background image

Normal Operation: 

The green LED indicator stays on when connected to mains supply. The indicator will 

turn off when the mains supply fails, or when the internal charger malfunctions, or when the luminaire is in 

test mode. 

Battery:

 

LiFePO4/ Ni-Cd rechargeable battery pack. Battery should be replaced when it reaches the end of its lifetime. 

To avoid damage to the luminiare and ensure its performance, the battery should be replaced with same type.

Test Switch:

 Press the test button, LED indicator will turn off and the luminaire will be powered by the battery 

pack. The light source is non-replaceable. When the light source reaches the end of its lifetime, the whole 

luminaire shall be replaced.

1.  Remove the diffuser from the base by screwdriver. 

1.  

Cut out size: L330 x W120mm.

Refer to step 1 and 2 of ceiling mount 

.

2. Fix the base onto the recessed bracket.

     

4. Fix the diffuser onto the base.

     

2. Pry the gear tray and get access to the mounting base

.

4. Fix the base onto the ceiling.

 Read instructions and check you have all the tools and accessories to complete the installation correctly

.

 

WARNING

1.Switch off before installation or maintenance.

2.Switch on only after complete installation and examination of the circuit.

3.Professional electrician for installation and maintenance only.

Turn Off

Power Supply

Installation Procedure

Ceiling Mount

Precautions

Recessed Mount (Recessed kit sold separately)

4.This luminaire is not intended for use in high-risk task area lighting.

DALI wiring

DALI wiring

* Wire“L”“N” to terminal block

* * Wire“L”“N” to terminal block, 

     Wire 2 x DALI signal wires to terminal on PCB.

* * Wire“L”“N” to terminal block , wire 2 x DALI signal wires to terminal on PCB

 3. Punch out the cable entry hole

,

 connect the mains cable to the terminal, and connect the battery onto the PCB. 

Choose maintained or non-maintained mode by connecting or removing the jumper cable.

 5. Fix the luminaire into the ceiling.

 6. Switch on, the green LED indicator will light up. 

L

: Live

Maintained (default) 

Non-Maintained 

SL

: Switched Live

N

: Neutral

L

SL

N

L

SL

N

Jumper cable connected

Jumper cable removed

 3. Punch out the cable entry hole, connect the mains cable to the terminal, and connect the battery onto the PCB. 

     Fix the mounting base onto wall. 

Choose maintained or non-maintained mode by connecting or removing the jumper cable.

* Wire“L”“N” to terminal block

L

: Live

Maintained (default) 

Non-Maintained 

SL

: Switched Live

N

: Neutral

L

SL

N

L

SL

N

Jumper cable connected

Jumper cable removed

5. Fix the housing onto the base.

6. Switch on, the green LED indicator will light up.

Battery

PCBA

Battery

PCBA

Battery

PCBA

Battery

PCBA

Battery

PCBA

Battery

PCBA

Battery

PCBA

Battery

PCBA

 

XYVEX EX-IP

IP65

LED indication 

Status   

Comments

Permanent green

System OK

Fast flashing green  

(0.1 sec. on -0.1 sec. off)

 

Function test underway

Slow flashing green

(1 sec. on –  1 sec. off)

Duration test

Red LED on 

Load failure

Open circuit /  Short circuit / LED failure

Slow flashing red

(1 sec. on -1 sec. off) 

Battery failure

Battery failed the duration test or function test/ 

Battery is defect / Incorrect battery voltage 

Fast flashing red

(0.1 sec. on -0.1 sec. off) 

Charging failure

Incorrect charging current

Binary transmission of 

Address identification

Provides the DALI short address of the fitting via binary

code. Red=1, Green=0. Example: 000011= SA3

Double pulsing green

Inhibit mode

Switching into inhibit mode via controller

Green and red off

Emergency mode

Battery operation (Emergency mode)

address via green/red LED

System status is indicated by a bi-colour LED and by a DALI status flag.

1. Instruction for Automatic test function

Once the unit is powered up, a self-diagnostics test will be 

automatically initiated:

  • Monitoring battery, lamp, charge status constantly.

Run 3mins function test every month.
Run 3H duration test every year.

  •
  •

Note: All test functions are preset and no need field adjustment.

2. Dual Colour LED Status Indicator Meaning

  •  Green indicator solid on:  Ready/ Normal Operation
  •  Red indicator flashes:      Require service

 •

 One flash, 4s pause

 Battery disconnected

 ••

 

Two flashes, 4s pause

 Low battery voltage

 •••

 

Three flashes, 4s pause 

 Charge board fault

 ••••

 Four flashes, 4s pause

 

AC/DC transfer fault

 •••••

 Five flashes, 4s pause

 LED lamp fault

Note: When the fault is recovered, press the test button for 2s, the red flashing 

         indicator will turn green. The fault is cleared, and the unit is back to normal.

            

 

3. Button Test

 Press test button once

 run a 30s duration test

 Press test button twice within 2s

 run a 3mins duration test

 Press test button 3 times within 2s

 run a 30mins duration test

 Press test button 4 times within 2s

run a 1H or 3H duration test

Status indication for DALI Versions

0.75 - 2.5mm²

Solid conductor or 

7 stranded wire ends

Cable Size & Strip Length

0.75 - 2.5mm²

Solid conductor or 

7 stranded wire ends

Cable Size & Strip Length

1:1

EP-E-EX5-0251B0

EPE-EX5

7-123037-2000135

王汝佳

20230901

说明书

深圳依炮尔科技有限公司

Epower Tech Co.,Ltd

B0

首次发行

要求:

285*210mm,70G书写纸,单色双面印刷。图中的字体、

图标、排版位置及颜色等我司提供的PDF文档做,

成品必须清晰整洁,请严格按1:1来不能有模糊或重影、

错位及残缺等现象。

 

XYVEX EX-IP

285 mm

210 mm

单位用量:1PCS
业务单号:郑丹萍   EP-ZE230713055
成品BOM:1-37000101-006052001     1-37000101-006052002

折叠如图:

285/2   210/2

 

 Read instructions and check you have all the tools and accessories to complete the installation correctly

.

 

WARNING

1.Switch off before installation or maintenance.

2.Switch on only after complete installation and examination of the circuit.

3.Professional electrician for installation and maintenance only.

Turn Off

Power Supply

4.This luminaire is not intended for high-risk task area lighting.

W

Normal Operation: 

The green LED indicator stays on when connected to mains supply. The indicator will turn 

off when the mains supply fails, or when the internal charger malfunctions, or when the luminaire is in test mode.   

Battery:

 LiFePO4/ Ni-Cd rechargeable battery pack. Battery should be replaced when it reaches the end of its 

lifetime. To avoid damage to the luminiare and ensure its performance, the battery should be replaced with same type. 

Test Switch:

 Press the test button, LED indicator will turn off and the luminaire will be powered by the battery pack. The 

light source is non-replaceable. When the light source reaches the end of its lifetime, the whole luminaire shall be replaced.

1. Accessories include screws, plastic nylon anchors for 

fixing on the wall. The space between two mounting 

holes on the wall is 240mm.

2. Pry off the front cover and get access to the 

mounting base.

2. Pry off the front cover and get access to the 

mounting base.

4. Install the 4 recessed springs onto the base.

5. Fix the luminaire onto the ceiling. Finish installation.

    Switch on.

1. Cut out size: L300-315mm x W160-175mm. Four 

springs for fixing the luminaire onto the ceiling.

2. Pry off the front cover and get access to the 

mounting base.

3. Punch out the hole for mains supply wires. Insert the screw into the nylon anchors, and then fix the mounting base 

onto wall. Connect the mains supply wires to the terminal, and connect the battery onto the PCBA.

Choose maintained or non-maintained mode by connecting or removing the jumper cap.

3. Punch out the hole for mains supply wires. Connect the mains supply wires to the terminal, and connect the battery 

onto the PCBA. Put the front cover back.

Choose maintained or non-maintained mode by connecting or removing the jumper cap.

4. Put the front cover back.

5. Finish installation. Switch on.

1. Fix hanging rope onto the ceiling.

Press to adjust the length 

of the suspension wire

x2

1

2

3

4

180mm

Pendant Mount

L

: Live

Maintained (default) 

Non-Maintained 

SL

: Switched Live

N

: Neutral

L

SL

N

L

SL

N

Jumper cable connected

Jumper cable removed

L

: Live

Maintained (default) 

Non-Maintained 

SL

: Switched Live

N

: Neutral

L

SL

N

L

SL

N

Jumper cable connected

Jumper cable removed

* Wire“L”“N” to terminal block

Battery

PCBA

jumper cap

SL

DALI wiring

wire 2 x DALI signal 

wires to terminal on PCB

* Wire“L”“N” to terminal block

Battery

PCBA

jumper cap

SL

DALI wiring

wire 2 x DALI signal 

wires to terminal on PCB

3. Punch out the hole for mains supply wires and two rope mounting holes on top of the mounting base. Connect the 

mains supply wires to the terminal, and connect the battery onto the PCBA.

5. Finish installation. Switch on.

4. Insert the rope into the mounting hole and secure with nuts. 

Put the front cover back.

* Wire“L”“N” to terminal block

Battery

PCBA

jumper cap

L

: Live

Maintained (default) 

Non-Maintained 

SL

: Switched Live

N

: Neutral

L

SL

N

L

SL

N

Jumper cable connected

Jumper cable removed

SL

Choose maintained or non-maintained mode by connecting or removing the jumper cap.

DALI wiring

wire 2 x DALI signal 

wires to terminal on PCB

 

XYVEX WALL

IP40

LED indication 

Status   

Comments

Permanent green

System OK

Fast flashing green  

(0.1 sec. on -0.1 sec. off)

 

Function test underway

Slow flashing green

(1 sec. on –  1 sec. off)

Duration test

Red LED on 

Load failure

Open circuit /  Short circuit / LED failure

Slow flashing red

(1 sec. on -1 sec. off) 

Battery failure

Battery failed the duration test or function test/ 

Battery is defect / Incorrect battery voltage 

Fast flashing red

(0.1 sec. on -0.1 sec. off) 

Charging failure

Incorrect charging current

Binary transmission of 

Address identification

Provides the DALI short address of the fitting via binary

code. Red=1, Green=0. Example: 000011= SA3

Double pulsing green

Inhibit mode

Switching into inhibit mode via controller

Green and red off

Emergency mode

Battery operation (Emergency mode)

address via green/red LED

System status is indicated by a bi-colour LED and by a DALI status flag.

1. Instruction for Automatic test function

Once the unit is powered up, a self-diagnostics test will be 

automatically initiated:

  • Monitoring battery, lamp, charge status constantly.

Run 3mins function test every month.
Run 3H duration test every year.

  •
  •

Note: All test functions are preset and no need field adjustment.

2. Dual Colour LED Status Indicator Meaning

  •  Green indicator solid on:  Ready/ Normal Operation
  •  Red indicator flashes:      Require service

 •

 One flash, 4s pause

 Battery disconnected

 ••

 

Two flashes, 4s pause

 Low battery voltage

 •••

 

Three flashes, 4s pause 

 Charge board fault

 ••••

 Four flashes, 4s pause

 

AC/DC transfer fault

 •••••

 Five flashes, 4s pause

 LED lamp fault

Note: When the fault is recovered, press the test button for 2s, the red flashing 

         indicator will turn green. The fault is cleared, and the unit is back to normal.

            

 

3. Button Test

 Press test button once

 run a 30s duration test

 Press test button twice within 2s

 run a 3mins duration test

 Press test button 3 times within 2s

 run a 30mins duration test

 Press test button 4 times within 2s

run a 1H or 3H duration test

Status indication for DALI Versions

Cable Size & Strip Length

0.75 - 2.5mm²

(0.75-1.5mm² for DALI)

Solid conductor or 

7 stranded wire ends

Cable Size & Strip Length

0.75 - 2.5mm²

(0.75-1.5mm² for DALI)

Solid conductor or 

7 stranded wire ends

Cable Size & Strip Length

0.75 - 2.5mm²

(0.75-1.5mm² for DALI)

Solid conductor or 

7 stranded wire ends

1:1

EP-E-EX7-0102B0

EPE-EX7

7-123037-2000137

王汝佳

20230901

说明书

深圳依炮尔科技有限公司

Epower Tech Co.,Ltd

B0

首次发行

要求:

285*210mm,70G书写纸,单色双面印刷。图中的字体、

图标、排版位置及颜色等我司提供的PDF文档做,

成品必须清晰整洁,请严格按1:1来不能有模糊或重影、

错位及残缺等现象。

285 mm

210 mm

单位用量:1PCS
业务单号:郑丹萍   EP-ZE230713055
成品BOM:1-37000101-003062044    1-37000101-003062045

折叠如图:

285/2   210/2

IP40

 

XYVEX WALL

Отзывы: