USING BEZELS

Bezels are used when the unit needs to be adapted to an ex-
isting panel cutout.  It is not required when the panel cutout 
size is as specified in the unit’s data sheet (31.5 × 138 mm).
Three types of bezels are selectable when ordering.
  Standard type:  Fits into M-System’s 48 Series’ panel
   

cutout (38 × 139.5 mm)

  Option /D type:  Fits into DIN panel cutout
   

(33 × 138 mm)

  Option /F type:  Fits into Fuji Electric PAJ, PAK, PBA,
   

etc, panel cutout (44 × 138 mm)

Slide the top and bottom parts of the bezel into the back of 
the front cover as shown below.

Bezel

When multiple units are to be clustered side by side, insert 
one bezel between two units as shown below.

• When mounting two or more indicators side by side:

 

HOW TO MOUNT THE UNIT ON A PANEL

1) Insert the unit into the panel cutout.  The watertight 

packing must be in place to hold the unit.  Do not remove 

it even when the protection is not required.

  The IP65 front cover protection is effective only with sin-

gle mounting, with the designated cutout size (31.5 

×

138 

mm).

Panel

Watertight Packing

2) Push the mounting brackets into the grooves on top and bot-

tom of the rear module, until they hit the panel’s rear side.

  Leave at least 3 centimeters both above and below the 

unit for ventilation.

Bracket

Содержание 48NAVD

Страница 1: ...conformity In order to enable the operator to turn off the power in put immediately install a switch or a circuit breaker ac cording to the relevant requirements in IEC 60947 2 and properly indicate it POWER INPUT RATING OPERATIONAL RANGE Locate the power input rating marked on the product and confirm its operational range as indicated below 100 240V and 85 264V AC rating 85 264V 50 60 Hz approx 5...

Страница 2: ...ve at the minimum of 3 cm above and below the units for heat dissipation Note 2 No bezel is needed when the panel is cut according to the above drawings Panel thickness 1 6 8 0 mm Panel thickness 1 6 8 0 mm Vertical Mounting Horizontal Mounting SINGLE MOUNTING Conform to degree of protection IP65 138 1 0 138 1 0 L 138 1 0 164 min L Panel thickness 1 6 8 0 mm L 31 5 36 N 1 N number of units Panel t...

Страница 3: ... mm Slide the top and bottom parts of the bezel into the back of the front cover as shown below Bezel When multiple units are to be clustered side by side insert one bezel between two units as shown below When mounting two or more indicators side by side HOW TO MOUNT THE UNIT ON A PANEL 1 Insert the unit into the panel cutout The watertight packing must be in place to hold the unit Do not remove i...

Страница 4: ...2 13 14 15 16 16 M3 SCREW TERMINALS Rounded corners for the option D 2 M3 SCREWS 144 5 67 137 5 5 41 4 1 16 36 1 42 OPTION D BEZEL 3 1 Space required when replacing the scale plate 2 Used for the existing panel cutout of M System 48 Series 38 139 5 mm 3 Used for the existing DIN panel cutout 33 138 mm 4 Used for the existing panel cutout of Fuji Electric PAJ PAK PBA 44 138 mm etc STANDARD BEZEL 2 ...

Страница 5: ...UT H OUTPUT LL OUTPUT L OUTPUT ALARM OUTPUT CODE 2 2 points ALARM OUTPUT CODE 4 4 points 2 WIRE XMTR MONITOR 1 5V DC V 2 WIRE XMTR MONITOR 1 5V DC V 4 20mA Input without Excitation INPUT 3 2 4 1 250Ω U V POWER U V La Lb Lc Hc Ha Hb H OUTPUT L OUTPUT POWER 1 2 3 4 1 2 3 4 WIRING INSTRUCTIONS SCREW TERMINAL Torque 0 6 N m SOLDERLESS TERMINAL Refer to the drawing below for recommended ring tongue ter...

Страница 6: ...or amber Zero Adj amber L Setpoint Adj Trip Indicator green UP Button Mode Selector DOWN Button H Setpoint L Setpoint PV Indicator M 50 40 30 20 10 0 10 20 30 40 50 m3 h 100 SET L Z S 90 80 70 60 50 40 30 20 10 0 H M Vertical Mounting Horizontal Mounting 50 40 30 20 10 0 10 20 30 40 50 m3 h 100 SET H S Z L 90 80 70 60 50 40 30 20 10 0 SET ENTER Button HH Setpoint Adj Trip Indicator red H Setpoint ...

Страница 7: ...e LED OFF LED Blinking Mode Selector 1 S SET S M Span Adjustment Complete SPAN ADJUSTMENT Apply 100 input signal before adjustment ALARM SETTING Proceed after the zero span adjustments 1 Keep pressing at least for 3 seconds to activate Mode Selector M Press briefly for second and more times within 1 minute after it has been activated 2 HH or LL setpoints are not provided for the 48NAVD 2 Note Each...

Страница 8: ... after it has been used to choose a indicator LED programming mode During this period pressing the M button briefly is enough to choose another indicator After 1 minute it turns to deactivated state CALIBRATION PROCEDURE This unit is calibrated at the factory to meet the ordered specifications therefore you usually do not need any cali bration For matching the indication to a receiving instrument ...

Отзывы: