DV units with ECM motor have 5 pre-
programmed speeds to choose from. Which
speed is active is selected using the terminal
block.

How it works: Airflow, RPM and static pres-
sure is similar to a PSC motor but more sta-
ble and much more efficient.
1.

As system static pressure goes up, RPM
goes up and CFM goes down.

2.

At around 1050rpm, as SP increases,
CFM decreases rapidly down to zero at
1200rpm.

How to select the fan speed:
1.

Use the airflow tables or New Magic 4
Software to locate the desired operating
point.

2.

Identify the corresponding tap number
from the table.

3.

Move Violet wire (504) to the matching
connection on terminal block TB2.

How to integrate with 24V thermostat:
Connect R, C and G connections on terminal
block TB1 to matching connections on ther-
mostat. Energizing the G connection will start
the fan.

Figure 6

ECM Motor-Unit Wiring

ECM ELECTRICAL DATA

Unit Size

Coil

Motor

hp

115V

208-230V

DVB04

All

1/3

3.2

2.2

DVB06

All

DVB08

All

DVB10

All

1/2

6.8

4.1

Motor FLA

1/3

1/3

4.3

4.3

3

3

Notes:
1.

Motor is Regal Beloit Endura Pro or equiva-
lent (formerly model “X-13”).

2.

Overload Protection: ECM motor is electroni-
cally protected.

3.

Locked Rotor Amps: If motor speed decreas-
es below a programmed stall speed, the mo-
tor will shut down and after a delay period, the
control will attempt to restart the motor. Start-
ing current is limited to significantly less than
full load current.

4.

Agency Listings for the motor: UL File:
E100625 Vol. 9 for Motor, Vol. 7 Sect. 14 for
Control; CSA File: LR80176

Содержание DV SERIES

Страница 1: ...ly followed EXISTING DUCT WORK The previously installed air distribution system for heating requires close inspection to determine its suitability for cooling In general heating sys tems designed for...

Страница 2: ...035 000040 001 Page 2 of 16 DVB IOM 1 4 08 23 2016 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 3: ...Mounting 5 Ductwork 6 Condensate Drain 6 Refrigerant Chilled Water Piping 6 Freeze Protection 6 Auxiliary Drain Pan 6 Refrigerant Connections TXV or Orifice 7 Electrical 8 11 DIMENSIONAL DRAWINGS 12 1...

Страница 4: ...035 000040 001 Page 4 of 16 DVB IOM 1 4 08 23 2016 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 5: ...uction pip ing to unit DX coil NOTE Size and in stall per condensing unit manufacturer s recommendations 10 Connect chilled water supply and return piping to unit Chilled Water coil CAUTION Protect ca...

Страница 6: ...n in duced leak are some of the potential failure modes that are mitigated when an auxiliary pan is properly installed Professional installers rec ognize the value of protecting customer assets agains...

Страница 7: ...on The customer may size select and field install a piston to provide metering without a TXV For best results use of the facto ry TXV is recommended Field installable TXV is available as an accessory...

Страница 8: ...activate one of the 5 fan speeds The 24VAC 40VA control transformer allows the unit to power a thermostat and up to two water flow control valves See also Figure 8 WARNING CHECK MOTOR RATING PLATE FOR...

Страница 9: ...035 000040 001 Page 9 of 16 DVB IOM 1 4 08 23 2016 Figure 4 Access Panels Removed PSC Motor option shown Figure 5 ECM Motor Connection Detail J Box Replaced by control Box with ECM option...

Страница 10: ...nection on terminal block TB2 How to integrate with 24V thermostat Connect R C and G connections on terminal block TB1 to matching connections on ther mostat Energizing the G connection will start the...

Страница 11: ...035 000040 001 Page 11 of 16 DVB IOM 1 4 08 23 2016 Figure 7 ECM Motor Option Control Box Connections Terminal Block TB1 Terminal Block TB2...

Страница 12: ...035 000040 001 Page 12 of 16 DVB IOM 1 4 08 23 2016 Figure 8 Unit Dimensions Upflow...

Страница 13: ...035 000040 001 Page 13 of 16 DVB IOM 1 4 08 23 2016 Figure 9 Unit Dimensions Downflow...

Страница 14: ...035 000040 001 Page 14 of 16 DVB IOM 1 4 08 23 2016 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 15: ...ampers operating properly Is the filter clean Structural Is unit properly supported Is unit installed level necessary for proper condensate drainage Is properly sized condensate trap present Is the co...

Страница 16: ...035 000040 001 Page 16 of 16 DVB IOM 1 4 08 23 2016 DV Series Air Handling Unit Installation Operation and Maintenance Manual...

Отзывы: