M2 Antenna Systems 20M6-125 Скачать руководство пользователя страница 6

7. HAIRPIN MATCH ASSEMBLY: Refer to the HARDWARE ARRANGEMENT drawing.  Insert a 1/4-
20 X 2-1/4” bolt from inside the band clamp and Install the band clamp loosely positioned about 30” 
inches in front of the driven element. Mount the BALUN using the 2-1/2” U-bolt and cradle but do not 
over tighten. Remove the finger tight nuts over the hairpin clamp blocks and place the balun lead 
lugs over the studs and replace the nuts finger tight.  Next, slide the short bent end of the 3/8” tubes 
into the small hairpin clamp blocks and flush the ends of the tubes with the blocks. Align and tighten 
the clamp block bolts lightly. Install the shorting bar on the straight ends of the tubes and add the 1/4
-20 x 1/4” set screws, but do not tighten on to the tubes yet. Set to the proper shorting bar 
dimension, align and tighten the set screws securely. Move the band clamp under the shorting bar, 
add the 3/8” spacer tube on the stud and drop the shorting bar over the stud and add the locknut. 
Tighten the band clamp, and then tighten the nut. 
Refer to the DIMENSION SHEET. This dimension is from the inner edge of the shorting bar to the 
inner edge of the tube.  Install the main feedline or feed line jumper on the 1:1 balun. Tape the 
connector up carefully.  Use the large cable ties to secure the cable to the boom. 
 
8.  INSTALLING THE ELEMENT TIP SECTIONS:  Start with the REFLECTOR tip sections and 
insert each double wall 1” element butt into the 1-1/4” center sections. align the holes and insert the 
8-32 x 1-1/2” screws.  Add the locknuts and tighten securely. Continue adding the other tip sections 
until the antenna is complete. 
 

9. Determine the BALANCE POINT of the assembled antenna and mount the BOOM TO MAST 

PLATE using two 3 inch U-bolts, stainless steel lockwashers and nuts.  

 

10. OVERHEAD BOOM SUPPORT SYSTEM.  This antenna is supplied with both outer and inner 

overhead support systems.  The outer support system uses the supplied wire rope assemblies.  

Install turnbuckle plate to your mast at 48” 

minimum

 

from your boom.  Before hooking turnbuckles to 

turnbuckle plate open turnbuckles until just a thread or two from each end shows inside the 

turnbuckle body. Before you continue (SEE WIRE ROPE ASSEMBLY DETAIL SHEET & DIM 

SHEET) for more information. Complete wire rope assemblies as shown on wire rope assembly 

sheet.  Hook turnbuckles to turnbuckle plate & install the other end of wire assemblies to outer set of 

holes on the antenna boom (SEE DIM SHEET). 

 

The inner overhead boom support system uses 5/16” Dacron rope & eyebolts (3/8” X 6”).  Install 

eyebolts to inner eyebolt hole set on antenna boom. Use a 2nd turnbuckle plate and the 2 more 

turnbuckles and secure the upper end of the Dacron to your mast (SEE DIM SHEET).  Remember to 

open turnbuckles until just a thread or two from each end shows inside the turnbuckle body.  After 

final installation, do any minor boom straightening with the turnbuckles. Cut off any excess over one 

foot long.  Pull on the knots 

HARD 

to

 SET

 then use black vinyl electricians tape and tape excess 

cord back to main cord. Seal ends with heat or flame to prevent fraying. Then safety wire to prevent 

changes to settings.  

 

11.  Install side guy support system.  Use supplied Kevlar (1/8” X 120’) and cut as needed to get 4 

Kevlar pieces for your side support system (SEE DIMENSION SHEET FOR MORE INFORMATION). 

 
12. THIS COMPLETES THE ASSEMBLY.  When the antenna is installed in position on the mast, the 
main feedline can be attached and sealed at that time.  REMEMBER to support the feedline at the 
antenna boom and on the mast.  Leave an adequate feedline loop for rotation around the tower. 
Mount horizontally polarized VHF and UHF antennas at least 40” above or below this antenna to 
minimize interaction. 
 

M

2

 ANTENNA SYSTEMS, INC. 

4402 N. SELLAND AVE. 

FRESNO, CA 93722 

(559) 432-8873  FAX:432-3059 

www.m2inc.com   Email:  [email protected] 

20M6-125 ASSEMBLY MANUAL 

Содержание 20M6-125

Страница 1: ...rvival 16 Sq Ft 125 MPH Weight Ship Wt 240 Lbs 270 Lbs M2 Antenna Systems Inc Model No 20M6 125 FEATURES The 20M6 125 is a medium spaced high performance full band coverage 6 element Yagi computer opt...

Страница 2: ...20M6 125 DIMENSION SHEET NOTE HAIRPIN HAS BEEN ROUTED TO THE REAR OF ANTENNA SEE HAIRPIN ADDENDUM FOR MORE INFORMATION...

Страница 3: ...20M6 125 ASSEMBLY DETAILS...

Страница 4: ...20M6 125 HAIRPIN ADDENDUM NOTE HAIRPIN HAS BEEN ROUTED TO THE REAR OF ANTENNA TO AVOID INTERFEARENCE WITH OVERHEAD SUPPORT EYEBOLT...

Страница 5: ...element centering again and then tighten the clamp block bolts evenly to keep the plates parallel Repeat for the other two PARASITIC ELEMENTS 4 DRIVEN ELEMENT ASSEMBLY Refer to the HARDWARE ARRANGEME...

Страница 6: ...ith both outer and inner overhead support systems The outer support system uses the supplied wire rope assemblies Install turnbuckle plate to your mast at 48 minimum from your boom Before hooking turn...

Страница 7: ...of the assembly using the supplied wire nuts cable eye and turnbuckle as shown below In some WIRE ROPE Note Picture below is used only to show overhead support wire rope assembly detail Boom other com...

Страница 8: ...GENERIC COMPRESSION CLAMP DETAIL NOTE Generic layout to show how compression clamps work Your antenna may have one or the other or may even have both compression clamp sizes...

Страница 9: ...UBE 3 8 X 40 2 ELEMENT CLAMP BLOCK 3 X 6 X 1 2 M2AEC0041 12 MACHINED CRADLE 3 LD M2AMC0136 12 BALUN 1 1 3 30 MHZ STANDARD 1 TURNBUCKLE PLATE 2 X 5 X 25 M2APT0110 2 WIRE ROPE 1 8 X 334 WITH 3 8 FORGED...

Страница 10: ...59 NUT 5 16 18 SS 14 LOCKWASHER 5 16 SS 14 NUT 3 8 16 SS 18 LOCKWASHER 3 8 SPLIT RING SS 18 SCREW 8 32 X 1 3 4 SS 24 SCREW 8 32 X 1 1 2 SS 24 SCREW 8 32 X 1 1 4 SS 24 SCREW 8 32 X 1 2 SS 12 NUT 8 32...

Отзывы: