©
Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice.
4
Installing control panel
The PVC box base is mounted onto the wall through using screws. The hole into the control box can be sealed with
silicon to prevent insects, or water to go in.
Wiring conduit
travels underground
and conceals into
the pillar wall
Let the remote control yellow
wire (antenna) come out 3
inch from the PVC box lower
ventilation hole.
Control
board
Remote
control
receiver
Pillar wall
Sideview
F11 control board
UR2 adjustable rotary switch is to adjust the amount of force (or weight)
for the controller to interpret as a valid obstacle to pause the gate motion.
Adjusting to the HARD (+) side means that it will required greater amount
of force.
Select limit switch
input mode
(Normally closed –
N.C or normally
opened –N.O). N.O.
option is to be
selected for Celmer
motor.
LDR Sensor
Pillar Light will only
function during the night
Cut the jumper wire to enable brake function to stop the
gate motion. Leave the jumper wire connected (default)
for Celmer. Celmer motor does not require this function.
Auto Close
Gate will automatically
close after 20 seconds