3.10
Installing Steps
NOTE:
The M105 has a left-hand platform only, whereas the M155 and M205 have left- and right-hand platforms.
Procedure for left-hand installation shown—right-hand installation similar.
1.
Remove the two existing upper bolts (A).
2.
Ensure the two lower bolts (B) are not threaded in fully.
Figure 3.98: Left-Hand Platform
3.
Hang step assembly on lower bolts (B) (back off bolts,
if necessary).
4.
Install two bolts (A) in upper holes of step and platform.
5.
Torque all bolts to 20 N·m (15 ft·lbf).
6.
M155 and M205 only:
Repeat for opposite step
assembly.
Figure 3.99: Left-Hand Steps Installed
147962
68
Revision A
Содержание M Series
Страница 2: ...Featuring the Dual Direction and Ultra Glide suspension on the M155 and M205 Published in August 2016 ...
Страница 5: ...Figure 2 EC Declaration of Conformity Windrower Lift Sling Page 2 of 2 147962 iii Revision A ...
Страница 7: ...Figure 4 EC Declaration of Conformity Windrower Assembly Supports Page 2 of 2 147962 v Revision A ...
Страница 10: ......
Страница 20: ......
Страница 33: ...UNLOADING THE WINDROWER 9 Unhook the remaining sling Figure 2 24 Platforms 147962 19 Revision A ...
Страница 40: ......
Страница 166: ......
Страница 332: ......
Страница 395: ......