background image

Section

1

Warranty

1.0  Warranty

All Magtech products are warranted against defects 

in materials and workmanship for a period of no 

less than one year from the date of shipment.  The 

level gage chamber and process connections are 

guaranteed for the life of the tank or vessel to 

which it is attached.  Floats are guaranteed for two 

years.  

Magtech will repair or replace at its 

discretion those products that fail to perform as 

specified

, with the following exceptions:

1. Products repaired or modified by persons 

that are not authorized by Magtech.

2. Products subjected to misuse, negligence or 

accidents.

3. Products that are connected, installed, or 

otherwise used in such a way not in strict 

accordance with manufacturer’s 

instructions.

This warranty is in lieu of any other warranty 

expressed or implied by any party other than 

Magtech.  Repairs and/or replacements shall be at 

the sole discretion of Magtech based on the terms 

and conditions of this warranty.  Defective products 

shall be returned to the factory prepaid by the 

buyer after obtaining a Return Authorization 

Number from Magtech.  All warranty repairs or 

replacements will be performed at the factory in 

Pearland, Texas.  Surface return freight will be paid 

by Magtech.  Factory warranties do not include field 

service.  Field service warranty repairs will be at the 

buyer’s expense.  Consult Magtech for field service 

rates.

Any modifications to terms and condition of this 

warranty will not be binding unless made in writing 

and signed by an authorized agent or official of 

Magtech.

All Magtech gages and transmitters should 

be unpacked and thoroughly inspected upon 

receipt.  Gages are shipped FOB factory and 

are fully protected against damage or loss 

during shipment.  Any claims for parts 

damaged during shipment should be 

submitted within 15 days of receipt of goods 

by customer.

We value your opinion and want to better 

serve you.  Please go our website: 

www.isemagtech.com

and click the customer 

feedback survey option (on the left side of the 

screen).  Some of the best suggestions for 

improvement come from our valued 

customers.  Let us know how we are doing and 

what we can do better to improve your 

satisfaction with our product and service.

1

Содержание LTM-250

Страница 1: ...as 77584 Phone 281 488 0788 Fax 281 488 7080 E mail magtech isemagtech com Website www isemagtech com LTM Series Models LTM 250 and LTM 350 Magnetostrictive Level Transmitters Instructions Operation M...

Страница 2: ...on 7 4 0 Gage Mount Installation 7 4 1 Standalone Installation 7 4 2 General Installation Guidelines 7 4 3 Insulation against extreme heat cold 10 Section 5 Field Wiring 11 5 0 Recommended Loop Wiring...

Страница 3: ...8 2 Power Supply Troubleshooting 29 8 3 General Troubleshooting 29 Section 9 LTM 350 has HART Protocol 30 9 0 HART Protocol General Information Flowchart of HART Menus 30 Icon Key Warning Caution Val...

Страница 4: ...factory prepaid by the buyer after obtaining a Return Authorization Number from Magtech All warranty repairs or replacements will be performed at the factory in Pearland Texas Surface return freight...

Страница 5: ...raceability BBBB The overall probe length of the instrument Note THIS IS NOT THE MEASURING RANGE XXXX The measuring range of the instrument The 0 and 100 4 20mA output range YYYY The end user specifie...

Страница 6: ...evel gages Full warranties will apply upon factory approval Float and or Indicator replacement may be required 2 4 Standalone Transmitter When a magnetic level gage is not present the LTM can be inser...

Страница 7: ...TM 350 but NOT the LTM 250 are 1 HART Protocol which enables a A second digital output proportional to an interface level requires a second float of different specific gravity b A digital temperature...

Страница 8: ...try This principle if designed and applied properly has potentially very high measurement resolution typically better than 0 001 inch In the machine tool industry such a high resolution is desirable I...

Страница 9: ...noise Even signals received during the active window are evaluated and filtered so that only high integrity data is accepted The conditioned signal is converted to a percent of full scale number and a...

Страница 10: ...cription of the transmitter features Optional configurations are available upon request 2 mnpt flanges etc The magnetic float used in the stand alone unit is designed to travel up the sensor tube with...

Страница 11: ...and bottom process connection Mount the transmitter along the level gage and use a nut driver to tighten the clamps so the sensor probe of the transmitter is held securely will not slip up and down Ke...

Страница 12: ...d bow or cause a kink in the sensor probe this will damage the instrument and void the warranty Do not attempt to straighten the sensor probe this will not help the instrument work If the shipment arr...

Страница 13: ...be as this may burn up the sensor and possibly the electronics 2 After the insulation jacket is installed the LTM sensor tube must be remounted at its factory preset distance from the mag gage chamber...

Страница 14: ...Section 5 Field Wiring 5 0 Recommended Loop Wiring The following is the recommended loop wiring Figure 13 Recommended Loop Wiring 11...

Страница 15: ...The following is the Hart Topology Figure 14 HART Loop Topology Please visit www hartcomm2 org to learn more about HART Protocol 12...

Страница 16: ...en exp conduit must be sealed within 18 inches of the termination point at the instrument Power must be supplied by an isolated supply Caution To reduce the risk of ignition of hazardous atmospheres d...

Страница 17: ...Vdc 13V 20mA Repeatability 005 of full scale or 010 whichever is greater Non Linearity 01 of full scale or 030 whichever is greater Sensor Accuracy 01 of full scale or 030 whichever is greater Damping...

Страница 18: ...change Yes to No and No to Yes This is the enter button used to execute functions and enter exit into or out of submenus The pushbuttons are timed not pressurized It does not matter how hard firm you...

Страница 19: ...ace when option is provided in selected engineering units LTM 350 only 3 Temperature when option is provided in selected engineering units LTM 350 only 4 The analog current corresponding to level in m...

Страница 20: ...el Interface Sel Alrm FailHigh FailLow HoldOut ChgRnge Sel LRV Sel URV Yes No yes 0 00 in 24 00 in SelDamp 1 sec ROC Fltr 10 0in s TrmSnsr TrimZero TrimZero TrimSpan TrimSpan Span Yes No yes Busy 24 0...

Страница 21: ...t Length Note THIS IS NOT THE MEASURING RANGE This parameter should only reflect the overall sensor length It can be adjusted by incrementing and decrementing the value and then pressing enter Level U...

Страница 22: ...changed from 0 00in to 3 00in the 4 00mA point will shift 3 00 inches higher than the original point It is recommended to leave this at 0 00 most of the time unless a special circumstance arises Press...

Страница 23: ...er There is no need to recalibrate the instrument simply use the Change Range menu and change the LRV and URV as desired If the need arises to use this menu then level simulation will be required at 0...

Страница 24: ...nt meter should be used to monitor the 4 20mA when this function is selected Test Loop This function allows for direct control of the Transmitter s current output mA capability Simply enter into this...

Страница 25: ...mporary spontaneous noise that may be present in field For example if the level in a tank cannot rise or fall faster than 30 0 in s then the setting for the RoC filter should be set to 15 0 in s or le...

Страница 26: ...t Default Select Defaults Yes No yes Load Save Load Factory Sensor1 Sensor2 Sensor 3 Loaded Select Defaults Save Sensor1 Sensor2 Sensor3 Saved v Deadzone 1 50in v 1pt Cal SelLngth Sel LRV Sel URV Ener...

Страница 27: ...sired Loading Factory Defaults Enter into the Defaults menu by changing the no to a yes Then the option to Load will appear Press enter and the Factory option will appear then press enter on more time...

Страница 28: ...t the factory for guidance with this parameter 6 The DCOffset menu is the signal to noise ration Please contact the factory for guidance with this parameter 7 The HoldTime menu is the amount of time t...

Страница 29: ...onfiguration menu that is utilized to achieve this task To access this menu press and hold the increment button then while holding the increment button press and hold the enter button for 3 seconds 5...

Страница 30: ...can be loaded if the parameters have been drastically changed Pulse Width Filter PW Filtr The pulse width filter can be utilized for dual output level and interface applications if there are any erron...

Страница 31: ...Range menu and adjust the LRV or URV as desired 8 1 Troubleshooting Magtech manufactures custom built products so each transmitter has been specifically designed to fit on a magnetic level gage or be...

Страница 32: ...ts terminal without affecting the analog current output The most common supply voltage used is 24Vdc At times additional resistance in the loop is necessary either in the form of a second load resisto...

Страница 33: ...or a HART enabled host system HART Menu Flowchart for LTM350 Transmitter Device Setup Process Variables Level PV Value Note 1 Interface Note 2 Loop Current Temper Note 3 LRV Range URV Loop Current Di...

Страница 34: ...its Note 3 Damping Detailed Setup Device Profiles Factory Slot Load User 1 Slot Load Save User 2 Slot Load Save User 3 Slot Load Save Signal Setup Energy DC Offset Hold Time Digital Level Alarms Alarm...

Страница 35: ...Long Tag Message Descriptor Revision s Universal rev Fld dev rev Final asmbly num Note 1 When Interf is PV Interf is displayed Software rev Note 2 Only applies when interface float is included Hardwa...

Отзывы: