Installation sequence
1.
Perform assembling close to location of the greenhouse.
2.
Assemble greenhouse in accordance with photographs of assembling stages
and units represented in Fig.
6…14.
3.
Use support layout plan to install the greenhouse on a foundation (Fig.3).
When installing on the ground, dig a trench by the frame perimeter at a
depth of shovel blade on the site selected for greenhouse installation.
Install frame into the trench. Check equality of frame diagonals using a
cord. Total draft of greenhouse into the ground should be so that bottom
elements 10 of door opening touch the ground. Check equality of the
diagonals using a cord again and correct position of the frame angles.
4.
Level the frame using filling or deepening of the trench to make
longitudinal elements straight, horizontal and parallel to each other and to
make arcs even at side view. Perform final tightening of all screws.