Maico ER-AP Скачать руководство пользователя страница 14

9 Mounting preparations

14

 DANGER Danger to life due to fire trans-

mission if not flush with the brickwork or with
panel building materials.

If used outside the shaft, seal the gap remaining
between the connection duct and brickwork/wall
boards with non-flammable materials resistant to
deformation.
For example, use concrete or cement mortar for
brickwork or special fire protection filler for wall
boards.

Procedure

It is essential to observe the installation in-
structions: 
Mounting preparations [

}

 10]

.

1. Correctly attach main duct inside the shaft.

2. Apply ceiling compound. To do this, encase

the ceiling and pour in the material from
above.

3. Make shaft opening for the DN 80 steel folded

spiral-seams duct.

4. Fit duct attachments to the ceiling. Only use

permitted, suitable mounting material.

5. Connect DN 80 steel folded spiral-seams duct

to main duct and seal for ventilation, for ex-
ample with cold-shrink tape.

6. Apply brickwork compound. Seal gap between

brickwork and folded spiral-seams duct. The
gap remaining must be fully sealed with non-
flammable materials that are resistant to de-
formation. For example, use concrete or ce-
ment mortar or for wall boards, use fire protec-
tion filler.

7. Fasten duct bends with 3 steel screws or 3

steel blind rivets.

8. Make the DN 80 opening for the unit connec-

tion socket in the suspended ceiling (fire res-
istance is not required). It is essential to ob-
serve the permissible installation positions:
Permissible installation positions for AP and
APB fans.

9. Attach the suspended ceiling and provide a

suitable, level substructure.

It is imperative to compensate any uneven-
ness in the wall or ceiling so that the lower
part of the housing can be installed without
warping. Otherwise it may be that the fan
insert can no longer be inserted into the
lower part of the housing or that the de-
gree of protection indicated on the rating
plate is no longer guaranteed.

10.Attach spigot made from shaft material F90

around the shaft.

The spigot compensates for the length of
the shaft walls in the event of a fire.

11.Continue with the safety-related test of the

shut-off device: 

ER-APB: Safety instructions for

installation of the fire protection shut-off
device [

}

 7]

.

9.4 Preparations for wall, shaft or
ceiling installation without fire pro-
tection

1. Carry out installation preparations as de-

scribed: 

Requirements in line with approval

[

}

 11]

. However, comply with the specifications

suitable for the exhaust air system in accord-
ance with the applicable fire protection regula-
tions.

2. Permissible connection ducts for connection

without fire protection requirements:

• Shaft/wall installation: Flexible aluminium duct

with DN 80 connection diameter, max. 2 m
long, two 90° elbows.

• Ceiling installation (connection outside of the

shaft): Steel folded spiral-seams duct and/or
flexible aluminium duct with DN 80 connection
diameter, max. 2 m long, two 90° elbows.

3. Use suitable mounting material for installation

without fire protection.

9.5 Preparations for the electrical
connection

 DANGER Danger to life from electric

shock.

Before laying the power cable, switch off all sup-
ply circuits. Switch off mains fuse, secure against
being accidentally switched back on and position
a visible warning sign.

Always note the relevant specifications for
electrical installations and when fitting
equipment. In Germany, observe DIN VDE
0100 and the corresponding parts in partic-
ular.

1. Lay power cable to the installation location.

Содержание ER-AP

Страница 1: ...Installation and operating instructions Surface mounted exhaust air system for single duct air ex traction according to DIN 18017 3 ER AP ER APB www maico ventilatoren com...

Страница 2: ...ents in line with approval 11 9 1 1 Approval provisions 11 9 2 Permitted installation positions 11 9 3 ER APB Preparations for installa tion with fire protection require ments 12 9 3 1 Preparations fo...

Страница 3: ...3 Preface Please read the instructions carefully before in stalling and using for the first time Follow the in structions Pass these instructions on to the owner for safekeeping Overview of ER AP APB...

Страница 4: ...the necessary knowledge and experience in ventilation engineering The unit must be connected in accordance with the national technical approval Only a qualified electrician is permitted to work on the...

Страница 5: ...may contaminate the unit and air ducts and reduce ef ficiency Never use unit to convey these substances NOTICE Damage to the unit when continu ously conveying steam saturated air Never use unit to con...

Страница 6: ...M GLOBAL RML or ceiling barrier system Ensure that the gap remaining between the main duct and wall or ceiling is fully sealed with non flam mable materials resistant to deformation such as concrete c...

Страница 7: ...at a point which is not permitted CAUTION Risk to health if unit is not cor rectly cleaned Clean the unit regularly at least every 2 years This is the only way of ensuring that the unit is running hyg...

Страница 8: ...p ventilation ducts connected to the unit with a suitable adhesive tape to protect against corrosion inside the brickwork e g using cold shrink tape NOTICE Odours may escape from the ventila tion chan...

Страница 9: ...l lable Mains cable mm ER AP 60 ER APB 60 Standard 9 1 no 3 x 1 5 ER AP 100 ER APB 10 Standard 9 1 yes 3 x 1 5 ER AP 60 VZ ER APB 60 VZ ER AP 100 VZ ER APB 100 VZ VZ circuit board 9 5 50 6 no 5 x 1 5...

Страница 10: ...that virtually no air can flow into the living areas from the kitchen bathroom or WC A room from which the air is to be extracted must be fitted with a non closable free supply air cross section of a...

Страница 11: ...ain duct in the shaft and the unit max 2 m long approval Steel folded spiral seams duct or flex ible alu minium duct between the main duct in the shaft and the unit max 2 m long approval Duct elbows i...

Страница 12: ...ential that the remaining gap between the main duct and the wall or ceiling is completely sealed with non flammable materials that are res istant to deformation For example use concrete or cement mort...

Страница 13: ...een the duct fastenings It is essential to observe the installation instructions Mounting prepara tions 10 Duct attachment with duct clamp alternatively duct attachment with clamping band Danger due t...

Страница 14: ...in the wall or ceiling so that the lower part of the housing can be installed without warping Otherwise it may be that the fan insert can no longer be inserted into the lower part of the housing or t...

Страница 15: ...r an air extraction system without fire protection 10 Housing installation 10 1 Wall installation lower part of housing 6 Lower part of housing 7 Cable grommet 10 Metal connection socket with ER APB s...

Страница 16: ...d cable grommet 6 Pierce a round opening in the cable grommet with a grommet puncher 7 Guide the power cable into the terminal com partment such that the cable grommet fits around the cable sheathing...

Страница 17: ...le 33 Fixing screw to be provided by the customer 34 Housing seal DANGER Risk of incorrect installation if non permitted mounting material is used Only secure connection duct to ceiling with per mitte...

Страница 18: ...ning sign DANGER Danger from electric shock The unit will be damaged if installed incorrectly with too long a power cable If the cable feed is too long inside the housing the fan insert cannot be inst...

Страница 19: ...alled the shut off shutter backflow preventer must close automatically For ER APB this must close automatically when the yoke spring used is pressed NOTICE Degree of protection not guaranteed if housi...

Страница 20: ...e indicator value 6 11 Fit cover MAICO name on bottom right The cover must audibly click into place 13 Commissioning 1 Switch on mains fuse and remove warning sign 2 Run function test To do this switc...

Страница 21: ...nents with dry cloth only 2 If the cover or upper part of the housing is very dirty clean with water Filter change Filter change interval every 3 to 6 months depending on the degree of soiling 1 Remov...

Страница 22: ...se load to full load operation despite there being hu midity in the room No rapid increase in hu midity 7 in 2 minutes took place H model no longer switches back to base load operation or off even aft...

Страница 23: ...ektroapparate Fabrik GmbH Steinbeisstra e 20 78056 Villingen Schwenningen Deutschland Tel 49 7720 694 445 Fax 49 7720 694 175 E mail ersatzteilservice maico de Spare parts can be ordered at www shop m...

Страница 24: ...spose of the unit in an environmentally friendly way in compliance with the regulations valid in the country where you are 20 Wiring diagrams 20 1 Wiring diagrams ER AP APB ER AP 60 ER APB 60 ER AP 10...

Страница 25: ...g The F fan is designed for installation in window less dark rooms The unit is switched on wire lessly through the brightness of the room lighting by a light control unit The unit starts up after ap p...

Страница 26: ...ut again If the humidity falls below the saved reference value the overrun operation starts with an over run time of 15 minutes nominal load If the hu midity does not fall below the reference value wi...

Страница 27: ...manually be switched to full load operation Switching off After switching full load operation off with S1 the unit continues in full load operation for an overrun time of 6 minutes If after this time...

Страница 28: ...ues to run in full load operation until the humidity drops below the reference value After the 15 minutes of overrun time the fan switches back to base load operation is lower than the saved reference...

Страница 29: ...29 If the room lighting is switched off with switch S2 the unit switches back into the base load level Switching off The unit can be switched off completely with switch S1 It doesn t matter what posit...

Страница 30: ......

Страница 31: ......

Страница 32: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D09 20_EN_DSW AS AV...

Отзывы: