7
1. Drill holes on the door
2. Install the latch (E)
door thickness
35~75 mm
F
center line of the
handle
desired handle
height
Note 1: Align the template along the vertical
center line of the latch (E) at the desired
handle height, and tape it to door.
Note 2: Mark the holes first, then start drilling.
Installation
F
E
Содержание L7000
Страница 1: ...Installation Instruction L7000 Version 1 0 Date Mar 2015...
Страница 2: ...1 B Diagram C A D C N I K J E M F G H L Before Installation...
Страница 3: ...2 Packing List B K C I G H 10 mm E A L 70 mm D 20 mm 30 mm 45 mm F J...
Страница 12: ......