![Majestic 33BDVT Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/majestic/33bdvt/33bdvt_installation-instructions-and-homeowners-manual_3937594014.webp)
14
BDVT Series Direct Vent Gas Fireplace
10003358
STEP 6
Use appropriate length of pipe sections - telescopic or
fixed - and install the horizontal vent sections. The
sections which go through the wall are packaged with
the starter kit, and can be cut to suit if necessary. (Fig.
21)
Sealing vent pipe and firestop gaps with
high temperature sealant will restrict
cold air being drawn in around fireplace.
FP1242
Fig. 21 Through the wall.
STEP 2
Measure wall thickness and cut zero clearance sleeve
parts to proper length (MAXIMUM 12”/305 mm). As-
semble sleeve and attach to firestop with #8 sheet
metal screws (supplied). Install firestop assembly. (Fig.
18)
Zero clearance sleeve is only required
for combustible walls.
X
FP1240
Fig. 19 Vertical height requirement.
X
FP1241
Fig. 20 Horizontal length requirement.
Max. Length
12” (305mm)
#8 Screws (2)
#8 Screws
(2)
Adjustable Zero
Clearance
Sleeve
#8 Screws
(2)
Adjustable Zero Clearance Sleeve
ZCS101
Fig. 18 Adjustable zero clearance sleeve.
Firestop
STEP 3
Place fireplace into position. (Fig. 19) Measure the
vertical height (X) required from the base of the flue
collars to the center of the wall opening.
STEP 4
Apply a bead of high temperature sealant to the inner
and outer flue collars of the fireplace and using appro-
priate venting component(s) attach to fireplace with
three (3) screws. (Fig. 20) Follow with the installation
of the inner and outer elbow. Again secure joints with
three (3) sheet metal screws. Wipe off any excess high
temperature sealant.
STEP 5
Measure the horizontal length requirement including a
2” (51mm) overlap, ie from the elbow to the outside wall
face plus 2” (51mm) (or the distance required if install-
ing a second 90
°
elbow). (Fig. 20)
Always install horizontal venting on a
level plane.