9
MAINTENANCE
DISASSEMBLY
Tools required
Preparation:
Place the twistlock on the base plate
(or into a bench vice if available)
with bolts facing upwards.
Use allen key to remove the
bolts of the yellow cone.
Remove upper spring.
Use allen key to remove the
bolts of the body.
Remove all parts to free the shaft.
Clean all parts.
1
2
3
Содержание Dry Cargo C8A-HC
Страница 14: ...Notes...
Страница 15: ...Notes...