background image

 

MS574 0210 0007

 

Page  4

 
CONTENTS MANUAL 

 
 
Safety instructions ................................................................................................................................... 2

 

Disposal - WEEE Directive ...................................................................................................................... 2

 

Safety rules and precautionary measures ............................................................................................... 2

 

About the operation manual .................................................................................................................... 3

 

Contents manual ...................................................................................................................................... 4

 

1.

 

Introduction ......................................................................................................................................... 5

 

1.1.

 

System description of the ER ......................................................................................... 5

 

2.

 

Operational ......................................................................................................................................... 6

 

2.1.

 

General .......................................................................................................................... 6

 

2.2.

 

Control panel .................................................................................................................. 6

 

2.3.

 

Operator information and functions ............................................................................... 7

 

3.

 

Configuration ...................................................................................................................................... 8

 

3.1.

 

Introduction .................................................................................................................... 8

 

3.2.

 

Programming SETUP-level ............................................................................................ 8

 

3.2.1.

 

General .......................................................................................................................... 8

 

3.2.2.

 

Overview functions SETUP level ................................................................................. 11

 

3.2.3.

 

Explanation of SETUP-functions.................................................................................. 12

 

1 - Total ................................................................................................................... 12

 

2 - Flowrate ............................................................................................................. 13

 

3 - Display ............................................................................................................... 14

 

4 - Power management .......................................................................................... 14

 

5 - Flowmeter .......................................................................................................... 15

 

6 - Others ................................................................................................................ 15

 

4.

 

Installation  ........................................................................................................................................ 16

 

4.1.

 

General directions ........................................................................................................  16

 

4.2.

 

Installation / surrounding conditions ............................................................................ 16

 

4.3.

 

Dimensions- Enclosure ................................................................................................ 17

 

4.4.

 

Installing the hardware .................................................................................................  19

 

4.4.1.

 

Introduction .................................................................................................................. 19

 

4.4.2.

 

Terminal connectors with power supply .......................................................................  19

 

5.

 

Maintenance ..................................................................................................................................... 22

 

5.1.

 

General directions ........................................................................................................  22

 

5.2.

 

Repair ........................................................................................................................... 22

 

Appendix A:

 

Technical specification ................................................................................................... 23

 

Appendix B:

 

Problem solving .............................................................................................................. 25

 

Index of this manual ............................................................................................................................... 26

 

List of figures in this manual .................................................................................................................. 27

 

List of configuration  settings ................................................................................................................. 28

 

Содержание ER-RMP

Страница 1: ...FLOWRATE INDICATOR TOTALIZER Electronic Register ER METER MOUNT REMOTE MOUNT ER RMA ER M ER RMP GA012P GB012P Signal input flowmeter NPN and Reed MS574 0210 0007...

Страница 2: ...on our products signifies that this product should not be disposed of in general waste or landfill Please contact your local dealer national distributor or Macnaught Technical Services for informatio...

Страница 3: ...rocedures which if not performed correctly may lead to personal injury a safety hazard or damage of the ER or connected instruments A caution indicates actions or procedures which if not performed cor...

Страница 4: ...8 3 2 2 Overview functions SETUP level 11 3 2 3 Explanation of SETUP functions 12 1 Total 12 2 Flowrate 13 3 Display 14 4 Power management 14 5 Flowmeter 15 6 Others 15 4 Installation 16 4 1 General d...

Страница 5: ...Configuration of the unit The ER has been designed to be implemented in many types of applications For that reason a SETUP level is available to configure your ER according to your specific requireme...

Страница 6: ...is meant for users operators 2 2 CONTROL PANEL The following keys are available Fig 2 Control Panel Functions of the keys This key is used to program and save new values or settings It is also used to...

Страница 7: ...rrows indicate the increase decrease of the flowrate trend Clear total The value for total can be re initialized To do so press CLEAR twice After pressing CLEAR once the flashing text PUSH CLEAR is di...

Страница 8: ...are to be observed Ensure that the measuring system is correctly wired up according to the wiring diagrams The housing may only be opened by trained personnel Take careful notice of the Safety rules i...

Страница 9: ...rd SETUP at the bottom of the display The number is a combination of two figures The first figure indicates the function group and the second figure the sub function Additionally each function is expr...

Страница 10: ...in the other direction When data is altered but ENTER is not pressed then the alteration can still be cancelled by waiting for 20 seconds or by pressing ENTER for three seconds the PROG procedure will...

Страница 11: ...our day 23 DECIMALS 0 1 2 3 Ref displayed value 24 K FACTOR 0 000010 9 999 999 25 DECIMALS K FACTOR 0 6 26 CALCULATION per 1 255 pulses 27 CUT OFF 0 1 999 9 seconds 3 DISPLAY 31 FUNCTION total flowrat...

Страница 12: ...bic meter The more accurate the K factor the more accurate the functioning of the system will be Example 1 Calculating the K factor Let us assume that the flowmeter generates 2 4813 pulses per liter a...

Страница 13: ...UP 21 for example per liter The more accurate the K factor the more accurate the functioning of the system will be For examples read SETUP 13 DECIMALS K FACTOR 25 This setting determines the number of...

Страница 14: ...display information influences the power consumption significantly When the application does not require a fast display update it is strongly advised to select a slow refresh rate Please understand t...

Страница 15: ...of a serious breakdown or to assess the suitability of your model for upgrade considerations VERSION SOFTWARE 62 For support and maintenance it is important to have information about the characteristi...

Страница 16: ...ontact is no longer assured when the housing cover is removed or the panel cabinet has been opened danger from electrical shock The housing may only be opened by trained personnel Take careful notice...

Страница 17: ...ENCLOSURE Aluminum enclosures ER RMA 75 mm 2 95 115 mm 4 53 PANEL MOUNT option 29 1 mm 1 15 31 mm 1 22 ER RMA M20 x 1 5 PG9 PG9 30mm 30mm 22 5mm 130 mm 5 12 120 mm 4 72 112 mm 4 40 60 mm 2 36 98 mm 3...

Страница 18: ...1 mm 1 15 31 mm 1 22 130 mm 5 12 120 mm 4 72 112 mm 4 40 60 mm 2 36 30mm 30mm D 16mm D 20mm D 16mm 22 5mm 115 mm 4 53 98 mm 3 86 PANEL MOUNT option ER RMP Fig 6 Dimensions GRP enclosures Meter Mount e...

Страница 19: ...ate cable glands with effective IP67 NEMA4X seals for all wires Unused cable entries ensure that you fit IP67 NEMA4X plugs to maintain rating A reliable ground connection for both the sensor and if ap...

Страница 20: ...wer is applied to these terminals the optional internal battery will be disabled enabled automatically to extend the battery life time Terminal 6 Power supply 8 2V sensor supply With this option a lim...

Страница 21: ...REED LP low pass filter read par 3 2 3 INTERNAL EXTERNAL Reed switch signal input 2 Common ground unit SIGNAL 1 GND shielding REED SWITCH 3 2V DC 1M low pass filter selection REED LP Flowmeter Termin...

Страница 22: ...rnal atmosphere of the ER in such a way that no condensation will occur for example by placing dry silica gel sachet in the casing just before closing it Furthermore it is required to replace or dry t...

Страница 23: ...95 LxHxD IP67 NEMA4X Drilling 2x PG9 1x M20 Drilling 2x 16mm 0 63 1x 20mm 0 78 Round meter mount enclosures Classification Type ER M Dimensions 161 x 87 5mm 5 10 x 2 38 xD IP67 NEMA 4X Aluminum meter...

Страница 24: ...all pulse signals Operator functions Displayed functions total and or flowrate total and accumulated total total can be reset to zero by pressing the CLEAR key twice Total Digits 7 digits Units L m3...

Страница 25: ...ETUP 26 27 The unit has to count the number of pulses according to SETUP 26 within the time according to SETUP 27 Make sure that 27 is set to 10 0 seconds for example the result is that the unit has a...

Страница 26: ...13 time unit 13 functional description 5 hardware version 3 installation 16 IP classification 16 keys 6 low battery 7 main function 9 maintenance 22 manual version 3 model 15 operational 6 operator le...

Страница 27: ...nel 6 Fig 3 Example of display information during process 7 Fig 4 Example of low battery alarm 7 Fig 5 Dimensions Aluminum enclosures 17 Fig 6 Dimensions GRP enclosures 18 Fig 6A Dimensions ER M serie...

Страница 28: ...010 27 cut off time 30 0 sec 3 DISPLAY 31 function total 32 backlight off 33 brightness 5 4 POWER MANAGEMENT 41 LCD new 1 sec 42 mode operational 5 FLOWMETER 51 signal NPN 6 OTHERS 61 model ER ER ER 6...

Отзывы: