4. Remove the two bolts and nuts (A) securing the
base of the hose management arm (B) to the frame
channel (C). Retain bolts and nuts for use later.
5. Remove the other two bolts and nuts (D) from the
shipping plate (E). Retain bolts and nuts for use later.
Discard shipping plate (E).
Figure 3.3: Hydraulic Hose Management Arm
Base Frame
6.
25–35 Foot Headers:
With the sling attached to the
lifting device and supporting the hose management
arm (A), remove the two bolts and nuts (B) that secures
the hose management arm to the shipping support (C).
Figure 3.4: Hydraulic Hose Management Arm in
Shipping Position (30–35 Foot Headers)
214047
18
Revision A