend beyond the front and sides of fireplace opening by 2 in 51 mm Continuous non combustible sealant Floor constructed of wood or other combustible material 1 in Micore o...

Страница 29: ...in 914 x 965 mm to allow for door installation If Mortar is applied it should be applied after finishing material is installed Mortar will be applied between finishing materials and molded brick edges bottom and sides The seam between finishing materials and firebox top must be sealed with non combustible sealant The surface of the finished hearth extension and the surface of the hearth panel shou...

Страница 30: ...hearth extension insulated to a minimum R value of 2 06 The hearth extension material MUST be covered with tile stone or other non combustible material Manufactured hearth materials will usually have a published R value resistance to heat or k value conductivity of heat Refer to the formula in Table 6 1 to convert a k value to an R value Refer to Table 7 2 for hearth extension insulation alternati...

Страница 31: ...ve the bottom of the fireplace Finished hearth must NOT extend above this level Noncombustible Framing Material HX4 or equivalent Figure 7 7 Raised Platform Hearth Extension Framing Non combustible Finishing Materials Figure 7 8 Raised Platform Hearth Extension Finishing Figure 7 6 Raised Platform Hearth Extension Detail 1 Fireplace Installed Flush on the Floor and Hearth Extension Raised to Botto...

Страница 32: ...en the hearth extension and the front of the fireplace with a bead of non combustible sealant or grout Note The bottom of the fireplace opening is 3 3 4 in 95 3mm above the bottom of the fireplace Finished hearth must NOT extend above this level Bottom of fireplace opening Platform must be built to raise the bottom of the fireplace opening to the level of the desired hearth height Protective Metal...

Страница 33: ...stible Finishing Material Protective Metal Hearth Strip 20 in Min Hearth Extension 1 in Micore and 1 2 in Durock or equivalent insulation Finished Floor Note The bottom of the fireplace opening is 3 3 4 in 95 3mm above the bottom of the fireplace Finished hearth must NOT extend above this level Bottom of Fireplace Opening Figure 7 10 Flush Hearth Extension Side View C Non Combustible Sealant Mater...

Страница 34: ...n combustible Decorative Facing such as Steel iron brick tile concrete slate glass plasters DO NOT cover any air openings in the face of the fireplace Seal joint with non combustible sealant to prevent heat from being drawn into the wall cavity Figure 7 13 Mantel Specifications 18 1 2 in 470 mm 19 3 4 in 500 mm 4 in 102 mm 5 0 a n g l e 3 9 a n g l e 24 in 610 mm BRICK FRONT FLUSH FRONT 24 in 610 ...

Страница 35: ...nockouts in the inner firebox and in the outer shell on the side of your choice Refer to dimension drawings for location of knockouts and Section 7 I for gas provisions Install side panel tapered edge to the front Align the front edge with the front of the column or butted to the surround if installed Install two refractory clips in the mortar lines across the top Tighten these and all previously ...

Страница 36: ...Slip the last ring over the rod on the other side of the bracket Fasten the flat end of the screen rod back in place using the screw removed earlier Repeat for the other screen panel E Install Mortar Optional The brick panels have been designed for installation without the use of mortar being necessary If the look of mortar is preferred it is available and can be installed Follow the directions on...

Страница 37: ...t can be installed in this fireplace Vented Gas Logs Unvented Gas Logs CAUTION If an unvented gas appliance is installed in the fireplace the gas appliance must only be operated with the fireplace glass door fully open if included Only unvented gas log sets which have been found to comply with the standard for unvented room heaters ANSI Z211 11 2 are to be installed in this fireplace If an unvente...

Страница 38: ...30 Chimney Offset Return 30 deg FS538 Ceiling Firestop Straight FS540 Ceiling Firestop 30 deg AS10 Straight Attic Insulation Shield 24 in 610 mm JB577 Chimney Joint Band CB576 Chimney Bracket RF570 Roof Flashing Flat to 6 12 Pitch RF571 Roof Flashing 6 12 to 12 12 Pitch TR11 Round Termination Cap TR11T B Round Telescoping Termination Cap TCT1175 Terra Cotta Termination Cap ST1175 Square Terminatio...

Страница 39: ...0 mm JB577 Chimney Joint Band CB576 Chimney Bracket 13 in 330 mm 2 in 51 mm 13 in 330 mm A B 17 in 432 mm RF570 Roof Flashing RF571 Roof Flashing 39 7 8 in 1013 mm 28 in 711 mm 15 1 4in 387 mm 25 1 4 in 641 mm 29 in 737 mm 15 1 4 in 387 mm 21 in 533 mm Inside Diameter 11 in 279 mm Outside Diameter 13 in 330 mm Catalog A B FS538 0 deg 17 in 432 mm FS540 30 deg 26 in 660 mm ...

Страница 40: ...land ASH36 Installation Manual 4059 909 Rev D 04 19 40 TR11 Round Termination Cap TR11T Round Telescoping Termination Cap ST1175 Square Termination Cap TCT1175 Terra Cotta Cap 15 3 4 in 400 mm TR TVK CT11 A Adapter ...

Страница 41: ...ual 4059 909 Rev D 04 19 41 B A C B C A DTS134 DTS146 DTO134 DTO146 Decorative Caps DTO134 A B C in 34 20 24 mm 864 508 610 DTO146 in 46 22 7 26 mm 1168 576 660 DTS134 A B C in 34 21 18 24 mm 864 538 610 DTS146 in 46 21 18 26 mm 1168 538 660 ...

Страница 42: ... d 42 in 1067 mm 6 in 152 4 mm i d ID6 Insulated Duct 6 in 152 mm i d See your Majestic dealer for a complete list of optional components 16 in 406 mm 52 in 1321 mm 1 2 in 13 mm HX3 Hearth Extension A B C D LDS33 LDS46 Decorative Shroud E D A C B LDS BV Decorative Shroud Catalog A B C D in mm in mm in mm in mm LDS33 36 914 36 914 8 5 216 11 279 LDS46 48 1219 72 1829 8 5 216 11 279 Catalog A B C E ...

Страница 43: ...Majestic Ashland ASH36 Installation Manual 4059 909 Rev D 04 19 43 This page intentionally left blank ...

Страница 44: ...4 Majestic a brand of Hearth Home Technologies 7571 215th Street West Lakeville MN 55044 www majesticproducts com Please contact your Majestic dealer with any questions or concerns For the location of your nearest Majestic dealer please visit www majesticproducts com ...

Отзывы: