Start-Up

For Your Safety, Read Before Lighting

If  you  do  not  follow  these  instructions  exactly,  a  fire 

or explosion may result causing property damage, 

personal injury, or loss of life.

 WARNING

This furnace is equipped with a direct ignition control. 

Do not attempt to manually light the burners.

 CAUTION

To Light Burners

1. 

Turn off electrical power to unit.

2.  Turn the thermostat to lowest setting.
3.  Move the gas valve switch to the “ON” position (see 

Figure 8).

4.  Turn on electrical power to the unit.
5.  Set the room thermostat to the desired temperature.  

If the thermostat “set” temperature is above room 

temperature after the pre-purge time expires, burners 

will light.

Figure 8. 

Gas Valve

Gas Inlet

Gas Inlet

Pressure

Test Tap

ON / OFF

Switch

Gas Manifold

Pressure

Test Tap

Regulator

Adjustment

Screw

(Under Cap)

Operation

Operation of the unit is automatic and will provide heating 

and cooling depending on the setting of the thermostat.

Heating

1.  Turn on main power supply.
2. 

Open manual gas shutoff valve.

3.  Set thermostat system to “HEAT”.
4.  Set thermostat to temperature desired.

Sequence of Operation

1.  Thermostat calls for heat.
2. 

Combustion blower starts and proper air flow is proven 

by the pressure switch closing.

3.  Blower continues to operate for 30 seconds prior to 

the burners lighting.

4.  Ignition control begins spark and opens gas valve. The 

burners are lit. Ignition is proved through flame sensor.

5.  Circulating air blower starts 30 seconds after the 

burners light.

6. 

When  the  thermostat  is  satisfied,  the  burners  and 

combustion blower shut off.

7. 

Circulating air blower will shut off 120 seconds later.

If the burners should fail to ignite, the ignition control will 

try to ignite the burners a total of three times. Should the 

burners fail to ignite within the three trials for ignition, the 

ignition control will lock out for 1 hour before beginning 

another ignition cycle. To reset the control, turn the 

thermostat  down  or  off  for  10  seconds  and  then  set  to 

desired setting. At this time, the ignition sequence will try 

again.

Cooling

1.  Set thermostat system switch to “COOL.”
2.  Set thermostat to temperature desired.

NOTE

: When Y is energized, the combustion blower will 

operate for 10 seconds. The purpose of this action is to 

deter insect nesting in the flue pipe.

To Shut Down Unit

For temporary or short periods of shutdown, set the 

thermostat system switch to “OFF”. For a prolonged period 

of shutdown, set the thermostat system switch to “OFF” 

and turn off the electrical power supply and the gas supply 

to the unit.

Thermostat

The room thermostat should be located on an inside 

wall where it will not be subject to drafts, sun exposure, 

or  heat  from  electrical  fixtures  or  appliances.  Follow 

manufacturer’s instructions enclosed with the thermostat 

for general installation procedures. Color-coded insulated 

wires (#18 AWG) should be used to connect the thermostat 

to the unit.

To Shut Down Unit

1. 

Turn off electrical power to unit.

2.  Move the gas valve switch to the “OFF” position (see 

Figure 8).

Содержание MGE4 Series

Страница 1: ...aving jurisdiction should be consulted before installation is made Such applicable regulations or requirements take precedence over the general instructions in this manual CAUTION P507858 01 P 507858...

Страница 2: ...NING Installation and servicing of air conditioning equipment can be hazardous due to internal refrigerant pressure and live electrical components Only trained and qualified service personnel should i...

Страница 3: ...lle accessories for safe operation Improper installations could result in property damage personal injury or death Minimum Unit Clearance Front Sides 1 1 Added clearance must be provided for the gas s...

Страница 4: ...protection clearances There is no minimum clearance required on locating the unit to an interior corner of a building If the unit is installed in a residential garage it must be located or protected...

Страница 5: ...the mounting bracket Keep this screw Carbon Monoxide Poisoning Hazard Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could re...

Страница 6: ...make sure that the proper louver kit is installed Due to the high temperatures of the combustion products released from the gas vent MGE gas package units require the use of either an aluminum louver...

Страница 7: ...c 0 4 w c 0 5 w c Rise Range F Mid Rise F SCFM Watts Temp Rise SCFM Watts Temp Rise SCFM Watts Temp Rise SCFM Watts Temp Rise SCFM Watts Temp Rise 3 4 Ton 15MGE4 11 091 P 15 45 30 TAP 1 FAN 430 46 370...

Страница 8: ...N A TAP 3 COOL N A N A N A N A 475 93 430 97 385 101 TAP 4 HEAT 450 50 40 405 53 44 355 57 50 N A N A N A N A N A N A TAP 5 HEAT N A N A N A N A N A N A 525 101 34 485 105 37 450 110 40 36MGE4 11 121...

Страница 9: ...N A N A TAP 3 COOL N A N A 765 184 730 191 675 201 630 206 TAP 4 HEAT 590 86 45 555 90 48 515 95 52 475 99 56 N A N A N A TAP 5 HEAT 715 129 38 680 135 39 650 140 41 615 146 44 585 151 46 48MGE4 11 18...

Страница 10: ...224 TAP 3 COOL 910 273 880 278 850 283 820 287 785 286 TAP 4 HEAT 600 89 45 560 93 48 520 96 52 485 100 56 N A N A N A TAP 5 HEAT N A N A N A 700 148 38 665 153 40 635 157 42 600 162 45 48MGE4 11 241...

Страница 11: ...38 670 141 40 635 146 42 600 151 45 48MGE4 11 301 P 35 65 50 TAP 1 FAN 490 55 465 65 435 72 415 81 390 89 TAP 2 COOL 930 239 900 243 885 250 835 256 805 262 TAP 3 COOL 1030 309 995 316 965 321 930 325...

Страница 12: ...38 685 135 39 650 140 41 615 145 44 48MGE4 11 361 P 35 65 50 TAP 1 FAN 615 82 580 86 540 91 500 96 450 102 TAP 2 COOL 1020 307 980 313 940 314 900 318 865 323 TAP 3 COOL 1040 329 1000 329 965 333 930...

Страница 13: ...Use thread sealant on the threaded fittings Install threaded fittings by hand only Do not over torque the fittings CAUTION Figure 6 Condensate Drain Installation Electrical Connections All wiring must...

Страница 14: ...r Fan Access Panel to Gas Valve and Burners Access Panel to Controls Manual Shutoff Valve with 1 8 NPT Plugged Tapping Accessible for Test Gauge Connection Field Supplied Filter Access Any conversion...

Страница 15: ...ed through flame sensor 5 Circulating air blower starts 30 seconds after the burners light 6 When the thermostat is satisfied the burners and combustion blower shut off 7 Circulating air blower will s...

Страница 16: ...he proper speeds have been preset at the factory for typical heating and cooling operation Refer to the wiring diagram for recommended heating cooling speeds for specific models Speeds may require adj...

Страница 17: ...tions which may contain chloride sulfites dust ammonia etc more frequent cleaning is required 2 Make sure there are no leaks of outside air into the return air system 3 Keep the outside louver grille...

Страница 18: ...6 16 5 8 32 7 8 for 45 Louver ASLEEVE6 5 6 45 16 16 5 8 45 1 8 8 Wall Sleeve Kit for 29 Louver ASLEEVE8 1 8 29 16 16 5 8 29 1 8 for 33 Louver ASLEEVE8 2 8 32 3 4 16 16 5 8 32 7 8 for 45 Louver ASLEEVE...

Страница 19: ...29 Height ALVRAL 1 Extruded Aluminum Louver Kit Custom Color 29 Height ALVRAL 1P Extruded Aluminum Louver Kit 33 Height ALVRAL 2 Extruded Aluminum Louver Kit Custom Color 33 Height ALVRAL 2P Extruded...

Страница 20: ...Page 20 of 21 507858 01 Issue 1922 Figure 9 Wiring Diagram 3 4 Ton through 2 Ton Wiring Diagrams...

Страница 21: ...507858 01 Issue 1922 Page 21 of 21 Figure 10 Wiring Diagram 2 1 2 Ton and 3 Ton...

Отзывы: