background image

MACO M103C 

 

PACKING LIST 

 

PART   QTY   O.D. 

   SIZE        LENGTH          DESCRIPTION  

              CHECKLIST 

 

 

 

               

T59P 

   1 

1-1/2”       .050    

72”               ALUM TUBING SWAGED 1 END 6”           ___ 

      

T28           1         1-1/2”       .050

     

72”               ALUM TUBING   

 

 

___ 

T11P         3          5/8”  

   .050          72”               ALUM TUBING SLTD BOTH ENDS           ___ 

T04 

   2           ½” 

   .050          80 ½”            ALUM TUBING   

                             ___          

T01           4          ½”            .050          72”                ALUM TUBING   

 

 

___ 

P01P         1                           ¼” x 5”     5”                PLATE 1-1/2” BOOM TO 1-1/2” MAST 

___ 

G01P 

   1 

  

 

 

             GAMMA MATCH 

Z08P         2                            

 

             GAMMA STRAPS F/COAX CONNECTS    ___ 

S42           1                                                                  FEMALE COAX CONN W/MOUNTING     ___ 
   
 
 

HARDWARE BAG #1 

U02         7                           1-1/2”   

 

PLATED U-BOLTS 

 

 

___ 

S02          7                           1-1/2”   

 

PLATED SADDLES 

 

 

___ 

N03       14                           5/16”   

 

LOCK  NUTS    

 

 

___ 

 
 
 
 

HARDWARE BAG #2 

 

BE1P        3          1-1/2”    

 

 

BOOM TO ELEMENT MOUNT   

___ 

W58P       6            5/8” 

 

 

 

EXTRUDED ALUM CLAMPS 

 

___ 

S21          11                        10-24         ½” 

 

MACHINE SCREWS 

 

 

___ 

PL2          6                           .437 

 

 

PLASTIC CAP - BLACK  

 

___ 

N11 

 11 

                10-24   

 

SQUARE NUTS  

 

 

___ 

Z02P        2                           1/2” 

 

 

GAMMA STRAPS 

 

 

___ 

N12         4                            #10 

 

 

LOCKWASHER  

 

 

___ 

PL4         1 

 

 1-1/2”   

 

PLASTIC CAP - BLACK  

 

___ 

PL4R       1                          1-1/2”   

 

PLASTIC CAP – RED 

 

 

___ 

 

 

 

 

 

 

 

  1 

 

 

 

 

INSTRUCTION SHEET   

 

___ 

  

 

    WARRANTY 

SHEET/SAFETY 

SHEET 

___ 

 

  1 

 

 

 

 

TIP SHEET 

 

 

 

___ 

 

 

 

 
 
 
 
 Please note:  In an effort to keep the price on Maco Antennas down, we have decided not to clean up all 
the burrs and rough edges on the parts.  We recommend that you deburr and clean up each part with files, 
sandpaper, etc. so that they go together easily.  We are aware this needs to be done but have elected not to 
do it to save you the money we would have to add to the price of the kit for this service.

                  

 

 

 

 

 

 

 

 

Revised 5/09

                                                

 

Содержание M103C

Страница 1: ...M1 0 3 C w w w ma c o a n t e n n a s n e t ...

Страница 2: ...ELEMENT MOUNT ___ W58P 6 5 8 EXTRUDED ALUM CLAMPS ___ S21 11 10 24 MACHINE SCREWS ___ PL2 6 437 PLASTIC CAP BLACK ___ N11 11 10 24 SQUARE NUTS ___ Z02P 2 1 2 GAMMA STRAPS ___ N12 4 10 LOCKWASHER ___ PL4 1 1 1 2 PLASTIC CAP BLACK ___ PL4R 1 1 1 2 PLASTIC CAP RED ___ 1 INSTRUCTION SHEET ___ 1 WARRANTY SHEET SAFETY SHEET ___ 1 TIP SHEET ___ Please note In an effort to keep the price on Maco Antennas ...

Страница 3: ... with overhead power lines when raising your antenna Serious or fatal injury could result FIGURE 3 ELEMENT ASSEMBLY AND MOUNTING To assemble the elements use 4 of the clamps W58P and lO x l 2 screw and square nuts S2 1 Nl 1 as shown in the element assembly detail Insert a length of the l 2 O D unslotted tubing TOlP into each end of the element sections Adjust each end to the B dimensions and tight...

Страница 4: ...amma match and the screws holding the slider gamma straps ZO2P Next move the capacitor adjustment first one direction then the other until a minimum SWRreading is obtained If SWR is not yet satisfactory move the slider out 2 away from the boom If the reading has gone up move the slider back to the original position and then 2 towards the boom Now readjust the capacitor for minimum SWR You shouldno...

Страница 5: ...L4R RED PLASTIC CAP W DIRECTION O F RADIATION DIRECTORA PLI BLACK PLASTIC CAP DIRECTION REFLECTOR DRIVEN ELEMENT PL4R RED PLASTIC CAP GAMMA MATC SEE FIG 4 HORIZONTALLY POLARIZED FOR DETAILS OF BOOM ASSEMBLY AND MAST MOUNTING SEE FIG 2 FOR DETAILS OF ELEMENT ASSEMBLY AND MOUNTING SEE FIG 2 M103C 4 GENERALASSEMBLY QGURE J ...

Страница 6: ...S I PPROXIM C T28 BOOM SECTION BOOM SECTION l 1 2 O D MAST DETAIL 2B I i U02 S02 NOI N02 l 1 2 U BOLTS t SADDLES 5 16 NUTS W A S H E R S I I I I I I I I I I I I I I I f I I I i300M WITH I BOOM TO MAST I I PLATE ATTACHED u I I I I I I I I BOOM ASSEMBLY MAST MOUNITNG I I cCUSTOMER FURNlSHEb I I l 1 2 O D MAST DETAIL 28 I I L 5 M103C ...

Страница 7: ...TAILS ELEMENT MOUNTING DETAIL TO1 W58P TO1 PL2 w n I I I NOTE Assemble for the middle of the desired channels that is 27 200 for regular channel CB s as this is channel 20 29 400 29 599 16 11 5 s5 5 16 1 5 0 5 15 4 4 8 29 600 29 799 16 10 5 5 16 0 5 0 15 3 4 7 5 29 800 30 000 16 9 5 s4 5 15 10 4 11 15 2 4 7 ELEMENT ASSEMBLY MOUNTING M103C 6 ...

Страница 8: ...is is to let water out ADJUSTING THE STANDING WAVE RATIO SWR Refer to Figure 4 The dimensions given are approximate and should be used as a starting point The gamma match has 2 adjustments First is the capacitor adjust and second is the slider adjust Connect a SWR bridge coax between your transmitter and the antenna and check the SWR If adjustment is required loosen the clamp on the gamma match an...

Страница 9: ...t a c t y o u r l o c a l i n s t a l l e r i f c o n s u l t a t i o n o r a s s i s t a n c e i s r e q u i r e d A l l t o w e r a n d a n t e n n a i n s t a l l a t i o n s s h o u l d b e t h o r o u g h l y i n s p e c t e d a t l e a s t t w i c e a y e a r b y q u a l i f i e d e x p e r i e n c e d a n d t r a i n e d p e r s o n n e l t o i n s u r e p r o p e r p e r f o r m a n c e a ...

Отзывы: