background image

48.5-4 ASSEMBLY MANUAL 

 

10. Mount the BOOM TO MAST PLATE as shown on the DIMENSION SHEET and secure with two 2” U-bolts, 

cradles, stainless lockwashers and nuts. Two 2” U-Bolts and hardware are supplied for attaching the antenna 

to the mast.  

 

11. this completes the ASSEMBLY. When the antenna is installed in position on the mast, the main feedline 

can be attached and sealed at that time. REMEMBER to support the feedline at the antenna boom and on the 

mast or tower.  

 

 

 

Carefully Manufactured By 

M2 Antenna Systems, Inc.  

4402 N. Selland Ave.  

Fresno, CA 93722 

(559) 432-8873 Fax (559) 432-3059 

www.m2inc.com  email: [email protected] 

Отзывы: