12
|
LHPM POST MOUNTED HEATER CARE & USE/INSTALLATION
ASSEMBLY
...
continued
Arrange the burner head such that the wires and gas hose are arranged as illustrated. Feed a pull wire through the pole to
assist in pulling the three power wires into the pole and through the junction box. Firmly tape the pull wire to the power
wires. Lower the assembly into place while pulling the wires. Two people may be necessary for this operation.
STEP 2