background image

 

 

Duct fans

 

 

ERK 100 
ERK 100 T 
ERK 100 S 
ERK 100 ST 

ERK 125 
ERK 125 T 

ERK 150 
ERK 160 
ERK 200 

 

 

 

 

 

 

 

 

 

 

 

Mounting and 

 

 

operating instructions 

 

 

 

 

w w w . m a i c o - v e n t i l a t o r e n . c o m  

 

VENTILATOREN

Содержание ERK 100

Страница 1: ...Duct fans ERK 100 ERK 100 T ERK 100 S ERK 100 ST ERK 125 ERK 125 T ERK 150 ERK 160 ERK 200 Mounting and operating instructions www m aico ventilatoren c om VENTILATOREN...

Страница 2: ...peed control with speed controller 9 8 4 Operation with step transformer 10 8 5 Commissioning 10 9 Maintenance 10 10 Fault rectification 10 11 Dismantling 12 12 Disposal 12 13 Wiring diagrams 12 Addit...

Страница 3: ...g fastening material 4 fastening screws and 4 dowels in the terminal box Mounting and operating instructions 2 General notes Read these installation and operating instructions carefully before using t...

Страница 4: ...50 DN 160 or DN 200 ERK 100 T ERK 125 T like ERK also with follow up relay timer adjustable from 3 to 15 minutes Units with nominal size of DN 100 or DN 125 ERK 100 S ERK 100 ST Duct fans with guide v...

Страница 5: ...e permitted for the duct The ERK fan must be permanently installed and the electrical supply cable permanently laid A mounting foot 5 should be used for installation The mounting location must demonst...

Страница 6: ...itionally a mains isolation device with contact openings of at least 3 mm at each pole must be installed Only operate the unit when it is completely installed Ensure that foreign bodies cannot be suck...

Страница 7: ...ly store fan horizontally in a suitable dry room ambient temperature 10 to 60 C Before installing check that the motor bearing is working properly Maico accepts no liability for corrosion damage cause...

Страница 8: ...ctly in the clamp grooves in order to prevent leakages 5 Fit suitable insulation sound deadening and installation material 8 2 Electrical connection DANGER Danger to life from electric shock Prior to...

Страница 9: ...T units set the unit overrun time with potentiometer 9 setting range 3 to 15 minutes 8 Fit optional on off switch 9 Connect other optional accessory components chapters 8 3 and 8 4 NOTICE Unit damage...

Страница 10: ...lt Repairs should only be carried out by a trained electrician DANGER Danger to life from electric shock Prior to accessing the connection terminals switch off all supply circuits Switch off the mains...

Страница 11: ...If the fault still continues or occurs again disconnect the fan from the power supply at all poles Let a certified electrician determine the cause of the fault and eliminate it i...

Страница 12: ...rning sign 1 Switch off mains fuse secure and fit warning sign 2 Remove folded spiral seam ducts from fan 3 Remove the terminal box cover 4 Remove all cables 5 Remove fan 12 Disposal Do not dispose of...

Страница 13: ...13 Wiring diagrams en 13 ERK 100 T ERK 100 ST ERK 125 T ERK 200...

Страница 14: ...de gb Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Germany Service 49 0 7720 694 447 technik maico de 07 14_Es 0185 1173 0000_RLF 4_07 14_DSW...

Отзывы: