background image

34

 

 

BA550401-en 

 

 

10

 

Contents of the Declaration of Conformity 

 

MAHA Maschinenbau Haldenwang GmbH & Co. KG 

herewith declares as a manufacturer its sole responsibility to ensure that the product 
named hereafter meets the safety and health regulations both in design and 
construction required by the EC directives stated below. 
This declaration becomes void if any change is made to the product that was not 
discussed and approved by named company beforehand. 

 

 

 

Model:

 

MGH 5.5/75 
MGH 5.5/45 
MGH 5.5 PD 
MGH 11.0/75 
MGH 11.0/45 
MGH 14.5/75 
MGH 14.5/45 
MGH 14.5 PD 
MGH 16.5/75 
MGH 20.0/75 
MGH 30.0/75 

H 5/750 
H 5/450 
 
H 11/750 
H 11/450 
H 14/750 
H 14/450 
 
H 16/750 
H 20/750 
 

 

Designation:

 

Pit Jack;  
Rated Load Capacity 5.5 / 11 / 14.5 / 16.5 / 20 / 30 t 

Directives:

 

2006/42/EC 

Standards:

  

DIN EN 1494 

 

Содержание MGH 11.0/45

Страница 1: ...um Name dem Text zuzuweisen der hier angezeigt werden soll Fehler Verwenden Sie die Registerkarte Start um Name dem Text zuzuweisen der hier angezeigt werden soll MGH Pit Jack Original Operating Instr...

Страница 2: ...he event of the grant of a patent utility model or design The contents of this edition have been checked with great care However errors cannot be fully excluded Subject to technical change without not...

Страница 3: ...Design and Operating Principle 10 2 2 Compressed Air Supply 10 2 3 Specifications 10 2 4 Sample Nameplate 11 3 Transport and Storage 11 4 Installation and Initial Operation 11 4 1 Assembly of the Car...

Страница 4: ...4 BA550401 en 10 Contents of the Declaration of Conformity 34...

Страница 5: ...1 Personal Injury DANGER indicates an immediate hazard which if not avoided will result in death or severe per sonal injury WARNING indicates a potential hazard which if not avoided could result in d...

Страница 6: ...modified without the express written consent of the manu facturer In case of non compliance the declaration of conformity becomes void 1 3 Inappropriate Use WARNING Use in any manner other than that i...

Страница 7: ...under the load must be carried out by trained personnel The vehicle or vehicle components may only be raised using the designated points Shortly after lifting the vehicle check the lifting points are...

Страница 8: ...there are no objects in the area where the pit jack and the load are moving Do not deliberately swing the lifting equipment Because the carriage on the ground is not secured to prevent tipping placing...

Страница 9: ...g and lowering itself on its own or distor tion of the supporting components immediately lower the lift or provide support In case of malfunction or repair disconnect the pit jack from the air supply...

Страница 10: ...s other adaptors from our range of accessories can be attached In hydraulic pneumatic pit jacks with rapid lift control the oil in the tank is pressurised with compressed air The oil is thus displaced...

Страница 11: ...suspended or loaded properly so that they cannot fall taking into account size weight and the cen tre of gravity Store the packages in a covered area protected from direct sunlight at a low humidity a...

Страница 12: ...Assembly of the Carriage Version up to 16 5 t Required Aids and Tools suitable hoist indoor crane forklift truck etc 2 round slings 2 lashing straps 1 ratchet with nut 1 torque wrench wooden board As...

Страница 13: ...401 en 1 Attach the pit jack with a round sling to the front lift rollers 2 Lift the pit jack from the pallet with the hoist and place it on level ground Then remove the round sling Caution Danger of...

Страница 14: ...14 BA550401 en 3 Remove the transport lock and install the compressed air line...

Страница 15: ...BA550401 en 4 Remove and store all four M12 screws in the chassis Then attach a side piece with a round sling pull it out with a crane and place it next to the lift Repeat process with second side pan...

Страница 16: ...ers Caution Danger of tip ping and secure with lashing straps At least one second person must be called in to support the assembly work and if necessary other persons must also be called in Make sure...

Страница 17: ...it laterally with the square spigots into the chassis carriers as far as it will go At least one second per son must be called in to support the assembly work and if necessary other per sons must also...

Страница 18: ...t load symmetrically on the lift i e the centre of gravity not the centre should be aligned centrally above the lift Attention Danger of tipping At least one second person must be called in to support...

Страница 19: ...anel After inserting the second side panel repo sition the chassis centrally on the lift At least one second person must be called in to support the assembly work and if necessary other persons must a...

Страница 20: ...t slipping Two lashing straps are recommended which are guided through the handle openings in the carriers and enclose the lift in opposite directions At least one second per son must be called in to...

Страница 21: ...the hoist diagonally to two jack rollers with a round sling Then lift the jack incl chassis by crane and lower it centrally into the pit The side panels must be pushed in as far as they will go as de...

Страница 22: ...jack in the L profile or in the U profile depending on the installation situation If necessary the chassis can be tilted for this purpose if the securing described in step 9 has been carried out corr...

Страница 23: ...pull out the side panel until the collars of the chassis rollers are in contact with the pit profile Repeat the process with the second side panel Make sure that both side pa nels are extended to the...

Страница 24: ...slings and push the jack through the entire working pit At the widest point of the working pit the clearance between the roller collar and the pit profile may be 5 mm on both sides Then remove the las...

Страница 25: ...re described in section Assembly of the Carriage Version up to 16 5 t The same aids and tools are needed Deviating from this the following assembly steps must be performed 1 Insert the lift into the c...

Страница 26: ...in contact with the carriage Now observe the procedure for securing the jack described in step 9 in section Assembly of the Carriage Version up to 16 5 t Since the carriages above a load capacity of 2...

Страница 27: ...ration 5 1 Controls A Release spindle B Rapid lift control automatic via remote control C Rapid lift control hand operated D Load lift control automatic via remote control E Load lift control hand ope...

Страница 28: ...ring under load When lowering under load the lowering valve may only be opened slowly by turning the release spindle A to the left in order to achieve a controlled descent Lowering without load Open t...

Страница 29: ...e of the operating instructions of all equipment and tools used Check lifting accessories carefully for operational safety Pre position the lift and lifting accessory at the lift points Always take up...

Страница 30: ...only by authorized and trained service technicians provided by the manufacturer licensed dealers or service partners In case of non compliance the manufacturer s warranty becomes void 6 2 Care Instru...

Страница 31: ...ly ensur ing there is a soft transition at the edges Detergent and salt water can freely pene trate and cause considerable damage on the inside Water is dangerous A compressed air service unit consist...

Страница 32: ...the hydraulic fluid periodically depending on aging soiling and water ab sorption but after six years at the latest When topping up use fluid with the same specification only If the system was factor...

Страница 33: ...y by specially authorized and trained personnel provided by the manufacturer licensed dealers or service partners 9 Disposal If you want to dispose of the equipment please contact your MAHA dealer or...

Страница 34: ...d by the EC directives stated below This declaration becomes void if any change is made to the product that was not discussed and approved by named company beforehand Model MGH 5 5 75 MGH 5 5 45 MGH 5...

Отзывы: