![MacDon FlexDraper FD1 Series Скачать руководство пользователя страница 331](http://html2.mh-extra.com/html/macdon/flexdraper-fd1-series/flexdraper-fd1-series_unloading-and-assembly-instructions_3353032331.webp)
214685
319
Revision A
Figure 9.5: Flow Control
10. Ensure flow control (A) is set to position 6.
11. Ensure feeder house variable speed is set to
MINIMUM.
CAUTION
Never start or move the machine until you are sure all
bystanders have cleared the area.
12. Start combine and run the machine slowly for 5 minutes
while watching and listening
FROM THE OPERATOR
’
S
SEAT
for binding or interfering parts.
NOTE:
Reel and side drapers will not operate until oil flow fills
the lines.
13. Run the machine at operating speed for 15 minutes.
Listen for any unusual sounds or abnormal vibration.
14. Perform run-up check as listed on
(yellow sheet attached to this
instruction) to ensure the machine is field-ready.
9.1
Performing Post Run-Up Adjustments
Stop engine and perform post run-up check as listed on the Predelivery Checklist (yellow sheet attached to this
instruction
Predelivery Checklist, page 339
) to ensure machine is field-ready.
WARNING
To avoid bodily injury or death from unexpected startup of machine, always stop engine and remove key
before making adjustments to machine.
Some adjustments may be necessary after the run-up. Refer to the following:
•
9.1.1 Adjusting Knife, page 320
•
Содержание FlexDraper FD1 Series
Страница 2: ...FD1 Series FlexDraper Header Published June 2018...
Страница 12: ......
Страница 42: ......
Страница 45: ...214685 33 Revision A Figure 4 6 Filler Cap 10 Install filler cap A SETTING UP FLOAT MODULE...
Страница 72: ......
Страница 116: ......
Страница 153: ...214685 141 Revision A Figure 6 66 Deck Support Locations Left Shown Right Opposite PERFORMING PREDELIVERY CHECKS...
Страница 166: ......
Страница 336: ......
Страница 350: ......
Страница 353: ......