9
SECTION II - ASSEMBLY INSTRUCTIONS
PACKAGE CONTENTS
SKID
POLYBAG
BOLTBAG 12P
BOLT BAG 12PT/PTE
BASIC MACHINE
OWNER'S MANUAL
2 EA 3/8-
16X1” HHCS
4 EA
– 5/16-18 X ¾” CARRIAGE BOLT
CHIPPER HOPPER
ENGINE MANUAL
2 EA 3/8-16 NYLOCK NUT
4 EA
– 5/16 FLATWASHERS
HOPPER FLEX GUARD
WARRANTY CARD
4 EA 3/8-16 HEX NUT
4 EA
– 5/16-18 NYLOCK NUT
LH HANDLE (12P ONLY)
BOLTBAG
2 EA 3/8 INT. TOOTH LOCKWASHER
RH HANDLE (12P ONLY)
KNIFE GAUGE
2 EA 5/8 INT. TOOTH LOCKWASHER
2 EA 5/8-11 HEX NUT
12PTE
1 EA 5/16” SPACER
2 EA BLACK HANDLE GRIP
2 EA
– RED PLASTIC KEY
4 EA
– 5/16-18 X ¾” CARRIAGE BOLT
4 EA
– 5/16 FLATWASHERS
4 EA
– 5/16-18 NYLOCK NUT
STEP I
– UNPACKING AND CHECKING CONTENTS
1. Remove all items from the crate.
2. After unpacking the crate, compare the contents with the list above.
3. If assembling 12PT/PTE, compare bolt bag components with picture provided below.
4. If any parts are missing, contact your place of purchase at once.
5. Assembly should be done on a clean, level surface.
Bolt Bag Components
12PT/PTE
To start a 12PTE you must
insert the red plastic key as
shown below.
No key inserted
–
won’t start.
Key inserted
–
will start.