background image

11

UVSRCA Vent-Free Fireboxes

20007435

UVSRC36A, UVSRC42A Unvented Fireboxes

2

3

1

4

5

6

7

8

10

9

11

7435

UVSRC36/42A

parts

8/04

12

7435

CFM Corporation reserves the right to make changes in design, materials, specifications, prices and discontinue colors and products at any time, 
without notice.

 

Description 

UVSRC36A 

UVSRC42A

 

1.  Firescreen Rod (2 per fireplace) 

76397 

76397

 

2.  Firescreen w/Rings (2 per fireplace) 

72301 

72301

 

3.  Screen Retainer (4 per fireplace) 

62222 

62222

 

4.  Back Brick 

77530 

76292

 

5.  Right Side Brick 

77528 

76276

 

6.  Left Side Brick 

77529 

76285

 

7.  Bottom Brick 

73500 

--

 

8.  Bottom Left Brick 

-- 

79013

 

9.  Bottom Middle Right/Left Brick 

-- 

79014

  10.  Bottom Right Brick 

-- 

79015

  11.  Cover, Hearth 

-- 

78988

  12.  Nailing Flange - Bag of 4 w/Screws 

2253160 

2253160 

Содержание FireStage UVSRC36A

Страница 1: ...s having jurisdiction i e building inspectors re marshals etc should be consulted before installation to determine the need to obtain a permit When installing the Blower Kit it is necessary to bring t...

Страница 2: ...lation 8 UVSRC36A Installation 8 UVSRC42A Installation 8 Install Optional Outside Air Kit 9 Replacement Parts 11 Accessories 12 Servicing 12 Warranty 15 Table of Contents UVSRC36A UVSRC42A Certi ed To...

Страница 3: ...8 S 46 53 C G K I F Gas Line Access Rough Opening Height Rough Opening Depth O J 79006 ADCH39 45C SPECS 2 04 S S R Q Rough Opening Width C N 1 2 B D A Fireplace Dimensions Fig 1a UVSRC36A and UVSRC42A...

Страница 4: ...n of 1 2 wallboard or plywood ush with the face of the replace Only the header Fig 1 may rest on the standoffs on top of the rebox When the replace is installed over carpeting vinyl tile or any combus...

Страница 5: ...to achieve a raised hearth effect This can be done by adding a small platform to achieve the desired height NOTE See pre wiring of Junction Box and Electrical Services on Page 7 Step 2 Install the Fir...

Страница 6: ...al lations The insulation and sealing of the enclosure around the replace is very important in cold climates If the en closure is insulated and sealed properly you can avoid future cold air problems T...

Страница 7: ...the rebox opening where facing materials such as brick or stone are used on the face of the rebox It acts as a support restop It should be attached to the face of the replace with screws and sealed t...

Страница 8: ...ck from the replace and carefully place it to the side to prevent damage Use a at blade screwdriver to gently lift up the front edge of the brick then pull forward to remove Step 4 Locate the blower a...

Страница 9: ...to duct termina tion This will provide the least restriction to air ow No more than four 4 90 elbows can be used Duct run may be horizontal vertical inclined or any combina tion of these Fig 12 You ar...

Страница 10: ...cap 7 6 00 djt Caulking Duct Ter mination Rain Cap Wall FP1061 Fig 15 Caulk and install duct termination rain cap in place Operating Precautions and Instructions Operation is automatic A slight negati...

Страница 11: ...at any time without notice Description UVSRC36A UVSRC42A 1 Firescreen Rod 2 per replace 76397 76397 2 Firescreen w Rings 2 per replace 72301 72301 3 Screen Retainer 4 per replace 62222 62222 4 Back Br...

Страница 12: ...sh contact CFM Corporation 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 Accessories Blower Kit BL 4 or FK12 Junction box is provided with replace Heat Reducing Canopy UC36 UVSRC36A UC42 UVSRC42...

Страница 13: ...13 UVSRCA Vent Free Fireboxes 20007435...

Страница 14: ...14 UVSRCA Vent Free Fireboxes 20007435...

Страница 15: ...inspection the damage is found to be the fault of the manufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of...

Страница 16: ...2695 Meadowvale Blvd Mississauga Ontario Canada L5N 8A3 800 668 5323 www cfmcorp com CFM Corporation...

Отзывы: