
11M5DX ASSEMBLY MANUAL
OVERHEAD GUY ASSEMBLY
7. If possible, attach the feedline to the balun and route it forward to about 12 feet from the rear of the
boom. Seal the connector with black tape, coax seal or equivalent. Now pick up the antenna and mark the
balance point. Center the BOOM TO MAST PLATE and secure to the boom with two 2”- U-bolts, cradles,
stainless lockwashers and nuts. 2” U-bolts are supplied for attaching the antenna to the mast.
8. To prepare the overhead guy system, begin by
temporarily
installing a 2” U-bolt through the
TURNBUCKLE PLATE and into the top set of 2” U-bolt holes on the boom to mast plate. Add a couple of
5/16” nuts to hold it in place. UNSCREW the turnbuckle eyes / hooks until only a thread or two shows
inside the turnbuckle body and hook them to turnbuckle plate.
9. Uncoil DACRON CORD. Secure one end to rear eyebolt, taking two turns through the eyebolt, then
adding three TIGHT half-hitches. Pull hard on cord to set the knots. Repeat for the front eyebolt. Seal cord
ends with heat (lighter, propane torch, etc) and tape to main length.
10. Equalize cord length at turnbuckle plate and cut. Put two turns trough rear turnbuckle eye. Pull the
Dacron rope as tight as possible and add three TIGHT half-hitches. Repeat for front cord section. Seal and
tape cord ends. When finished the overhead guys should be taught and laying parallel with the boom.
Now remove the turnbuckle plate from the boom to mast plate and lift it temporarily to note the
approximate height at which the boom becomes level. (usually about 3 feet).
11. During final installation on the tower / mast, secure the turnbuckle plate at the appropriate height with
the 2” U-bolt. Then lean or pull on the cords to increase the tension and help the knots take their final “set.”
Make sure the knots are not slipping. When the guy system has taken a “set”, loosen the 2” U-bolt and
adjust turnbuckle plate height until boom is straight and level. Finer adjustments can be made with the
turnbuckles at any time, if necessary.
12. This completes the ASSEMBLY.
REMEMBER to support the feedline at the antenna boom and on the mast. Leave an adequate feedline
loop for rotation around the tower. When stacking this antenna with other H.F. models, maintain at least 8’
separation; more if practical. Mount horizontally polarized VHF and UHF antennas at least 40” above or
below this antenna to minimize interaction.
Carefully designed and manufactured by:
M
2
ANTENNA SYSTEMS, INC.
4402 N. SELLAND AVE.
FRESNO, CA 93722
(559) 432-8873 FAX: 432-3059
www.m2inc.com Email: [email protected]
Содержание 11M5DX
Страница 4: ...11M5DX DIMENSION SHEET 45 25...
Страница 6: ...GENERIC COMPRESSION CLAMP DETAIL...