![Lynx Utility Series Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/lynx/utility-series/utility-series_operators-manual_1953922044.webp)
BREAK-IN PERIOD
Engine
IMPORTANT: A break-in period of
10-15 hours (about 500 km) is required
for Rotax engines before running the
snowmobile at full throttle.
During break-in period,
maximum
throttle should not exceed ¾. How-
ever,
brief
full
acceleration
and
speed variations contribute to a good
break-in.
All models except 4-tec model:
To
assure additional protection during
the initial engine break-in, 500 ml of
recommended injection oil should be
added to fuel for the first full filling of
fuel tank.
Have spark plugs cleaned after engine
break-in.
Drive Belt
A new drive belt requires a break-in pe-
riod of 50 km. Avoid strong accelera-
tion/deceleration, pulling a load or high
speed cruising
10 Hour Inspection
We suggest that after the first 10
hours of operation— 500 km — or
30 days after the purchase, whichev-
er comes first, your snowmobile be
checked by an authorized Lynx dealer.
NOTE:
The 10 hour inspection is at
expense of the snowmobile owner.
42
______________________
Содержание Utility Series
Страница 1: ......
Страница 8: ...6 _______________________...
Страница 9: ...SAFETY INFORMATION ______________________ 7...
Страница 24: ...22 ______________________...
Страница 25: ...VEHICLE INFORMATION _____________________ 23...
Страница 83: ...MAINTENANCE INFORMATION _____________________ 81...
Страница 94: ...92 ______________________...
Страница 95: ...WARRANTY _____________________ 93...
Страница 101: ..._____________________ 99...
Страница 102: ...100 _____________________...
Страница 103: ......