
Installation
Transport System Installation
26
MagneMotion
Rockwell Automation Publication MMI-UM002E-EN-P - March 2016
5.
Align the curve to curve motor joints ensuring the top surface of the motors are flush
with one another and the motors are coplanar. Tighten the two M6 x 10 mm screws on
each V-brace at that motor joint to 3.4 N-m [30 in-lb] using a T30 Torx bit.
6.
Tighten the M6 bolt securing the motor to the motor mount to 5.5 N-m [49 in-lb] using
a 10 mm Hex socket.
NOTE:
The Loctite must cure for 2 hours at 22° C [72° F] before using the transport
system.
7.
Repeat
at all straight motor to straight motor joints.
8.
Repeat
at all curve motor to straight motor joints.
9.
Repeat
at all curve motor to curve motor joints.
10.
Repeat
at all motors.
Verify Motor and Switch Installation
Once all motors and switches are installed the guideway must be checked to ensure proper
movement of the vehicles (pucks) throughout the transport system. Run a vehicle (puck)
through the system to verify proper movement with no binding.
Содержание MagneMover LITE
Страница 1: ...MagneMover LITE User Manual ...
Страница 284: ...Operation 28 MagneMotion Rockwell Automation Publication MMI UM002E EN P March 2016 This page intentionally left blank ...
Страница 381: ...MagneMover LITE User Manual 501 Rockwell Automation Publication MMI UM002E EN P March 2016 Notes ...