45
mWing
Installation and assembly
7.7.2
Mounting variant "Mount base plate"
With this type of installation, first mount the base plate on the foundation or
on the unfinished floor. After completion of the finished floor, install the pe-
destrian gate on the finished floor using threaded rods.
Required material (not enclosed):
›
Base plate FURA100
›
Attachment set FURA100 for mounting the pedestrian gate
›
The mounting material for the base plate must be provided by the custom-
er.
Install and prepare the base plate before finishing the finished floor
Prerequisites
›
The foundation / raw floor was erected.
›
The empty conduits were laid.
›
The foundation / unfinished floor has hardened.
ä
Base plate and drilling template: Page 41, Fig. 14.
1. Mount the base plate on the foundation or unfinished floor.
NOTICE
Wrong orientation of the pedestrian gate! The pedestrian gate is not sym-
metrically constructed. Align the pedestrian gate so that the passage side
is on the correct side. Note figure base plate.
2. Screw the threaded rods into the base plate.
NOTICE
Incorrect positioning of the threaded rods! Note figure base plate.
3. Fix threaded rods with nuts.
4. Mount the other nuts slightly above the planned finished floor height on
the threaded rods.
5. Place the drilling template on the threaded rods.
Содержание MHTM FlowMotion mWing
Страница 6: ...6 mWing...
Страница 74: ...74 mWing...
Страница 77: ...77 mWing...
Страница 78: ...78 mWing...
Страница 79: ...79 mWing...