Magnaflux A-2030 Series Скачать руководство пользователя страница 2

A-2030 Series

 

© 2015 Magnaflux 

Page 2 

Magnaflux-SRVC-IG001 

Issued: Apr 2015 

Rev. 2 

1.  A minimum of two feet is required at both ends and the rear of the inspection unit to ensure 

adequate space for servicing (removing machine panels and accessing the circulating 
pump) and ventilation. 

2.  A firm, reasonably level floor capable of supporting the inspection unit and the materials 

awaiting inspection.  

3.  Adequate space to accommodate a black light inspection canopy (Optional), material stor-

age, material movement and access to the materials. 

4.  A power source of the proper voltage, frequency and phase (as designated on the 

Mag-

naflux Data Plate

 located on headstock end of inspection unit) capable of providing current 

per the nameplate. Connect the incoming power to the Incoming Power Connection located 
inside the unit on the back side. Attach the Chassis Ground wire to the inside of the unit to 
the Chassis Ground Connection Screw. Follow all local electrical codes for wiring. It is high-
ly recommended that an electrical fused disconnect be installed on the headstock side of 
the unit—Either on the wall behind the unit or on a pedestal near the unit. See page 3 for 
correct fuse sizes.  

Operating Manual and 

Drawings  

The manual is shipped with the unit in electronic format wrapped 
in a green bubble wrap mailer within the Accessories Box. In the 
manual is an extensive step by step process of how to assemble 
the enclosure and attach it to the unit.  

Getting Started 

Air Pressure 

Regulator 

Front of Unit: 

Back of Unit: 

120VAC receptacle 

for pump 

Incoming Power 

Connection 

Chassis Ground 

Connection 

Incoming Air Connection 

1/8” NPT Thread 

Set-Up 

continued on Page 3... 

Отзывы: