2-1-1
N2466FTMEN
STANDARD MAINTENANCE
Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Notes:
1. Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head)
using 90% ethyl alcohol.
2. After cleaning the parts, do all DECK ADJUSTMENTS.
3. For the reference numbers listed above, refer to Deck Exploded Views.
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 h
2,000 h
3,000 h
4,000 h
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B587
Tension Lever Assembly
I
I
B31
ACE Head Assembly
I
B573, B574
Reel (SP)(D2), Reel (TU)(D2)
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
B73
FE Head
I
B133, B134
Idler Gear, Idler Arm
I
I
B410
Pinch Arm (A) Assembly
I
I
B414
M Brake (SP) Assembly
I
I
B416
M Brake (TU) Assembly
I
I
B525
LDG Belt
I
I
B593
Cam Holder Assembly
I
I
Содержание 20MC4304/17
Страница 13: ...1 5 1 T1102IB OPERATING CONTROLS AND FUNCTIONS ...
Страница 14: ...1 5 2 T1102IB ...
Страница 15: ...1 5 3 T1102IB ...
Страница 16: ...1 5 4 T1102IB ...
Страница 68: ...R2583 H f0 Adjustment B TP2501 J2550 GND Sub CBA Top View TV VCR Section BT1100F01022 A 1 11 25 ...
Страница 93: ...1 18 2 T1102PEX FRONT S4 S4 S1 X1 Tape X9 S4 X4 X2 1 X25 X3 S3 S6 S7 S2 Packing Tape X2 1 Packing ...
Страница 112: ...2 4 9 N2466FTDA 43 41 42 L 13 Fig DM16 44 45 Slide P 9 Fig DM17 ...