![Mace Bumpa 110v 6m Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/mace/bumpa-110v-6m/bumpa-110v-6m_operators-manual_3195051019.webp)
19 |
P a g e
Scheduled Maintenance
Maintenance performed quarterly and annually must be completed by a person
trained and qualified to perform maintenance on this machine according to the
procedures found in the service manual for this machine.
Machines that have been out of service for more than three months must receive the
quarterly inspection before they are put back into service.
____________________________________________________________________________
Содержание Bumpa 110v 6m
Страница 1: ...1 P a g e Operators manual Bumpa 110v 6m 8m 10m MANUFACTURERS ORIGINAL INSTRUCTIONS MCE BUMPA 21 A1 3...
Страница 12: ...12 P a g e 1 Reverse 5 Forward 2 Stop 6 Stop 3 Forward 7 Reverse 4 Emergency stop CONTROLS...
Страница 34: ...34 P a g e Decal Diagram...
Страница 36: ...36 P a g e 6m Bumpa 8m Bumpa 10m Bumpa DIMENSIONS...
Страница 37: ...37 P a g e 6m Bumpa OPERATING ANGLES...
Страница 38: ...38 P a g e 8m Bumpa...
Страница 39: ...39 P a g e 10m Bumpa...